[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106021":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1106021,781,2,"多选题","下列选项中属于削坡减载施工的要求的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","自下而上逐级开挖",false,{"key":16,"text":17,"correct":18},"B","自上而下逐级开挖",true,{"key":20,"text":21,"correct":18},"C","严禁采用爆破法施工",{"key":23,"text":24,"correct":18},"D","开挖面上有裂缝时采取灌浆封闭",{"key":26,"text":27,"correct":18},"E","开挖坡面不得超挖","BCDE","削坡减载施工应符合下列规定：①应自上而下逐级开挖，严禁采用爆破法施工；②开挖坡面不得超挖，开挖面上有裂缝时应采取灌浆封闭等措施；③支挡及排水工程在边坡上分级实施时，宜开挖一级、实施一级。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（交通工程）","建筑工程",0]