[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-38":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":713},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,38,50,2341,[13,38,53,68,83,98,112,126,141,155,170,184,198,208,222,237,251,265,280,294,309,321,335,349,364,379,394,408,422,435,450,465,474,488,503,515,527,542,553,567,581,595,608,622,636,648,662,676,691,700],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1104954,2,"多选题","(2016年真题）下列工作内容中，属于建设工程目标动态控制过程的有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","组织",false,{"key":24,"text":25,"correct":26},"B","计划",true,{"key":28,"text":29,"correct":26},"C","执行",{"key":31,"text":32,"correct":26},"D","检查",{"key":34,"text":35,"correct":22},"E","协调","BCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1104955,"(2017年真题）建筑信息建模（BIM）技术的基本特点有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"协调性",{"key":24,"text":45,"correct":26},"模拟性",{"key":28,"text":47,"correct":22},"经济性",{"key":31,"text":49,"correct":26},"优化性",{"key":34,"text":51,"correct":26},"可出图性","ABDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1104956,"(2018年真题）建设工程信息管理系统可以为项目监理机构提供的支持是（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"标准化、结构化的数据",{"key":24,"text":60,"correct":26},"预测、决策所需的信息及分析模型",{"key":28,"text":62,"correct":26},"工程目标动态控制的分析报告",{"key":31,"text":64,"correct":22},"工程变更的优化设计方案",{"key":34,"text":66,"correct":26},"解决工程监理问题的备选方案","ABCE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1104957,"(2018年真题）下列目标控制措施中，属于经济措施的有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"建立动态控制过程中的激励机制",{"key":24,"text":75,"correct":26},"审核工程量及工程结算报告",{"key":28,"text":77,"correct":26},"对工程变更方案进行技术经济分析",{"key":31,"text":79,"correct":22},"选择合理的承发包模式和合同计价方式",{"key":34,"text":81,"correct":26},"进行投资偏差分析和未完工程投资预测","BCE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1104958,"(2018年真题）项目监理机构编制的见证取样实施细则应包括的内容有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"见证取样方法",{"key":24,"text":90,"correct":26},"见证取样范围",{"key":28,"text":92,"correct":26},"见证人员职责",{"key":31,"text":94,"correct":26},"见证工作程序",{"key":34,"text":96,"correct":22},"见证试验方法","ABCD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":97,"analysis":37},1104959,"(2018年真题）项目监理机构对监理单位内部检测设备需求进行协调平衡时应注意的内容有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"规格的明确性",{"key":24,"text":105,"correct":26},"数量的准确性",{"key":28,"text":107,"correct":26},"质量的规定性",{"key":31,"text":109,"correct":26},"期限的及时性",{"key":34,"text":111,"correct":22},"使用的规范性",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":36,"analysis":37},1104960,"(2019年真题）下列目标控制措施中，属于技术措施的有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"确定目标控制工作流程",{"key":24,"text":119,"correct":26},"审查施工组织设计",{"key":28,"text":121,"correct":26},"采用网络计划技术进行工期优化",{"key":31,"text":123,"correct":26},"审核比较各种工程数据",{"key":34,"text":125,"correct":22},"确定合理的工程款计价方式",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1104975,"下列制度中，属于项目监理机构内部工作制度的有（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"施工备忘录签发制度",{"key":24,"text":133,"correct":22},"施工组织设计审核制度",{"key":28,"text":135,"correct":22},"工程变更处理制度",{"key":31,"text":137,"correct":26},"监理工作日志制度",{"key":34,"text":139,"correct":26},"监理业绩考核制度","DE",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":36,"analysis":37},1104976,"监理规划中应明确的安全生产管理措施有()。