[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-47":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":540},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,47,50,2341,[13,38,53,67,82,97,112,126,140,155,168,182,195,208,219,234,249,263,277,286,295,304,319,331,340,354,363,372,381,395,410,424,439,449,463,474,484,498,508,520,529],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1105846,2,"多选题","下列选项中，一般工程的工程设计工作可以划分为()。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","专项施工方案设计",false,{"key":24,"text":25,"correct":26},"B","初步设计阶段",true,{"key":28,"text":29,"correct":22},"C","施工组织设计",{"key":31,"text":32,"correct":22},"D","技术设计阶段",{"key":34,"text":35,"correct":26},"E","施工图设计阶段","BE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1105848,"依据《国务院关于投资体制改革的决定》，对于企业不使用政府资金投资建设的工程实行()。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"审批制",{"key":24,"text":45,"correct":26},"核准制",{"key":28,"text":47,"correct":26},"备案制",{"key":31,"text":49,"correct":22},"公示制",{"key":34,"text":51,"correct":22},"招标制","BC",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":52,"analysis":37},1105850,"施工图审查机构按照有关法律、法规，对施工图涉及公共利益、公众安全和工程建设强制性标准的内容进行审查，审查的主要内容包括（）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"是否符合施工现场平面布置要求",{"key":24,"text":60,"correct":26},"是否符合工程建设强制性标准",{"key":28,"text":62,"correct":26},"地基基础和主体结构的安全性",{"key":31,"text":64,"correct":22},"勘察设计企业和注册职业人员以及相关人员是否按规定在施工图上盖章",{"key":34,"text":66,"correct":22},"是否符合设计合同要求",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1105853,"根据《国务院关于投资体制改革的决定》，对于采用()方式的政府投资项目，有关主管部门只审批资金申请报告。",[71,73,75,77,79],{"key":20,"text":72,"correct":26},"投资补助",{"key":24,"text":74,"correct":22},"资本金注入",{"key":28,"text":76,"correct":26},"贷款贴息",{"key":31,"text":78,"correct":22},"直接投资",{"key":34,"text":80,"correct":26},"转贷","ACE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1105855,"根据《国务院关于投资体制改革的决定》，下列工程只需由政府主管部门审批资金申请报告的有()。",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"采用投资补助方式的政府投资工程",{"key":24,"text":89,"correct":26},"采用转贷方式的政府投资工程",{"key":28,"text":91,"correct":26},"采用贷款贴息方式的政府投资工程",{"key":31,"text":93,"correct":22},"采用资本金注入方式的政府投资工程",{"key":34,"text":95,"correct":22},"采用直接投资方式的政府投资工程","ABC",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1105857,"下列选项中，建设工程实施阶段的工作内容主要包括()。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"建设准备及生产准备",{"key":24,"text":104,"correct":22},"项目建议书编制",{"key":28,"text":106,"correct":26},"勘察设计",{"key":31,"text":108,"correct":26},"施工安装及竣工验收",{"key":34,"text":110,"correct":22},"可行性研究报告编制","ACD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":125,"analysis":37},1105859,"下列选项中，属于施工图审查机构审查时的主要内容有()。",[116,118,119,121,123],{"key":20,"text":117,"correct":22},"设计单位的资质等级",{"key":24,"text":60,"correct":26},{"key":28,"text":120,"correct":26},"地基基础的安全性",{"key":31,"text":122,"correct":26},"主体结构的安全性",{"key":34,"text":124,"correct":22},"施工图设计范围是否超过初步设计批复内容","BCD",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":36,"analysis":37},1105861,"下列有关建设工程各阶段工作的内容中，表述正确的有()。