[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-37":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":698},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,37,50,2341,[13,38,53,68,83,97,112,127,142,157,172,187,202,216,230,244,258,271,286,298,313,324,337,352,367,381,393,405,419,432,446,460,473,488,501,515,529,543,552,561,575,587,602,612,626,635,644,654,668,683],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1104904,2,"多选题","建筑信息建模（BIM）技术的基本特点有()。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","协调性",true,{"key":24,"text":25,"correct":22},"B","模拟性",{"key":27,"text":28,"correct":29},"C","经济性",false,{"key":31,"text":32,"correct":22},"D","优化性",{"key":34,"text":35,"correct":22},"E","可出图性","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1104905,"建设工程信息管理系统可以为项目监理机构提供的支持是()。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"标准化、结构化的数据",{"key":24,"text":45,"correct":22},"预测、决策所需的信息及分析模型",{"key":27,"text":47,"correct":22},"工程目标动态控制的分析报告",{"key":31,"text":49,"correct":29},"工程变更的优化设计方案",{"key":34,"text":51,"correct":22},"解决工程监理问题的备选方案","ABCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1104906,"工程监理信息系统应具有（ ）基本功能。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"信息管理",{"key":24,"text":60,"correct":22},"动态控制",{"key":27,"text":62,"correct":22},"决策支持",{"key":31,"text":64,"correct":22},"协同工作",{"key":34,"text":66,"correct":29},"人工智能","ABCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1104907,"在监理过程中，监理人员应按照监理规划及监理实施细则中规定的频次进行现场巡视，巡视检查内容以 ( ) 为主。",[72,74,76,78,80],{"key":20,"text":73,"correct":29},"现场施工进度",{"key":24,"text":75,"correct":22},"现场施工质量",{"key":27,"text":77,"correct":29},"建设项目造价目标实现",{"key":31,"text":79,"correct":22},"安全生产事故隐患",{"key":34,"text":81,"correct":29},"现场施工信息管理流程","BD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":82,"analysis":37},1104908,"平行检验的内容包括( )等内容。",[87,89,91,93,95],{"key":20,"text":88,"correct":29},"旁站",{"key":24,"text":90,"correct":22},"材料检验",{"key":27,"text":92,"correct":29},"见证取样",{"key":31,"text":94,"correct":22},"工程实体量测",{"key":34,"text":96,"correct":29},"破坏性试验",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1104909,"监理人员在巡视检查时，应主要关注施工质量、安全生产两个方面的情况，其中属于安全生产方面检查内容的有()。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"施工临时用电情况",{"key":24,"text":104,"correct":29},"起重机械和自升式架设设施运行情况",{"key":27,"text":106,"correct":22},"安全生产、文明施工制度、措施落实情况",{"key":31,"text":108,"correct":29},"施工机具、设备的工作状态",{"key":34,"text":110,"correct":22},"施工组织设计中的安全技术措施和专项施工方案落实情况","ACE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1104910,"下列选项中，有关见证取样的表述正确的有()。",[116,118,120,122,124],{"key":20,"text":117,"correct":29},"计量认证分为两级实施，一级为国家级，一级为省级，两者实施的效力有所区别",{"key":24,"text":119,"correct":22},"检验报告上应注明见证人的姓名",{"key":27,"text":121,"correct":29},"每个工程项目的见证人员不得少于3人",{"key":31,"text":123,"correct":22},"见证人员必须取得《见证员证书》，且通过建设单位授权",{"key":34,"text":125,"correct":22},"对第三方试验室进行检查时，需要检查计量认证书、CMA章和附件、备案证书","BDE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1104911,"分析论证建设工程总目标，应遵循的基本原则有( )。",[131,133,135,137,139],{"key":20,"text":132,"correct":29},"动态控制和主动控制相结合",{"key":24,"text":134,"correct":22},"定性分析与定量分析相结合",{"key":27,"text":136,"correct":29},"慎重选择被删减设计标准的具体工程内容",{"key":31,"text":138,"correct":29},"确保建设工程安全措施符合强制性标准",{"key":34,"text":140,"correct":22},"不同建设工程三大目标可具有不同的优先等级","BE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1104912,"下列选项中，关于工程监理单位职责的说法错误的有()。",[146,148,150,152,154],{"key":20,"text":147,"correct":29},"工程监理单位应审查专项施工方案中的安全措施是否符合工程建设强制性标准",{"key":24,"text":149,"correct":29},"项目监理机构发现存在安全事故隐患时，应签发监理通知单，要求施工单位整改",{"key":27,"text":151,"correct":22},"专职安全生产管理人员发现存在安全事故隐患，应向总监理工程师报告",{"key":31,"text":153,"correct":22},"项目监理机构应旁站检查危险性较大的分部分项工程专项施工方案实施情况",{"key":34,"text":155,"correct":29},"超过一定规模的危险性较大的分部分项工程的专项施工方案，应附具安全验算结果","CD",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},1104913,"下列选项中，项目监理机构控制建设工程施工质量的任务有()。