[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1105881":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1105881,781,1,"单选题","以下关于安全生产费用描述错误的是（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","招标文件应结合本工程实际情况，单独列出相关安全、文明施工技术措施费用的清单项目，",false,{"key":16,"text":17,"correct":14},"B","要求投标单位在投标文件中明确相应的报价",{"key":19,"text":20,"correct":21},"C","安全生产费用的报价一般不低于投标价的1%",true,{"key":23,"text":24,"correct":14},"D","不得作为竞争性报价","招标文件应结合本工程实际情况，单独列出相关安全、文明施工技术措施费用的清单项目，要求投标单位在投标文件中明确相应的报价，安全生产费用的报价一般不低于投标价的1.5%，且不得作为竞争性报价，并在招标文件中明确支付条件、使用要求和调整方式等内容。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（交通工程）","建筑工程",0]