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"批准的项目建议书是工程项目的最终决策",{"key":24,"text":133,"correct":26},"平整场地开始施工的日期不能算作正式开工日期",{"key":28,"text":135,"correct":22},"如果初步设计提出的总概算超过可行性研究报告总投资的5％以上时，应重新向原审批单位报批可行性研究报告",{"key":31,"text":137,"correct":22},"工程设计工作一般划分为两个阶段，其中包括技术设计阶段",{"key":34,"text":139,"correct":26},"生产准备是衔接建设和生产的桥梁，是工程项目建设转入生产经营的必要条件",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":154,"analysis":37},1105863,"对于采用直接投资和资本金注入方式的政府投资工程，政府需要审批的有()。",[144,146,148,150,152],{"key":20,"text":145,"correct":26},"项目建议书",{"key":24,"text":147,"correct":26},"可行性研究报告",{"key":28,"text":149,"correct":22},"资金申请报告",{"key":31,"text":151,"correct":26},"初步设计和概算",{"key":34,"text":153,"correct":22},"复工报告","ABD",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":111,"analysis":37},1105865,"下列选项中，属于办理工程质量监督手续时需要提供的材料的有()。",[159,161,163,165,166],{"key":20,"text":160,"correct":26},"中标通知书",{"key":24,"text":162,"correct":22},"招标文件",{"key":28,"text":164,"correct":26},"监理合同",{"key":31,"text":29,"correct":26},{"key":34,"text":167,"correct":22},"监理大纲",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":181,"analysis":37},1105867,"下列选项中，属于建设工程策划决策阶段工作内容的有()。",[172,174,175,177,179],{"key":20,"text":173,"correct":26},"项目建议书的编报和审批",{"key":24,"text":106,"correct":22},{"key":28,"text":176,"correct":22},"建设准备",{"key":31,"text":178,"correct":26},"可行性研究报告的编报和审批",{"key":34,"text":180,"correct":22},"施工安装","AD",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":194,"analysis":37},1105870,"根据《房屋建筑和市政基础设施工程施工图设计文件审查管理方法》，施工图设计文件的审查内容包括（ ）。",[186,188,190,192,193],{"key":20,"text":187,"correct":22},"准备必要的施工图纸",{"key":24,"text":189,"correct":26},"勘察设计企业和注册执业人员以及相关人员是否按规定在施工图上加盖相应的图章和签字",{"key":28,"text":191,"correct":22},"完成施工用水、电、通信、道路接通工作",{"key":31,"text":62,"correct":26},{"key":34,"text":60,"correct":26},"BDE",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":154,"analysis":37},1105872,"下列工作中，属于建设准备工作的有()。",[199,200,202,204,206],{"key":20,"text":187,"correct":26},{"key":24,"text":201,"correct":26},"办理施工许可手续",{"key":28,"text":203,"correct":22},"组建生产管理机构",{"key":31,"text":205,"correct":26},"办理工程质量监督手续",{"key":34,"text":207,"correct":22},"审查施工图设计文件",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":218,"analysis":37},1105882,"根据《国务院关于投资体制改革的决定》，下列工程只需审批资金申请报告的有（ ）。",[212,213,214,215,217],{"key":20,"text":87,"correct":26},{"key":24,"text":93,"correct":22},{"key":28,"text":91,"correct":26},{"key":31,"text":216,"correct":22},"采用银行货款方式的企业投资工程",{"key":34,"text":95,"correct":22},"AC",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":233,"analysis":37},1105884,"工程总承包模式具有（ ）的特点。",[223,225,227,229,231],{"key":20,"text":224,"correct":26},"有利于缩短建设工期",{"key":24,"text":226,"correct":26},"便于较早确定工程造价",{"key":28,"text":228,"correct":26},"有利于控制工程质量",{"key":31,"text":230,"correct":26},"工程项目责任主体单一",{"key":34,"text":232,"correct":22},"可减轻建设单位经济负担","ABCD",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":248,"analysis":37},1105889,"全过程工程咨询服务内容包括（ ）。",[238,240,242,244,246],{"key":20,"text":239,"correct":26},"投资决策综合性咨询",{"key":24,"text":241,"correct":26},"工程建设全过程咨询",{"key":28,"text":243,"correct":22},"造价咨询",{"key":31,"text":245,"correct":22},"技术咨询",{"key":34,"text":247,"correct":22},"法律咨询","AB",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":233,"analysis":37},1105891,"全过程工程咨询实施策略包括（ ）。",[253,255,257,259,261],{"key":20,"text":254,"correct":26},"加大人才培养引进力度",{"key":24,"text":256,"correct":26},"优化调整企业组织结构",{"key":28,"text":258,"correct":26},"创新工程咨询服务模式",{"key":31,"text":260,"correct":26},"加强现代信息技术应用",{"key":34,"text":262,"correct":22},"重视信息技术平台建设",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":233,"analysis":37},1105893,"下列属于工程建设程序的是（）。",[267,269,271,273,275],{"key":20,"text":268,"correct":26},"策划",{"key":24,"text":270,"correct":26},"设计",{"key":28,"text":272,"correct":26},"施工",{"key":31,"text":274,"correct":26},"投入生产",{"key":34,"text":276,"correct":22},"运营",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":154,"analysis":37},1105895,"对于采用直接投资和资本金注入方式的政府投资工程，政府需要从投资决策的角度审批（）。",[281,282,283,284,285],{"key":20,"text":145,"correct":26},{"key":24,"text":147,"correct":26},{"key":28,"text":149,"correct":22},{"key":31,"text":151,"correct":26},{"key":34,"text":153,"correct":22},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":111,"analysis":37},1105897,"建设工程实施阶段的工作内容主要包括（）。",[290,291,292,293,294],{"key":20,"text":176,"correct":26},{"key":24,"text":104,"correct":22},{"key":28,"text":106,"correct":26},{"key":31,"text":108,"correct":26},{"key":34,"text":110,"correct":22},{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":194,"analysis":37},1105899,"重大工程和技术复杂工程的工程设计工作一般划分为（）。",[299,300,301,302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":26},{"key":34,"text":35,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":318,"analysis":37},1105901,"下列关于建设工程新开工时间说法正确的是（）。",[308,310,312,314,316],{"key":20,"text":309,"correct":22},"平整场地开始施工的日期",{"key":24,"text":311,"correct":26},"不需开槽的工程，以正式开始打桩的日期作为正式开工日期",{"key":28,"text":313,"correct":26},"需要进行大量土石方工程的，以开始进行土石方工程作为正式开工日期",{"key":31,"text":315,"correct":22},"旧建筑物拆除开始施工的日期",{"key":34,"text":317,"correct":26},"建设工程设计文件中规定的任何一项永久性工程第一次正式破土开槽的开始日期","BCE",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":194,"analysis":37},1105903,"施工图设计文件审查的主要内容包括（）。",[323,325,327,329,330],{"key":20,"text":324,"correct":22},"专项施工方案",{"key":24,"text":326,"correct":26},"是否符合工程建设强制性规定",{"key":28,"text":328,"correct":22},"开工报告",{"key":31,"text":62,"correct":26},{"key":34,"text":189,"correct":26},{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":181,"analysis":37},1105906,"建设工程策划决策阶段的工作内容主要包括（）。",[335,336,337,338,339],{"key":20,"text":173,"correct":26},{"key":24,"text":106,"correct":22},{"key":28,"text":176,"correct":22},{"key":31,"text":178,"correct":26},{"key":34,"text":180,"correct":22},{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":36,"analysis":37},1105908,"应申请办理施工许可证的情形有（）。",[344,346,348,350,352],{"key":20,"text":345,"correct":22},"工程投资额在80万元以下的建筑工程",{"key":24,"text":347,"correct":26},"城镇市政基础设施工程的施工",{"key":28,"text":349,"correct":22},"建筑面积在500㎡以下的建筑工程",{"key":31,"text":351,"correct":22},"政府投资的建筑工程",{"key":34,"text":353,"correct":26},"各类房屋建筑及附属设施的建造",