[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106238":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1106238,781,2,"多选题","根据施工过程所需的劳动资料及其对产品所起的作用，将公路工程施工划分为（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","施工准备过程",true,{"key":16,"text":17,"correct":14},"B","主体工程施工过程",{"key":19,"text":20,"correct":14},"C","辅助工程及临时工程施工过程",{"key":22,"text":23,"correct":24},"D","操作过程",false,{"key":26,"text":27,"correct":14},"E","服务施工过程","ABCE","根据施工过程所需的劳动资料及其对产品所起的作用，将公路工程施工划分为施工准备过程、主体工程施工过程、辅助工程及临时工程施工过程、服务施工过程。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（交通工程）","建筑工程",0]