[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106210":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1106210,781,2,"多选题","公路工程计量工作的依据（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","质量合格证书",true,{"key":16,"text":17,"correct":14},"B","合同条款、工程量清单说明和计量规则",{"key":19,"text":20,"correct":14},"C","设计图纸",{"key":22,"text":23,"correct":14},"D","测量数据",{"key":25,"text":26,"correct":27},"E","业主的要求",false,"ABCD","本题考查的是工程计量的基础知识。计量的依据一般有质量合格证书、工程量清单说明、合同条件中的计量规则规定、技术规范中有关计量支付的内容（或独立的计量支付说明）和设计图纸及各种测量数据。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（交通工程）","建筑工程",0]