[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106013":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1106013,781,2,"多选题","路基地下排水设施包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","蒸发池",false,{"key":16,"text":17,"correct":18},"B","渗沟",true,{"key":20,"text":21,"correct":18},"C","渗井",{"key":23,"text":24,"correct":18},"D","排水隧道",{"key":26,"text":27,"correct":18},"E","排水垫层","BCDE","本题考查的是路基排水工程、防护与支挡工程施工质量监理。路基地下排水设施包括排水垫层、暗沟暗道、渗沟、渗井、排水隧道等。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（交通工程）","建筑工程",0]