[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1105997":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1105997,781,2,"多选题","路基施工前，需要做以下哪些工作（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","施工单位需要建立工地试验室",true,{"key":16,"text":17,"correct":14},"B","路基填筑前，需要每公里至少取2个点样进行试验",{"key":19,"text":20,"correct":14},"C","沿线每500m宜有一个水准点",{"key":22,"text":23,"correct":14},"D","普通土样的试验指标包括天然含水率、液限、塑限、颗粒分析、击实、CBR",{"key":25,"text":26,"correct":27},"E","所有的土样需要做相对密度、有机质含量、易溶盐含量、冻和膨胀量试验",false,"ABCD","本题考查的是一般路基施工质量监理。选项E错误，土的试验项目应包括天然含水率、液限、塑限、颗粒分析、击实、CBR等，必要时还应做相对密度、有机质含量、易溶盐含量、冻和膨胀量试验。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（交通工程）","建筑工程",0]