[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106213":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1106213,781,2,"多选题","以下的水泥混凝土的计量，正确的有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","计量应按监理人认可的并已完工工程的净尺寸计算",true,{"key":16,"text":17,"correct":14},"B","钢筋的体积不扣除",{"key":19,"text":20,"correct":14},"C","倒角不超过0.15m×0.15m时不扣除",{"key":22,"text":23,"correct":14},"D","体积不超过0.03m3的开孔及开口不扣除",{"key":25,"text":26,"correct":27},"E","面积不超过0.3m×0.3m的填角部分也不增加",false,"ABCD","本题考查的是工程计量规则的说明。水泥混凝土的计量应按监理人认可的并已完工工程的净尺寸计算，钢筋的体积不扣除，倒角不超过0.15m×0.15m时不扣除，体积不超过0.03m3的开孔及开口不扣除，面积不超过0.15m×0.15m的填角部分也不增加。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（交通工程）","建筑工程",0]