[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-39":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":683},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,39,50,2341,[13,38,53,68,83,98,112,126,141,156,169,183,198,209,219,234,242,251,266,279,294,302,316,329,343,351,364,372,385,393,407,421,435,443,458,473,488,502,516,530,543,557,571,585,598,612,626,640,654,668],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1105036,2,"多选题","监理实施细则中，监理工程师的监理工作方法有()。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","旁站",true,{"key":24,"text":25,"correct":22},"B","巡视",{"key":27,"text":28,"correct":22},"C","见证取样",{"key":30,"text":31,"correct":32},"D","试验",false,{"key":34,"text":35,"correct":22},"E","平行检测","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1105037,"项目监理机构的内部管理制度包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":32},"隐蔽工程质量验收制度",{"key":24,"text":45,"correct":32},"工程质量事故处理制度",{"key":27,"text":47,"correct":32},"监理工作报告制度",{"key":30,"text":49,"correct":22},"对外行文审核批准制度",{"key":34,"text":51,"correct":22},"监理工作日志制度","DE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1105038,"下列选项中，属于工程进度控制经济措施的有()。",[57,59,61,63,65],{"key":20,"text":58,"correct":32},"达到建设单位特定质量目标要求的，按合同支付工程质量补偿金或奖金",{"key":24,"text":60,"correct":22},"对工期提前者实行奖励",{"key":27,"text":62,"correct":32},"及时进行计划费用与实际费用的分析比较",{"key":30,"text":64,"correct":22},"对应急工程实行较高的计件单价",{"key":34,"text":66,"correct":22},"确保资金的及时供应","BDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1105039,"下列选项中属于工程监理规划中工程质量控制任务的有()。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"审查施工单位现场的质量管理组织机构",{"key":24,"text":75,"correct":22},"审查施工单位现场的管理制度",{"key":27,"text":77,"correct":32},"定期进行工程计量",{"key":30,"text":79,"correct":22},"复核施工控制测量成果",{"key":34,"text":81,"correct":22},"参加工程竣工验收","ABDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1105040,"工程质量控制的组织措施包括( )",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"建立健全项目监理机构",{"key":24,"text":90,"correct":32},"协助完善质量保证体系",{"key":27,"text":92,"correct":22},"制定有关质量监督制度",{"key":30,"text":94,"correct":22},"落实质量控制责任",{"key":34,"text":96,"correct":22},"完善职责分工","ACDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":36,"analysis":37},1105041,"根据《建设工程监理规范》，监理实施细则编写依据包括（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"已批准的建设工程监理规划",{"key":24,"text":105,"correct":22},"施工组织设计",{"key":27,"text":107,"correct":22},"与专业工程相关的标准.设计文件和技术资料",{"key":30,"text":109,"correct":32},"建设工程设计文件",{"key":34,"text":111,"correct":22},"专项施工方案",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":125,"analysis":37},1105042,"根据《建设工程监理规范》，除常规监理工作方法外，监理工程师还可采用的工作方法有（ ）。",[116,118,120,121,123],{"key":20,"text":117,"correct":22},"指令文件",{"key":24,"text":119,"correct":32},"平行检验",{"key":27,"text":28,"correct":32},{"key":30,"text":122,"correct":22},"监理通知",{"key":34,"text":124,"correct":22},"支付控制手段","ADE",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1105043,"（2020年真题）根据《建设工程监理规范》，监理规划应包括的内容有（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"工程概况",{"key":24,"text":133,"correct":22},"监理工作内容、范围、目标",{"key":27,"text":135,"correct":32},"工程风险分析与控制",{"key":30,"text":137,"correct":22},"工程质量、造价、进度控制和组织协调",{"key":34,"text":139,"correct":