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"组织验收施工起重机械的安全性能",{"key":24,"text":148,"correct":26},"督促施工单位落实安全技术措施",{"key":28,"text":150,"correct":26},"审查施工单位的安全生产规章制度",{"key":31,"text":152,"correct":26},"督促施工单位落实应急救援预案",{"key":34,"text":154,"correct":22},"制定危险性较大的分部工程旁站方案",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},1104977,"审核监理规划时，对监理组织机构审核的内容包括()。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"是否理解了业主的工程建设意图",{"key":24,"text":162,"correct":22},"是否包括了全部委托的工作任务",{"key":28,"text":164,"correct":26},"是否与工程实施特点相结合",{"key":31,"text":166,"correct":26},"是否与建设单位的组织关系相协调",{"key":34,"text":168,"correct":26},"是否与施工单位的组织关系相协调","CDE",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":36,"analysis":37},1104981,"根据《建设工程监理规范》，属于监理规划主要内容的有()。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"安全生产管理制度",{"key":24,"text":177,"correct":26},"监理工作制度",{"key":28,"text":179,"correct":26},"监理工作设施",{"key":31,"text":181,"correct":26},"工程造价控制",{"key":34,"text":183,"correct":22},"工程进度计划",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":140,"analysis":37},1104986,"下列工程造价控制内容中，属于工程造价动态比较内容的有()。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"工程造价控制计划的编制",{"key":24,"text":191,"correct":22},"工程造价控制计划的审核",{"key":28,"text":193,"correct":22},"工程造价偏差的纠正",{"key":31,"text":195,"correct":26},"工程造价目标值的预测分析",{"key":34,"text":197,"correct":26},"工程造价目标分解值与实际值的比较",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":97,"analysis":37},1104987,"根据《建设工程监理规范》，属于监理规划主要内容的有（ ）。",[202,204,205,206,207],{"key":20,"text":203,"correct":26},"监理工作的范围、内容、目标",{"key":24,"text":177,"correct":26},{"key":28,"text":179,"correct":26},{"key":31,"text":181,"correct":26},{"key":34,"text":183,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":97,"analysis":37},1104988,"下列工程造价控制工作中，属于项目监理机构在施工阶段控制工程造价的工作内容是（ ）。",[212,214,216,218,220],{"key":20,"text":213,"correct":26},"复核、审查施工图预算",{"key":24,"text":215,"correct":26},"定期进行工程计量",{"key":28,"text":217,"correct":26},"实际完成量与计划完成量进行比较分析",{"key":31,"text":219,"correct":26},"审核竣工结算款",{"key":34,"text":221,"correct":22},"审查施工组织设计及专项施工方案",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":236,"analysis":37},1104989,"下列监理工作中，属于安全生产管理工作的是（ ）。",[226,228,230,232,234],{"key":20,"text":227,"correct":26},"审查施工单位安全生产许可证",{"key":24,"text":229,"correct":22},"对关键部位、关键工序的施工过程实施旁站",{"key":28,"text":231,"correct":26},"巡视危险性较大的分部分项工程专项施工方案实施情况",{"key":31,"text":233,"correct":26},"审查施工单位现场安全生产规章制度的建立和实施情况",{"key":34,"text":235,"correct":26},"审查包括施工起重机械和整体提升脚手架、模板等自升式架设设施等在内的施工机械和设施的安全许可验收手续情况","ACDE",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":52,"analysis":37},1104990,"建设工程监理合同的相关条款和内容是编写监理规划的重要依据，主要包括（ ）。",[241,243,245,247,249],{"key":20,"text":242,"correct":26},"监理工作范围和内容",{"key":24,"text":244,"correct":26},"建设单位的义务和责任",{"key":28,"text":246,"correct":22},"政府批准的工程建设文件",{"key":31,"text":248,"correct":26},"监理与相关服务依据",{"key":34,"text":250,"correct":26},"工程监理单位的义务和责任",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":52,"analysis":37},1104991,"关于监理规划编写要求的说法，正确的是（ ）。",[255,257,259,261,263],{"key":20,"text":256,"correct":26},"监理规划的基本构成内容应当力求统一",{"key":24,"text":258,"correct":26},"监理规划的内容应具有针对性、指导性和可操作性",{"key":28,"text":260,"correct":22},"监理规划编制好即可实施",{"key":31,"text":262,"correct":26},"监理规划应由总监理工程师组织编制",{"key":34,"text":264,"correct":26},"监理规划的编制应充分考虑时效性",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":279,"analysis":37},1104992,"根据《建设工程监理规范》GB\u002FT 