[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106043":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1106043,781,2,"多选题","沥青混合料的碾压接缝处理，正确的有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","在摊铺之前，对下层进行检查",true,{"key":16,"text":17,"correct":14},"B","纵缝上的混合料，应在摊铺机的后面立即用一台静力钢轮压路机以静力进行碾压",{"key":19,"text":20,"correct":14},"C","纵向接缝与横坡变坡线的重合应在15cm以内，与下层接缝应错开15cm以上",{"key":22,"text":23,"correct":24},"D","收工时，摊铺混合料的末端做成一道与铺筑方向成斜角的横向接缝",false,{"key":26,"text":27,"correct":14},"E","铺筑工作的安排应使纵、横向两种接缝都保持在最小数量","ABCE","本题考查的是沥青面层施工质量监理。选项D错误，当由于工作中断，摊铺混合料的末端已经冷却，或者在第二天恢复工作时，就应做成一道与铺筑方向大致成直角的横向接缝。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（交通工程）","建筑工程",0]