[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1105474":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1105474,781,1,"单选题","事故发生后,现场有关人员应立即向事故报告责任单位负责人报告。事故报告责任单位应在接报（ ）内,核实、汇总并向负责项目监管的交通运输主管部门及其工程质量监督机构报告。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1小时",false,{"key":16,"text":17,"correct":18},"B","2小时",true,{"key":20,"text":21,"correct":14},"C","一天",{"key":23,"text":24,"correct":14},"D","三天","本题考查的是质量缺陷与质量事故的处理。事故发生后,现场有关人员应立即向事故报告责任单位负责人报告。事故报告责任单位应在接报2小时内,核实、汇总并向负责项目监管的交通运输主管部门及其工程质量监督机构报告。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（交通工程）","建筑工程",0]