[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1105394":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1105394,781,1,"单选题","公路隧道通风设施，检验风机安装基础的质量控制要点错误的是（）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","焊接风机座架专用U形卡,要求单面点焊",true,{"key":16,"text":17,"correct":18},"B","架焊接完成后，必须做抗拔力测试",false,{"key":20,"text":21,"correct":18},"C","试拉力为实际静载荷的15倍",{"key":23,"text":24,"correct":18},"D","拉力持续时间应在15min以上。","检验风机安装基础 (1)风机安装前按施工设计图纸对设备基础进行全面检查，安装位置、高程及尺寸应符合设备安装要求。 (2)焊接风机座架专用U形卡,要求双面满焊，焊条型号必须严格符合技术要求。 (3)座架焊接完成后，必须做抗拔力测试。测试拉力为实际静载荷的15倍，拉力持续时间应在15min以上。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（交通工程）","建筑工程",0]