[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1105312":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1105312,781,1,"单选题","沉入桩基础基本要求，描述错误的是（）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工单位在沉桩之前应通知监理工程师，以便检查、测量",false,{"key":16,"text":17,"correct":14},"B","测定基桩轴线应填写记录",{"key":19,"text":20,"correct":21},"C","在陆地或静水区,基桩轴线定位不允许偏差：",true,{"key":23,"text":24,"correct":14},"D","基桩轴线定位允许偏差，每根基粧的纵横轴线位置为2cm","沉入桩基础基本要求 施工单位在沉桩之前应通知监理工程师，以便检查、测量。 (1)桩位应根据已测定基础的纵横中心线放出，并标志、固定。测定基桩轴线应填写记录。在陆地或静水区,基桩轴线定位允许偏差： ①每根基粧的纵横轴线位置为50px。 ②单排粧的每根基粧轴线位置为25px。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（交通工程）","建筑工程",0]