[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1105340":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1105340,781,1,"单选题","施工监控测试内容和方案报监理工程师审批时，一般应该包括变形、应力和（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","温度",true,{"key":16,"text":17,"correct":18},"B","压力",false,{"key":20,"text":21,"correct":18},"C","时间",{"key":23,"text":24,"correct":18},"D","天气情况","施工监控测试内容和方案应报监理工程师审批，除设计图纸或监理工程师另有规定外，一般应包括下列内容： ①变形：主梁线形、高程、轴线偏差、索塔的水平位移。 ②应力：拉索索力、支座力以及梁塔应力在施工过程中的变化。 ③温度：温度场及指定测量时问内塔、梁、索的变化。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（交通工程）","建筑工程",0]