[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1105494":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1105494,781,1,"单选题","公路工程质量检验评定的顺序为（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","分部工程→分项工程→合同段→建设项目→单位工程",false,{"key":16,"text":17,"correct":14},"B","单位工程→分部工程→分项工程→合同段→建设项目",{"key":19,"text":20,"correct":14},"C","建设项目→合同段→单位工程→分部工程→分项工程",{"key":22,"text":23,"correct":24},"D","分项工程→分部工程→单位工程→合同段→建设项目",true,"本题考查的是质量评定与验收。工程质量评定等级分为合格与不合格，应按分项、分部、单位工程、合同段和建设项目逐级评定",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（交通工程）","建筑工程",0]