[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1105995":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1105995,781,2,"多选题","平面控制测量采用的方法有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","卫星定位测量",true,{"key":16,"text":17,"correct":14},"B","导线测量",{"key":19,"text":20,"correct":14},"C","三角测量",{"key":22,"text":23,"correct":14},"D","三边测量方法",{"key":25,"text":26,"correct":27},"E","三角高程测量",false,"ABCD","本题考查的是一般路基施工质量监理。平面控制测量应采用卫星定位测量、导线测量、三角测量或三边测量方法进行。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（交通工程）","建筑工程",0]