50319-2013，关于工程进度控制的具体措施包括的是（ ）。",[269,271,273,275,277],{"key":20,"text":270,"correct":26},"确保资金的及时供应",{"key":24,"text":272,"correct":22},"严格质量检查和验收，不符合合同规定质量要求的，拒付工程款",{"key":28,"text":274,"correct":22},"对原设计或施工方案提出合理化建议并被采用，由此产生的投资节约按合同规定予以奖励",{"key":31,"text":276,"correct":26},"建立多级网络计划体系，监控施工单位的实施作业计划",{"key":34,"text":278,"correct":22},"协助完善质量保证体系","AD",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":169,"analysis":37},1104998,"下列工作流程中，监理工作涉及的有()。",[284,286,288,290,292],{"key":20,"text":285,"correct":22},"分包单位招标选择流程",{"key":24,"text":287,"correct":22},"质量三检制度落实流程",{"key":28,"text":289,"correct":26},"隐藏工程验收流程",{"key":31,"text":291,"correct":26},"质量问题处理审核流程",{"key":34,"text":293,"correct":26},"开工审核工作流程",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":308,"analysis":37},1105002,"根据《建设工程监理规范》，监理实施细则应包含的内容有()。",[298,300,302,304,306],{"key":20,"text":299,"correct":22},"监理组织形式",{"key":24,"text":301,"correct":26},"监理工程流程",{"key":28,"text":303,"correct":26},"监理工作方法",{"key":31,"text":305,"correct":26},"监理工作要点",{"key":34,"text":307,"correct":26},"专业工程特点","BCDE",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":36,"analysis":37},1105003,"审核监理细则时，对监理组织方面审核的内容包括()。",[313,315,316,318,319],{"key":20,"text":314,"correct":22},"是否符合专业工程相关的标准",{"key":24,"text":168,"correct":26},{"key":28,"text":317,"correct":26},"是否与专业工程的具体特点相结合",{"key":31,"text":166,"correct":26},{"key":34,"text":320,"correct":22},"是否与施工组织设计使用的规范、标准、技术要求相一致",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":52,"analysis":37},1105007,"根据《建设工程监理规范》，属于监理实施细则编写依据的是（ ）。",[325,327,329,331,333],{"key":20,"text":326,"correct":26},"已批准的监理规划",{"key":24,"text":328,"correct":26},"施工组织设计，专项施工方案",{"key":28,"text":330,"correct":22},"工程外部环境调查资料",{"key":31,"text":332,"correct":26},"与专业工程相关的设计文件和技术资料",{"key":34,"text":334,"correct":26},"工程监理单位的规章制度和经认证发布的质量体系",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":236,"analysis":37},1105008,"根据《建设工程监理规范》GB\u002FT 50319－2013，关于监理实施细则编制的说法，正确的是（ ）。",[339,341,343,345,347],{"key":20,"text":340,"correct":26},"应由专业监理工程师组织编制",{"key":24,"text":342,"correct":22},"应针对所有分部分项工程编制",{"key":28,"text":344,"correct":26},"应在相应工程施工前完成编制",{"key":31,"text":346,"correct":26},"应当经总监理工程师审批后实施",{"key":34,"text":348,"correct":26},"可随工程进展编制，但应在相应工程开始前编制完成",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":363,"analysis":37},1105009,"下列选项中，不属于确定建设工程项目监理机构的组织形式和规模的因素有()。",[353,355,357,359,361],{"key":20,"text":354,"correct":22},"服务内容",{"key":24,"text":356,"correct":26},"服务费用",{"key":28,"text":358,"correct":22},"工程规模",{"key":31,"text":360,"correct":26},"建设单位的性质",{"key":34,"text":362,"correct":22},"技术复杂程度","BD",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":378,"analysis":37},1105010,"监理实施细则应满足以下( )要求。",[368,370,372,374,376],{"key":20,"text":369,"correct":26},"内容全面",{"key":24,"text":371,"correct":22},"专业性强",{"key":28,"text":373,"correct":22},"指导性强",{"key":31,"text":375,"correct":26},"针对性强",{"key":34,"text":377,"correct":26},"可操作性","ADE",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":393,"analysis":37},1105011,"《建设工程监理规范》规定，监理实施细