[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106102":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1106102,781,2,"多选题","隧道浅埋段基本工艺要点（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","短进尺",true,{"key":16,"text":17,"correct":14},"B","少扰动",{"key":19,"text":20,"correct":14},"C","强支护",{"key":22,"text":23,"correct":14},"D","早封闭",{"key":25,"text":26,"correct":27},"E","少观测",false,"ABCD","本题考查的是隧道开挖施工质量监理。基本工艺要点：短进尺，少扰动，强支护，早封闭，勤观测",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（交通工程）","建筑工程",0]