32},"工程监理重点、难点分析与建议","ABD",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1105045,"(2009年真题）对建设工程监理规划中项目监理机构人员配备方案审查的主要内容应当包括（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":32},"组织形式是否与项目承发包模式相协调",{"key":24,"text":148,"correct":32},"监理人员的职责分工是否合理",{"key":27,"text":150,"correct":22},"监理人员的专业满足程度",{"key":30,"text":152,"correct":22},"监理人员的数量满足程度",{"key":34,"text":154,"correct":22},"派驻现场人员计划是否与工程进度计划相适应","CDE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":155,"analysis":37},1105046,"(2010年真题）《建设工程监理规范》规定，编制监理实施细则的依据有（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":32},"监理合同",{"key":24,"text":163,"correct":32},"工程承包合同",{"key":27,"text":165,"correct":22},"已批准的监理规划",{"key":30,"text":167,"correct":22},"与专业工程相关的标准、设计文件和技术资料",{"key":34,"text":105,"correct":22},{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":155,"analysis":37},1105047,"(2010年真题）审核监理规划时，对监理组织机构审核的内容包括（ ）。",[173,175,177,179,181],{"key":20,"text":174,"correct":32},"是否理解了业主的工程建设意图",{"key":24,"text":176,"correct":32},"是否包括了全部委托的工作任务",{"key":27,"text":178,"correct":22},"是否与工程实施的具体特点相结合",{"key":30,"text":180,"correct":22},"是否与业主的组织关系相协调",{"key":34,"text":182,"correct":22},"是否与承包方的组织关系相协调",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":197,"analysis":37},1105048,"(2015年真题）根据《建设工程监理规范》（GB\u002FT 50319－2013），监理实施细则应包含的内容有（ ）。",[187,189,191,193,195],{"key":20,"text":188,"correct":32},"监理组织形式",{"key":24,"text":190,"correct":22},"监理工作流程",{"key":27,"text":192,"correct":22},"监理工作方法",{"key":30,"text":194,"correct":22},"监理工作要点",{"key":34,"text":196,"correct":22},"专业工程特点","BCDE",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":200,"answer":208,"analysis":37},1105049,[201,202,204,205,207],{"key":20,"text":188,"correct":32},{"key":24,"text":203,"correct":22},"监理工程流程",{"key":27,"text":192,"correct":22},{"key":30,"text":206,"correct":32},"监理工作制度",{"key":34,"text":196,"correct":22},"BCE",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":155,"analysis":37},1105050,"(2014年真题）根据《建设工程监理规范》（GBT50319-2013），监理实施细则应包含的内容有（ ）",[213,215,216,217,218],{"key":20,"text":214,"correct":32},"监理实施依据",{"key":24,"text":188,"correct":32},{"key":27,"text":190,"correct":22},{"key":30,"text":194,"correct":22},{"key":34,"text":192,"correct":22},{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":233,"analysis":37},1105051,"(2014年真题）监理规划中应明确的工程进度控制措施有（ ）。",[223,225,227,229,231],{"key":20,"text":224,"correct":22},"建立多级网络计划体系",{"key":24,"text":226,"correct":32},"严格审核施工组织设计",{"key":27,"text":228,"correct":22},"建立进度控制协调制度",{"key":30,"text":230,"correct":32},"按施工合同及时支付合同款",{"key":34,"text":232,"correct":22},"监控施工单位实施作业计划","ACE",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":236,"answer":233,"analysis":37},1105052,[237,238,239,240,241],{"key":20,"text":224,"correct":22},{"key":24,"text":226,"correct":32},{"key":27,"text":228,"correct":22},{"key":30,"text":230,"correct":32},{"key":34,"text":232,"correct":22},{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":52,"analysis":37},1105053,"(2012年真题）项目监理机构的内部管理制度包括（ ）。",[246,247,248,249,250],{"key":20,"text":43,"correct":32},{"key":24,"text":45,"correct":32},{"key":27,"text":47,"correct":32},{"key":30,"text":49,"correct":22},{"key":34,"text":51,"correct":22},{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":265,"analysis":37},1105054,"(2011年真题）监理规划的编写依据包括（ ）。",[255,257,259,261,263],{"key":20,"text":256,"correct":22},"监理大纲",{"key":24,"text":258,"correct":32},"工程分包合同",{"key":27,"text":260,"correct":22},"工程设计文件",{"key":30,"text":262,"correct":22},"工程施工承包合同",{"key":34,"text":264,"correct":32},"工程施工组织设计文件","ACD",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":155,"analysis":37},1105055,"(2011年真题）监理规划中质量控制的组织措施包括（ ）。",[270,272,274,275,277],{"key":20,"text":271,"correct":32},"严格质量检查与监督",{"key":24,"text":273,"correct":32},"拒付不合格工程的款项",{"key":27,"text":94,"correct":22},{"key":30,"text":276,"correct":22},"完善监理人员职责分工",{"key":34,"text":278,"correct":22},"制定质量监督管理制度",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":293,"analysis":37},1105056,"(2015年真题）监理规划中应明确的安全生产管理措施有（ ）。",[283,285,287,289,291],{"key":20,"text":284,"correct":32},"组织验收施工起重机械的安全性能",{"key":24,"text":286,"correct":22},"督促施工单位落实安全技术措施",{"key":27,"text":288,"correct":22},"审查施工单位的安全生产规章制度",{"key":30,"text":290,"correct":22},"督促施工单位落实应急救援预案",{"key":34,"text":292,"correct":32},"制定危险性较大的分部工程旁站方案","BCD",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":296,"answer":293,"analysis":37},1105057,[297,298,299,300,301],{"key":20,"text":284,"correct":32},{"key":24,"text":286,"correct":22},{"key":27,"text":288,"correct":22},{"key":30,"text":290,"correct":22},{"key":34,"text":292,"correct":32},{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":140,"analysis":37},1105058,"(2019年真题）下列监理规划的审核内容中，属于履行安全生产管理的监理法定职责内容的有（ ）。",[306,308,310,312,314],{"key":20,"text":307,"correct":22},"是否建立了对施工组织设计、专项施工方案的审查制度",{"key":24,"text":309,"correct":22},"是否建立了对现场安全隐患的巡视检查制度",{"key":27,"text":311,"correct":32},"是否结合工程特点建立了与建设单位的沟通协调机制",{"key":30,"text":313,"correct":22},"是否建立了安全生产管理状况的监理报告制度",{"key":34,"text":315,"correct":32},"是否确定了质量、造价、进度三大目标控制的相应措施",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":293,"analysis":37},1105059,"(2019年真题）根据《建设工程监理规范》监理实施细则编写的依据有（ ）。",[320,322,323,325,327],{"key":20,"text":321,"correct":32},"建设工程施工合同文件",{"key":24,"text":165,"correct":22},{"key":27,"text":324,"correct":22},"与专业工程相关的标准",{"key":30,"text":326,"correct":22},"已批准的施工组织设计、(专项)施工方案",{"key":34,"text":328,"correct":32},"施工单位的特定要求",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":155,"analysis":37},1105060,"(2018年真题）下列工作流程中，监理工作涉及的有（ ）。",[333,335,337,339,341],{"key":20,"text":334,"correct":32},"分包单位招标选择流程",{"key":24,"text":336,"correct":32},"质量三检制度落实流程",{"key":27,"text":338,"correct":22},"隐蔽工程验收流程",{"key":30,"text":340,"correct":22},"质量问题处理审核流程",{"key":34,"text":342,"correct":22},"开工审核工作流程",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":345,"answer":155,"analysis":37},1105061,[346,347,348,349,350],{"key":20,"text":334,"correct":32},{"key":24,"text":336,"correct":32},{"key":27,"text":338,"correct":22},{"key":30,"text":340,"correct":22},{"key":34,"text":342,"correct":22},{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":293,"analysis":37},1105062,"(2018年真题）根据《建设工程监理规范》，属于监理规划主要内容的有（ ）。",[355,357,358,360,362],{"key":20,"text":356,"correct":32},"安全生产管理制度",{"key":24,"text":206,"correct":22},{"key":27,"text":359,"correct":22},"监理工作设施",{"key":30,"text":361,"correct":22},"工程造价控制",{"key":34,"text":363,"correct":32},"工程进度计划",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":366,"answer":293,"analysis":37},1105063,[367,368,369,370,371],{"key":20,"text":356,"correct":32},{"key":24,"text":206,"correct":22},{"key":27,"text":359,"correct":22},{"key":30,"text":361,"correct":22},{"key":34,"text":363,"correct":32},{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":52,"analysis":37},1105064,"(2017年真题）下列制度中，属于项目监理机构内部工作制度的有（ ）。",[376,378,380,382,383],{"key":20,"text":377,"correct":32},"施工备忘录签发制度",{"key":24,"text":379,"correct":32},"施工组织设计审核制度",{"key":27,"text":381,"correct":32},"工程变更处理制度",{"key":30,"text":51,"correct":22},{"key":34,"text":384,"correct":22},"监理业绩考核制度",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":387,"answer":52,"analysis":37},1105065,[388,389,390,391,392],{"key":20,"text":377,"correct":32},{"key":24,"text":379,"correct":32},{"key":27,"text":381,"correct":32},{"key":30,"text":51,"correct":22},{"key":34,"text":384,"correct":22},{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":208,"analysis":37},1105066,"(2016年真题）项目监理机构控制工程进度的主要工作包括（ ）。",[397,399,401,403,405],{"key":20,"text":398,"correct":32},"审查施工方案",{"key":24,"text":400,"correct":22},"审查施工总进度计划和阶段性施工进度计划",{"key":27,"text":402,"correct":22},"检查施工总进度计划的实施情况",{"key":30,"text":404,"correct":32},"进行工程计量",{"key":34,"text":406,"correct":22},"比较分析工程施工实际进度与计划进度",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":36,"analysis":37},1105067,"(2016年真题）实行施工总承包的工程，专项施工方案可由专业分包单位组织编制的有（ ）。",[411,413,415,417,419],{"key":20,"text":412,"correct":22},"起重机械安装",{"key":24,"text":414,"correct":22},"起重机械拆卸",{"key":27,"text":416,"correct":22},"附着式升降脚手架",{"key":30,"text":418,"correct":32},"主体结构工程施工",{"key":34,"text":420,"correct":22},"深基坑开挖",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":52,"analysis":37},1105068,"(2016年真题）下列工程造价控制内容中，属于工程造价动态比较内容的有（ ）。",[425,427,429,431,433],{"key":20,"text":426,"correct":32},"工程造价控制计划的编制",{"key":24,"text":428,"correct":32},"工程造价控制计划的审核",{"key":27,"text":430,"correct":32},"工程造价偏差的纠正",{"key":30,"text":432,"correct":22},"工程造价目标值的预测分析",{"key":34,"text":434,"correct":22},"工程造价目标分解值与实际值的比较",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":437,"answer":52,"analysis":37},1105069,[438,439,440,441,442],{"key":20,"text":426,"correct":32},{"key":24,"text":428,"correct":32},{"key":27,"text":430,"correct":32},{"key":30,"text":432,"correct":22},{"key":34,"text":434,"correct":22},{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":457,"analysis":37},1105072,"下列选项中，属于总监理工程师负责制原则内涵的有()。",[447,449,451,453,455],{"key":20,"text":448,"correct":22},"总监理工程师是工程监理的责任主体",{"key":24,"text":450,"correct":22},"总监理工程师是工程监理的权力主体",{"key":27,"text":452,"correct":32},"总监理工程师是工程监理的质量主体",{"key":30,"text":454,"correct":32},"总监理工程师是工程监理的造价主体",{"key":34,"text":456,"correct":22},"总监理工程师是工程监理的利益主体","ABE",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":472,"analysis":37},1105073,"建设工程采用施工总承包模式的主要缺点有()。",[462,464,466,468,470],{"key":20,"text":463,"correct":22},"建设周期较长",{"key":24,"text":465,"correct":32},"协调工作量大",{"key":27,"text