则编写依据包括()。",[383,385,387,389,391],{"key":20,"text":384,"correct":26},"已批准的建设工程监理规划",{"key":24,"text":386,"correct":22},"监理合同",{"key":28,"text":388,"correct":26},"与专业工程相关的标准、设计文件和技术资料",{"key":31,"text":390,"correct":22},"建设工程设计文件",{"key":34,"text":392,"correct":26},"施工组织设计、(专项)施工方案","ACE",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":140,"analysis":37},1105012,"下列选项中，可以不必编制监理实施细则的情形有()。",[398,400,402,404,406],{"key":20,"text":399,"correct":22},"采用新材料、新工艺、新技术、新设备的工程",{"key":24,"text":401,"correct":22},"专业性较强的分部分项工程",{"key":28,"text":403,"correct":22},"危险性较大的分部分项工程",{"key":31,"text":405,"correct":26},"工程规模较小、技术较为简单",{"key":34,"text":407,"correct":26},"有成熟监理经验和施工技术措施落实的情况下",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":67,"analysis":37},1105013,"监理实施细则中，专业工程特点应从专业工程施工的()进行有针对性的阐述。",[412,414,416,418,420],{"key":20,"text":413,"correct":26},"重点和难点",{"key":24,"text":415,"correct":26},"施工工艺",{"key":28,"text":417,"correct":26},"施工工序",{"key":31,"text":419,"correct":22},"工程概况",{"key":34,"text":421,"correct":26},"施工范围和施工顺序",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":52,"analysis":37},1105014,"在监理实施细则中，属于监理工作涉及的流程内容有()。",[426,427,429,431,433],{"key":20,"text":293,"correct":26},{"key":24,"text":428,"correct":26},"施工质量控制流程",{"key":28,"text":430,"correct":22},"监理规划编制流程",{"key":31,"text":432,"correct":26},"工程质量问题处理审核流程",{"key":34,"text":434,"correct":26},"隐蔽工程验收流程",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":449,"analysis":37},1105015,"下列选项中，属于监理实施细则的审核内容有()。",[439,441,443,445,447],{"key":20,"text":440,"correct":26},"编制依据的审核",{"key":24,"text":442,"correct":22},"工程质量控制方法的审核",{"key":28,"text":444,"correct":26},"项目监理人员的审核",{"key":31,"text":446,"correct":26},"监理工作方法和措施的审核",{"key":34,"text":448,"correct":22},"安全生产管理监理工作内容的审核","ACD",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":464,"analysis":37},1105016,"监理规划中明确的工程进度控制技术措施有( )。",[454,456,458,460,462],{"key":20,"text":455,"correct":26},"建立多级网络计划体系",{"key":24,"text":457,"correct":22},"严格审核施工组织设计",{"key":28,"text":459,"correct":22},"建立进度控制协调制度",{"key":31,"text":461,"correct":22},"按施工合同条款及时支付工程款",{"key":34,"text":463,"correct":26},"监控施工单位的实施作业计划","AE",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":36,"analysis":37},1105017,"审核监理规划时，对项目监理机构的组织机构方面审核的内容包括( )。",[469,470,471,472,473],{"key":20,"text":314,"correct":22},{"key":24,"text":168,"correct":26},{"key":28,"text":164,"correct":26},{"key":31,"text":166,"correct":26},{"key":34,"text":320,"correct":22},{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":169,"analysis":37},1105018,"监理规划中质量控制的组织措施包括( )。",[478,480,482,484,486],{"key":20,"text":479,"correct":22},"严格质量检查与监督",{"key":24,"text":481,"correct":22},"拒付不合格工程的款项",{"key":28,"text":483,"correct":26},"落实质量控制责任",{"key":31,"text":485,"correct":26},"完善监理人员职责分工",{"key":34,"text":487,"correct":26},"制定质量监督管理制度",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":502,"analysis":37},1105019,"监理单位技术负责人在审核监理规划时，主要审核的有()。",[492,494,496,498,500],{"key":20,"text":493,"correct":26},"监理范围、监理工作内容是否已包括全部委托的工作任务",{"key":24,"text":495,"correct":26},"监理组织形式、管理模式等是否合理",{"key":28,"text":497,"correct":26},"监理的内、外工作制度是否健全",{"key":31,"text":499,"correct":22},"项目监理机构是否有保证监理目标实现的充分依据",{"key":34,"text":501,"correct":22},"监理工作计划是否符合国家强制性标准","ABC",