[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1105403":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1105403,781,1,"单选题","光缆线路工程质量控制要求，不符合规定的是（）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","光缆线路工程的控制重点是敷设及接续两个工序",false,{"key":16,"text":17,"correct":14},"B","施工前，应对到场光缆进行单盘测试检验",{"key":19,"text":20,"correct":14},"C","到场光缆光纤按100%的要求进行测试",{"key":22,"text":23,"correct":24},"D","光缆弯曲半径应大于其外径的10倍，敷设过程中杜绝出现“背扣”现象",true,"光缆线路工程的控制重点是敷设及接续两个工序，施工后应使每个光中继段的光传输特性符合设计文件和光电数字传输设备的技术要求。 ①施工前，应对到场光缆进行单盘测试检验，到场光缆光纤按100%的要求进行测试,保证准备施工的光缆技术指标符合设计技术要求。应对光缆经路及人（手）孔分布情况调查了解，监督施工单位的光缆配盘合理。 ②光缆敷设应根据人（手)孔间距长短决定采用气吹法或人工牵引法施工方法，光缆预留地点及长短应符合设计及规范要求，如接续预留、引人点预留，过桥涵等处预留，光缆弯曲半径应大于其外径的20倍，敷设过程中杜绝出现“背扣”现象。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（交通工程）","建筑工程",0]