":467,"correct":32},"质量控制较难",{"key":30,"text":469,"correct":32},"合同管理较难",{"key":34,"text":471,"correct":22},"投标报价较高","AE",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":487,"analysis":37},1105074,"施工总承包模式的优点之一是利于质量控制，其原因在于()。",[477,479,481,483,485],{"key":20,"text":478,"correct":22},"有分包单位的自控",{"key":24,"text":480,"correct":22},"有总包单位的监督",{"key":27,"text":482,"correct":22},"有监理单位的检查认可",{"key":30,"text":484,"correct":32},"有合同约束与分包单位之间相互制约",{"key":34,"text":486,"correct":32},"有监理单位监督与分包单位之间相互制约","ABC",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":457,"analysis":37},1105075,"下列原则中，属于实施建设工程监理应遵循的原则有()。",[492,494,496,498,500],{"key":20,"text":493,"correct":22},"权责一致",{"key":24,"text":495,"correct":22},"综合效益",{"key":27,"text":497,"correct":32},"严格把关",{"key":30,"text":499,"correct":32},"利益最大",{"key":34,"text":501,"correct":22},"热情服务",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":125,"analysis":37},1105076,"下列选项中，属于工程总承包模式优点的有()。",[506,508,510,512,514],{"key":20,"text":507,"correct":22},"有利于工程造价控制",{"key":24,"text":509,"correct":32},"有利于质量控制",{"key":27,"text":511,"correct":32},"建设单位择优选择工程总承包单位的范围大",{"key":30,"text":513,"correct":22},"合同关系简单，组织协调工作量小",{"key":34,"text":515,"correct":22},"可缩短建设周期",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":36,"analysis":37},1105078,"工程监理单位受建设单位委托实施工程监理时，应遵循的基本原则有()。",[520,522,524,526,528],{"key":20,"text":521,"correct":22},"综合效益的原则",{"key":24,"text":523,"correct":22},"公平、独立、诚信、科学的原则",{"key":27,"text":525,"correct":22},"权责一致的原则",{"key":30,"text":527,"correct":32},"监理单位法人负责制的原则",{"key":34,"text":529,"correct":22},"严格监理，热情服务的原则",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":487,"analysis":37},1105079,"建设工程采用工程总承包模式的优点有()。",[534,536,538,539,541],{"key":20,"text":535,"correct":22},"合同关系简单",{"key":24,"text":537,"correct":22},"有利于进度控制",{"key":27,"text":507,"correct":22},{"key":30,"text":540,"correct":32},"有利于工程质量控制",{"key":34,"text":542,"correct":32},"合同管理难度小",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":97,"analysis":37},1105085,"关于采用建设工程施工总承包模式特点的说法，正确的是（ ）。",[547,549,551,553,555],{"key":20,"text":548,"correct":22},"由于既有施工分包单位的自控，又有施工总承包单位监督，还有工程监理单位的检查认可，有利于工程质量控制",{"key":24,"text":550,"correct":32},"比平行发包增加协调工作量",{"key":27,"text":552,"correct":22},"施工总承包单位具有控制的积极性，施工分包单位之间也有相互制约的作用，有利于总体进度的协调控制",{"key":30,"text":554,"correct":22},"总包合同价可较早确定，有利于控制工程造价",{"key":34,"text":556,"correct":22},"由于施工合同数量比平行承发包模式更少，有利于建设单位的合同管理",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":197,"analysis":37},1105086,"建设工程采用设计—施工总承包模式的特点有（ ）。",[561,563,565,567,569],{"key":20,"text":562,"correct":32},"建设单位招标发包工作难度小",{"key":24,"text":564,"correct":22},"建设单位的组织协调工作量小",{"key":27,"text":566,"correct":22},"工程总承包单位的选择范围小",{"key":30,"text":568,"correct":22},"建设单位的合同数量少",{"key":34,"text":570,"correct":22},"有利于工程设计与施工的相互搭接",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":155,"analysis":37},1105087,"监理单位向建设单位提交的监理工作总结报告内容包括（ ）。",[575,577,579,581,583],{"key":20,"text":576,"correct":32},"建设工程监理工作的成效和经验",{"key":24,"text":578,"correct":32},"工程监理工作中发现的问题、处理情况及改进建议",{"key":27,"text":580,"correct":22},"监理合同履行情况概述和监理任务完成情况评价",{"key":30,"text":582,"correct":22},"建设单位提供的供项目监理机构使用的办公用房、车辆、试验设施等的清单",{"key":34,"text":584,"correct":22},"监理工作终结情况的说明",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":208,"analysis":37},1105088,"向建设单位提交的监理工作总结报告内容包括（ ）。",[589,591,593,595,597],{"key":20,"text":590,"correct":32},"监理大纲的主要内容及编制情况",{"key":24,"text":592,"correct":22},"工程监理合同履行情况",{"key":27,"text":594,"correct":22},"监理任务及目标完成情况评价",{"key":30,"text":596,"correct":32},"建设单位提供的设备清单",{"key":34,"text":584,"correct":22},{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":36,"analysis":37},1105091,"下列选项中，属于项目监理机构人员数量的确定方法步骤有()。",[602,604,606,608,610],{"key":20,"text":603,"correct":22},"项目监理机构人员需要量定额",{"key":24,"text":605,"correct":22},"确定工程建设强度",{"key":27,"text":607,"correct":22},"确定工程复杂程度",{"key":30,"text":609,"correct":32},"根据工程投资和工程工期套用监理人员需要量定额",{"key":34,"text":611,"correct":22},"根据实际情况确定监理人员数量",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":197,"analysis":37},1105092,"下列选项中，属于总监理工程师职责的有()。",[616,618,620,622,624],{"key":20,"text":617,"correct":32},"组织编写监理日志，参与编写监理月报",{"key":24,"text":619,"correct":22},"组织验收分部工程，组织审查单位工程质量检验资料",{"key":27,"text":621,"correct":22},"组织审查和处理工程变更",{"key":30,"text":623,"correct":22},"组织审核施工单位的付款申请，签发工程款支付证书，组织审核竣工结算",{"key":34,"text":625,"correct":22},"组织检查施工单位现场质量、安全生产管理体系的建立及运行情况",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":155,"analysis":37},1105094,"根据《建设工程监理规范》，专业监理工程师应履行的职责有（ ）。",[630,632,634,636,638],{"key":20,"text":631,"correct":32},"审批监理实施细则",{"key":24,"text":633,"correct":32},"组织审核分包单位资质",{"key":27,"text":635,"correct":22},"检查进场的工程材料、构配件、设备的质量",{"key":30,"text":637,"correct":22},"处置发现的质量问题和安全事故隐患",{"key":34,"text":639,"correct":22},"参与工程变更的审查和处理",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":653,"analysis":37},1105095,"根据《建设工程监理规范》，属于监理员职责的有()。",[644,646,648,650,651],{"key":20,"text":645,"correct":22},"检查工序施工结果",{"key":24,"text":647,"correct":32},"参与验收分部工程",{"key":27,"text":649,"correct":22},"进行见证取样",{"key":30,"text":404,"correct":32},{"key":34,"text":652,"correct":32},"参与整理监理文件资料","AC",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":140,"analysis":37},1105096,"下列选项中，项目监理机构可设置总监理工程师代表的情形有()。",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"工程规模较大，专业较复杂，总监理工程师难以处理多个专业工程",{"key":24,"text":661,"correct":22},"一个建设工程监理合同中包含多个相对独立的施工合同",{"key":27,"text":663,"correct":32},"工程规模比较大，工期比较长",{"key":30,"text":665,"correct":22},"工程规模较大，地域比较分散",{"key":34,"text":667,"correct":32},"工程规模比较小，技术要求比较高",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":682,"analysis":37},1105097,"项目监理机构组织结构设计中，管理层次中的中间控制层包括()。",[672,674,676,678,680],{"key":20,"text":673,"correct":32},"决策层",{"key":24,"text":675,"correct":22},"协调层",{"key":27,"text":677,"correct":32},"操作层",{"key":30,"text":679,"correct":22},"执行层",{"key":34,"text":681,"correct":32},"指导层","BD",[684,688,691,694,697,700],{"id":685,"name":686,"category":7,"favorite":687},1,"领导干部任职前廉政法规知识测试题",92,{"id":689,"name":690,"category":7,"favorite":685},595,"建筑结构与设备",{"id":692,"name":693,"category":7,"favorite":685},715,"招标采购专业知识与法律法规",{"id":695,"name":696,"category":7,"favorite":685},848,"市政方向-通用基础",{"id":698,"name":699,"category":7,"favorite":8},534,"BIM工程师",{"id":701,"name":699,"category":7,"favorite":8},535]