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":82,"analysis":37},1105020,"下列选项中，属于项目监理机构内部工作制度的有()。",[507,509,510,512,513],{"key":20,"text":508,"correct":22},"安全生产监督检查制度",{"key":24,"text":137,"correct":26},{"key":28,"text":511,"correct":26},"监理周报、月报制度",{"key":31,"text":133,"correct":22},{"key":34,"text":514,"correct":26},"监理人员教育培训制度",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":464,"analysis":37},1105021,"下列选项中，属于监理规划中工程质量控制经济措施及合同措施的有()。",[519,521,523,524,526],{"key":20,"text":520,"correct":26},"达到建设单位特定质量目标要求的，按合同支付工程质量补偿金或奖金",{"key":24,"text":522,"correct":22},"建立健全项目监理机构",{"key":28,"text":278,"correct":22},{"key":31,"text":525,"correct":22},"严格事前、事中和事后的质量检查监督",{"key":34,"text":272,"correct":26},{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":541,"analysis":37},1105022,"下列选项中，属于监理规划中工程造价控制技术措施的有()。",[531,533,535,537,539],{"key":20,"text":532,"correct":22},"及时进行计划费用与实际费用的分析比较",{"key":24,"text":534,"correct":22},"减少施工单位的索赔，正确处理索赔事宜等",{"key":28,"text":536,"correct":26},"对材料、设备采购，通过质量价格比选，合理确定生产供应单位",{"key":31,"text":538,"correct":26},"通过审核施工组织设计和施工方案，使组织施工合理化",{"key":34,"text":540,"correct":22},"落实工程造价控制责任","CD",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":393,"analysis":37},1105023,"下列选项中，监理规划应明确的工程进度控制措施有()。",[546,547,548,549,551],{"key":20,"text":455,"correct":26},{"key":24,"text":457,"correct":22},{"key":28,"text":459,"correct":26},{"key":31,"text":550,"correct":22},"该施工合同及时支付合同款",{"key":34,"text":552,"correct":26},"监控施工单位实施作业计划",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":393,"analysis":37},1105024,"下列选项中，属于组织协调中交谈协调的有()。",[557,559,561,563,565],{"key":20,"text":558,"correct":26},"面谈",{"key":24,"text":560,"correct":22},"专题会议",{"key":28,"text":562,"correct":26},"电话",{"key":31,"text":564,"correct":22},"通知书",{"key":34,"text":566,"correct":26},"网络",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":36,"analysis":37},1105025,"监理工作目标是指工程监理单位预期达到的工作目标。通常以()目标的控制值来表示。",[571,573,575,577,579],{"key":20,"text":572,"correct":22},"合同",{"key":24,"text":574,"correct":26},"质量",{"key":28,"text":576,"correct":26},"造价",{"key":31,"text":578,"correct":26},"进度",{"key":34,"text":580,"correct":22},"安全",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":308,"analysis":37},1105026,"监理规划审核内容中，属于对安全生产管理监理工作内容的审核的有()。",[585,587,589,591,593],{"key":20,"text":586,"correct":22},"在工程进展中各个阶段的工作实施计划是否合理、可行",{"key":24,"text":588,"correct":26},"审核安全生产管理的监理工作内容是否明确",{"key":28,"text":590,"correct":26},"是否建立了对现场安全隐患的巡视检查制度",{"key":31,"text":592,"correct":26},"是否制定了相应的安全生产管理实施细则",{"key":34,"text":594,"correct":26},"是否建立了对施工组织设计、专项施工方案的审查制度",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":502,"analysis":37},1105027,"建设工程监理规划在编写完成后，属于其审核内容的有()。",[599,601,602,604,606],{"key":20,"text":600,"correct":26},"工作计划",{"key":24,"text":177,"correct":26},{"key":28,"text":603,"correct":26},"监理范围",{"key":31,"text":605,"correct":22},"监理单位的资质",{"key":34,"text":607,"correct":22},"编写人员资格",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":308,"analysis":37},1105028,"对项目监理机构审核时，人员配备方案应从()方面进行审查。",[612,614,616,618,620],{"key":20,"text":613,"correct":22},"派驻监理人员的实际水平",{"key":24,"text":615,"correct":26},"派驻监理人员的专业满足程度",{"key":28,"text":617,"correct":26},"人员数量的满足程度",{"key":31,"text":619,"correct":26},"派驻现场人员计划表",{"key