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":81,"analysis":37},1105910,"根据《国务院关于投资体制改革的决定》，对于采用（）方式的政府投资项目，有关主管部门只审批资金申请报告。",[358,359,360,361,362],{"key":20,"text":72,"correct":26},{"key":24,"text":74,"correct":22},{"key":28,"text":76,"correct":26},{"key":31,"text":78,"correct":22},{"key":34,"text":80,"correct":26},{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":125,"analysis":37},1105912,"施工图审查机构审查施工图时，审查的主要内容包括（）。",[367,368,369,370,371],{"key":20,"text":117,"correct":22},{"key":24,"text":60,"correct":26},{"key":28,"text":120,"correct":26},{"key":31,"text":122,"correct":26},{"key":34,"text":124,"correct":22},{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":111,"analysis":37},1105914,"办理工程质量监督手续时需要提供的材料包括（）。",[376,377,378,379,380],{"key":20,"text":160,"correct":26},{"key":24,"text":162,"correct":22},{"key":28,"text":164,"correct":26},{"key":31,"text":29,"correct":26},{"key":34,"text":167,"correct":22},{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":52,"analysis":37},1105916,"工程建设程序是建设工程策划决策和建设实施过程客观规律的反映，是（ ）的重要保证。",[385,387,389,391,393],{"key":20,"text":386,"correct":22},"有利于强化建设工程经营管理",{"key":24,"text":388,"correct":26},"建设工程科学决策",{"key":28,"text":390,"correct":26},"顺利实施",{"key":31,"text":392,"correct":22},"保证工程质量",{"key":34,"text":394,"correct":22},"顺利开展建设工程监理",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":409,"analysis":37},1105918,"下列属于工程总承包项目经理应履行职责的是（ ）。",[399,401,403,405,407],{"key":20,"text":400,"correct":26},"在授权范围内负责与项目干系人的协调，解决项目实施中出现的问题",{"key":24,"text":402,"correct":26},"对项目实施全过程进行策划、组织、协调和控制",{"key":28,"text":404,"correct":22},"参与工程变更的审查和处理",{"key":31,"text":406,"correct":22},"进行工程计量",{"key":34,"text":408,"correct":26},"代表企业组织实施工程总承包项目管理，对实现合同约定的项目目标负责","ABE",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":111,"analysis":37},1105920,"在策划决策阶段，可行性研究应完成的内容有（）。",[414,416,418,420,422],{"key":20,"text":415,"correct":26},"进行市场研究，以解决工程建设的必要性问题",{"key":24,"text":417,"correct":22},"经济效益和社会效益的初步估计",{"key":28,"text":419,"correct":26},"进行工艺技术方法研究，以解决工程建设的技术可行性问题",{"key":31,"text":421,"correct":26},"进行财务和经济分析，以解决工程建设的经济合理性问题",{"key":34,"text":423,"correct":22},"资源情况、建设条件、协作关系的初步分析",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":438,"analysis":37},1105923,"实施监理的工程，办理工程质量监督注册手续需提供的资料有( )",[428,430,432,434,436],{"key":20,"text":429,"correct":22},"必要的施工图纸",{"key":24,"text":431,"correct":26},"施工图设计文件审查报告和批准书",{"key":28,"text":433,"correct":26},"中标通知书和施工、监理合同",{"key":31,"text":435,"correct":26},"建设单位、施工单位和监理单位工程项目负责人和机构组成",{"key":34,"text":437,"correct":26},"施工组织设计和监理规划","BCDE",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":36,"analysis":37},1105925,"根据《国务院关于投资体制改革的决定》，对于采用资本金注入方式的政府投资工程，政府需要审批（ ）。",[443,444,445,447,448],{"key":20,"text":149,"correct":22},{"key":24,"text":145,"correct":26},{"key":28,"text":446,"correct":22},"工程开工报告",{"key":31,"text":29,"correct":22},{"key":34,"text":147,"correct":26},{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":111,"analysis":37},1105927,"项目建议书是拟建项目单位向政府投资主管部门提出的要求建设某一工程项目的建议文件，应包括的内容有（ ）。",[453,455,457,459,461],{"key":20,"text":454,"correct":26},"项目提出的必要性和依据",{"key":24,"text":456,"correct":22},"项目社会稳定风险评估",{"key":28,"text":458,"correct":26},"项目建设地点的初步设想",{"key":31,"text":460,"correct":26},"项目的进度安排",{"key":34,"text":462,"correct":22},"项目融资风险分析",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":154,"analysis":37},1105929,"工程总承包模式的特点有（ ）。",[467,468,469,471,472],{"key":20,"text":224,"correct":26},{"key":24,"text":226,"correct":26},{"key":28,"text":470,"correct":22},"可减轻施工单位合同管理负担",{"key":31,"text":230,"correct":26},{"key":34,"text":473,"correct":22},"工程总承包单位的选择范围大",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":438,"analysis":37},1105931,"(2014年真题)实施监理的工程，办理工程质量监督注册手续需提供的资料有（ ）。",[478,479,480,481,482],{"key":20,"text":429,"correct":22},{"key":24,"text":431,"correct":26},{"key":28,"text":433,"correct":26},{"key":31,"text":435,"correct":26},{"key":34,"text":483,"correct":26},"施工组织设计和监理规划（监理实施细则）",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":497,"analysis":37},1105933,"(2019年真题)项目建议书是针对拟建工程项目编制的建议文件，其主要内容包括（ ）",[488,489,491,493,495],{"key":20,"text":454,"correct":26},{"key":24,"text":490,"correct":26},"拟建规模和建设地点的初步设想",{"key":28,"text":492,"correct":22},"项目的技术可行性",{"key":31,"text":494,"correct":26},"项目投资估算",{"key":34,"text":496,"correct":26},"项目进度安排","ABDE",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":507,"analysis":37},1105935,"(2011年真题)根据《国务院关于投资体制改革的决定》，对采用（ ）方式的政府投资项目，有关主管部门只审批资金申请报告。",[502,503,504,505,506],{"key":20,"text":78,"correct":22},{"key":24,"text":74,"correct":22},{"key":28,"text":76,"correct":26},{"key":31,"text":72,"correct":26},{"key":34,"text":80,"correct":26},"CDE",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":438,"analysis":37},1105937,"(2019年真题)根据《房屋建筑和市政基础设施工程施工图设计文件审查管理办法》，审查施工图设计文件的主要内容包括（ ）",[512,514,515,516,518],{"key":20,"text":513,"correct":22},"结构选型是否经济合理",{"key":24,"text":120,"correct":26},{"key":28,"text":122,"correct":26},{"key":31,"text":517,"correct":26},"勘察设计企业是否按规定在施工图上盖章",{"key":34,"text":519,"correct":26},"注册执业人员是否按规定在施工图上签字，并加盖执业印章",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":154,"analysis":37},1105940,"(2015年真题)下列工作中，属于建设准备工作的有（ ）",[524,525,526,527,528],{"key":20,"text":187,"correct":26},{"key":24,"text":201,"correct":26},{"key":28,"text":203,"correct":22},{"key":31,"text":205,"correct":26},{"key":34,"text":207,"correct":22},{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":438,"analysis":37},1105942,"（2020年真题）工程监理企业发展为全过程工程咨询企业，需要作出的努力有（ ）。",[533,535,536,537,538],{"key":20,"text":534,"correct":22},"加强市场的宣传力度",{"key":24,"text":256,"correct":26},{"key":28,"text":254,"correct":26},{"key":31,"text":258,"correct":26},{"key":34,"text":539,"correct":26},"重视知识管理平台建设",[541,545,548,551,554,557],{"id":542,"name":543,"category":7,"favorite":544},1,"领导干部任职前廉政法规知识测试题",92,{"id":546,"name":547,"category":7,"favorite":542},595,"建筑结构与设备",{"id":549,"name":550,"category":7,"favorite":542},715,"招标采购专业知识与法律法规",{"id":552,"name":553,"category":7,"favorite":542},848,"市政方向-通用基础",{"id":555,"name":556,"category":7,"favorite":8},534,"BIM工程师",{"id":558,"name":556,"category":7,"favorite":8},535]