[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1105346":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1105346,781,1,"单选题","注浆要求事项，不符合规定的是（）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","注浆前,进行试泵与注水试验,安装注浆管路和止浆塞",false,{"key":16,"text":17,"correct":14},"B","用1.5?2倍的注浆终压对注浆管路系统进行吸水试验检查，以查明管路系统能否耐压",{"key":19,"text":20,"correct":14},"C","注浆顺序一般为先压注内圈孔，后压注外圈孔",{"key":22,"text":23,"correct":24},"D","先压注有水孔，后压注无水孔",true,"4)注浆要求事项 (1)注浆前,进行试泵与注水试验,安装注浆管路和止浆塞。 (2)用1.5?2倍的注浆终压对注浆管路系统进行吸水试验检查，以查明管路系统能否耐压、有无漏水，连接是否正确,检查设备、机械状况是否正常。试运转的时间一般为20min。 (3)注浆顺序一般为先压注内圈孔，后压注外圈孔;先压注无水孔，后压注有水孔;先拱顶后边墙顺序向下压注;如遇串浆跑浆,则间隔一个孔或几个孔灌压。 (4)压注过程中注意对注浆压力、浆液配比、凝胶时间的控制。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（交通工程）","建筑工程",0]