":34,"text":621,"correct":26},"专业人员不足时采取的措施是否恰当",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":52,"analysis":37},1105029,"下列选项中，属于监理工程师常规工作方法的有()。",[626,628,630,632,634],{"key":20,"text":627,"correct":26},"旁站",{"key":24,"text":629,"correct":26},"巡视",{"key":28,"text":631,"correct":22},"指令文件",{"key":31,"text":633,"correct":26},"见证取样",{"key":34,"text":635,"correct":26},"平行检测",{"id":637,"libraryId":5,"type":15,"typeLabel":16,"stem":638,"options":639,"answer":169,"analysis":37},1105030,"根据《建设工程监理规范》GB／T 50319—2013，监理实施细则应包含的内容有()。",[640,642,643,645,647],{"key":20,"text":641,"correct":22},"监理实施依据",{"key":24,"text":299,"correct":22},{"key":28,"text":644,"correct":26},"监理工作流程",{"key":31,"text":646,"correct":26},"监理工作控制要点",{"key":34,"text":303,"correct":26},{"id":649,"libraryId":5,"type":15,"typeLabel":16,"stem":650,"options":651,"answer":52,"analysis":37},1105031,"下列选项中，属于监理规划编写要求的有()。",[652,654,656,658,660],{"key":20,"text":653,"correct":26},"基本构成内容应当力求统一",{"key":24,"text":655,"correct":26},"经审核批准后方可实施",{"key":28,"text":657,"correct":22},"应由总监理工程师或总监理工程师代表组织编制",{"key":31,"text":659,"correct":26},"编制应充分考虑时效性",{"key":34,"text":661,"correct":26},"应把握工程项目运行脉搏",{"id":663,"libraryId":5,"type":15,"typeLabel":16,"stem":664,"options":665,"answer":236,"analysis":37},1105032,"下列选项中，属于建设工程监理规划编写依据的有()。",[666,668,670,672,674],{"key":20,"text":667,"correct":26},"工程建设法律法规",{"key":24,"text":669,"correct":22},"监理实施细则",{"key":28,"text":671,"correct":26},"建设工程监理合同",{"key":31,"text":673,"correct":26},"政府发展改革部门批准的可行性研究报告",{"key":34,"text":675,"correct":26},"建设单位的合理要求",{"id":677,"libraryId":5,"type":15,"typeLabel":16,"stem":678,"options":679,"answer":690,"analysis":37},1105033,"下列选项中，对于建设工程监理规划编写要求，表述错误的有()。",[680,682,684,686,688],{"key":20,"text":681,"correct":22},"监理规划的表达方式应当格式化、标准化",{"key":24,"text":683,"correct":22},"监理规划基本构成内容应当力求统一，这是监理工作规范化、制度化、科学化的要求",{"key":28,"text":685,"correct":26},"监理规划的编制不必考虑建设单位的意见",{"key":31,"text":687,"correct":22},"监理规划可能随着工程进展进行不断的补充、修改和完善",{"key":34,"text":689,"correct":26},"监理规划应当在收到中标通知书后即由监理单位技术负责人组织编制","CE",{"id":692,"libraryId":5,"type":15,"typeLabel":16,"stem":693,"options":694,"answer":169,"analysis":37},1105034,"根据《建设工程监理规范》(GB\u002FT50319-2013)，监理实施细则包含的内容有( )。",[695,696,697,698,699],{"key":20,"text":641,"correct":22},{"key":24,"text":299,"correct":22},{"key":28,"text":644,"correct":26},{"key":31,"text":305,"correct":26},{"key":34,"text":303,"correct":26},{"id":701,"libraryId":5,"type":15,"typeLabel":16,"stem":702,"options":703,"answer":67,"analysis":37},1105035,"在监理实施细则的审核内容中，下列属于对编制依据和内容的审核有()。",[704,706,707,709,711],{"key":20,"text":705,"correct":26},"监理实施细则的编制是否符合监理规划的要求",{"key":24,"text":314,"correct":26},{"key":28,"text":708,"correct":26},"是否符合设计文件的内容",{"key":31,"text":710,"correct":22},"监理工作流程是否完整、翔实",{"key":34,"text":712,"correct":26},"是否与施工组织设计、(专项)施工方案使用的规范、标准、技术要求相一致",[714,718,721,724,727,730],{"id":715,"name":716,"category":7,"favorite":717},1,"领导干部任职前廉政法规知识测试题",92,{"id":719,"name":720,"category":7,"favorite":715},595,"建筑结构与设备",{"id":722,"name":723,"category":7,"favorite":715},715,"招标采购专业知识与法律法规",{"id":725,"name":726,"category":7,"favorite":715},848,"市政方向-通用基础",{"id":728,"name":729,"category":7,"favorite":8},534,"BIM工程师",{"id":731,"name":729,"category":7,"favorite":8},535]