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"检查施工单位现场质量管理体系",{"key":24,"text":164,"correct":29},"处理工程质量事故",{"key":27,"text":166,"correct":22},"控制施工工艺过程质量",{"key":31,"text":168,"correct":22},"处置工程质量问题和质量缺陷",{"key":34,"text":170,"correct":29},"组织单位工程质量验收","ACD",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":186,"analysis":37},1104914,"下列选项中，属于项目监理机构内部组织关系协调工作的有()。",[176,178,180,182,184],{"key":20,"text":177,"correct":22},"在目标分解的基础上设置组织机构",{"key":24,"text":179,"correct":29},"恰到好处地调解个人矛盾",{"key":27,"text":181,"correct":22},"明确每个部门的职责和权限",{"key":31,"text":183,"correct":22},"建立信息沟通制度",{"key":34,"text":185,"correct":22},"事先约定各个部门在工作中的相互关系","ACDE",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":201,"analysis":37},1104915,"下列选项中，属于建设工程信息管理系统的功能有()。",[191,193,195,197,199],{"key":20,"text":192,"correct":29},"实现监理信息的及时收集和可靠存储",{"key":24,"text":194,"correct":29},"实现监理信息收集的标准化、结构化",{"key":27,"text":196,"correct":22},"提供预测、决策所需要的信息及分析模型",{"key":31,"text":198,"correct":22},"提供建设工程目标动态控制的分析报告",{"key":34,"text":200,"correct":22},"提供解决建设工程监理问题的多个备选方案","CDE",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":36,"analysis":37},1104916,"下列选项中，属于建设工程实施过程中采用BIM技术有望实现目标的是()。",[206,208,210,212,214],{"key":20,"text":207,"correct":22},"实现建设工程可视化展示",{"key":24,"text":209,"correct":22},"提升建设工程项目管理质量",{"key":27,"text":211,"correct":29},"加强建设工程全生产管理",{"key":31,"text":213,"correct":22},"控制建设工程造价",{"key":34,"text":215,"correct":22},"缩短建设工程施工周期",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":67,"analysis":37},1104917,"下列选项中，项目监理机构在施工阶段造价控制的主要任务有()。",[220,222,224,226,228],{"key":20,"text":221,"correct":22},"预防并处理费用索赔",{"key":24,"text":223,"correct":22},"挖掘降低工程造价潜力",{"key":27,"text":225,"correct":22},"控制工程付款",{"key":31,"text":227,"correct":22},"控制工程变更费用",{"key":34,"text":229,"correct":29},"确定造价控制目标",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":186,"analysis":37},1104918,"下列选项中，属于三大目标控制的组织措施有()。",[234,236,238,240,242],{"key":20,"text":235,"correct":22},"建立健全实施动态控制的组织机构、规章制度",{"key":24,"text":237,"correct":29},"选择合理的承发包模式和合同计价方式",{"key":27,"text":239,"correct":22},"明确各级目标控制人员的任务和职责分工",{"key":31,"text":241,"correct":22},"改善建设工程目标控制的工作流程",{"key":34,"text":243,"correct":22},"建立建设工程目标控制工作考评机制",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":67,"analysis":37},1104919,"根据《建设工程监理规范》GB／T 50319—2013，总监理工程师应及时签发《工程暂停令》的有()。",[248,250,252,254,256],{"key":20,"text":249,"correct":22},"施工单位违反工程建设强制性标准的",{"key":24,"text":251,"correct":22},"建设单位要求暂停施工且工程需要暂停施工的",{"key":27,"text":253,"correct":22},"施工存在重大质量、安全事故隐患的",{"key":31,"text":255,"correct":22},"施工单位未按审查通过的工程设计文件施工的",{"key":34,"text":257,"correct":29},"施工单位未按审查通过的施工方案施工的",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":186,"analysis":37},1104920,"下列内容中，属于监理工程师在施工阶段为完成质量控制任务，应当做好的工作的有（）。",[262,264,266,268,269],{"key":20,"text":263,"correct":22},"检查工程材料、设备质量",{"key":24,"text":265,"correct":29},"做好工程计量工作",{"key":27,"text":267,"correct":22},"检查施工机械和机具质量",{"key":31,"text":166,"correct":22},{"key":34,"text":270,"correct":22},"验收隐蔽工程",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":285,"analysis":37},1104921,"总监理工程师应对项目监理机构内的每一个岗位都订立明确的工作目标和岗位责任，使（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"管理职能不重不漏",{"key":24,"text":278,"correct":22},"事事有人管",{"key":27,"text":280,"correct":22},"人人有专责",{"key":31,"text":282,"correct":29},"人员能力互补",{"key":34,"text":284,"correct":29},"人员性格互补","ABC",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":186,"analysis":37},1104922,"出现下列（ ）情况时，总监理工程师应签发《工程暂停令》。",[290,291,293,295,297],{"key":20,"text":251,"correct":22},{"key":24,"text":292,"correct":29},"施工单位要求暂停施工",{"key":27,"text":294,"correct":22},"施工存在重大质量、安全事故隐患或发生质量、安全事故的",{"key":31,"text":296,"correct":22},"施工单位未经批准擅自施工",{"key":34,"text":249,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":312,"analysis":37},1104923,"工程监理单位接受委托在建设工程决策阶段提供咨询服务时，需要收集的信息有（ ）。",[302,304,306,308,310],{"key":20,"text":303,"correct":22},"与建设工程相关的市场信息",{"key":24,"text":305,"correct":22},"与建设工程相关的资源信息",{"key":27,"text":307,"correct":29},"工程所在地工程材料市场价格及变化规律",{"key":31,"text":309,"correct":29},"工程所在地工程建设标准及招投标相关规定",{"key":34,"text":311,"correct":22},"与建设工程相关的自然环境信息","ABE",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":111,"analysis":37},1104924,"下列属于三大目标控制组织措施的有()。",[317,318,320,321,323],{"key":20,"text":235,"correct":22},{"key":24,"text":319,"correct":29},"采用工程网络计划技术实施动态控制",{"key":27,"text":239,"correct":22},{"key":31,"text":322,"correct":29},"编制和实施资金使用计划，对工程变更方案进行技术经济分析",{"key":34,"text":243,"correct":22},{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":111,"analysis":37},1104925,"下列组织协调工作中，属于项目监理机构内部组织关系协调内容的有()。",[328,330,332,334,336],{"key":20,"text":329,"correct":22},"及时消除工作中的矛盾或冲突",{"key":24,"text":331,"correct":29},"尊重建设单位，让建设单位一起投入工程建设全过程",{"key":27,"text":333,"correct":22},"明确规定每个部门的目标、职责和权限",{"key":31,"text":335,"correct":29},"合理配置建设工程监理资源",{"key":34,"text":185,"correct":22},{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":351,"analysis":37},1104926,"项目监理机构在实施监理过程中，发现工程存在安全事故隐患且情况严重时，应该做的工作有()。",[341,343,345,347,349],{"key":20,"text":342,"correct":29},"签发监理通知单",{"key":24,"text":344,"correct":22},"签发工程暂停令",{"key":27,"text":346,"correct":22},"及时报告建设单位",{"key":31,"text":348,"correct":29},"及时向有关主管部门报送监理报告",{"key":34,"text":350,"correct":29},"要求施工单位整改","BC",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":366,"analysis":37},1104927,"下列关于建设工程三大目标控制技术措施的表述中，正确的有()。",[356,358,360,362,364],{"key":20,"text":357,"correct":22},"对多个可能的建设方案、施工方案等进行技术可行性分析",{"key":24,"text":359,"correct":22},"对施工组织设计、施工方案等进行审查、论证",{"key":27,"text":361,"correct":29},"技术措施必须与经济措施结合使用才能取得好的效果",{"key":31,"text":363,"correct":22},"采用工程网络计划技术、信息化技术等实施动态控制",{"key":34,"text":365,"correct":29},"对由于业主原因所导致的目标偏差，技术措施可能成为首选措施","ABD",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":285,"analysis":37},1104928,"见证取样是建设工程监理的主要方式之一，涉及()行为。",[371,373,375,377,379],{"key":20,"text":372,"correct":22},"试验方",{"key":24,"text":374,"correct":22},"施工方",{"key":27,"text":376,"correct":22},"见证方",{"key":31,"text":378,"correct":29},"设计方",{"key":34,"text":380,"correct":29},"业主方",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":67,"analysis":37},1104929,"建设工程监理的主要方式有( )",[385,387,388,389,391],{"key":20,"text":386,"correct":22},"巡视",{"key":24,"text":88,"correct":22},{"key":27,"text":92,"correct":22},{"key":31,"text":390,"correct":22},"平行检验",{"key":34,"text":392,"correct":29},"指令",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":404,"analysis":37},1104930,"建设工程三大目标控制的组织措施包括（ ）。",[397,399,401,402,403],{"key":20,"text":398,"correct":29},"选定满意的施工单位及材料设备供应单位",{"key":24,"text":400,"correct":22},"建立健全实施动态控制的组织机构",{"key":27,"text":243,"correct":22},{"key":31,"text":241,"correct":22},{"key":34,"text":239,"correct":22},"BCDE",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":126,"analysis":37},1104931,"下列施工阶段的目标控制工作中，属于监理工程师质量目标控制工作的有（ ）。",[409,411,413,415,417],{"key":20,"text":410,"correct":29},"审查施工管理制度",{"key":24,"text":412,"correct":22},"审查施工组织设计",{"key":27,"text":414,"correct":29},"计量已完合格工程量",{"key":31,"text":416,"correct":22},"组织工程预验收",{"key":34,"text":418,"correct":22},"审核竣工图",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":431,"analysis":37},1104932,"下列选项中，分析论证建设工程总目标，应遵循的基本原则有()。",[423,425,427,428,430],{"key":20,"text":424,"correct":29},"确保建设工程进度目标符合工程建设强制性标准",{"key":24,"text":426,"correct":29},"定性分析与定量分析相互独立",{"key":27,"text":134,"correct":22},{"key":31,"text":429,"correct":29},"不同建设工程三大目标具有相同的优先等级",{"key":34,"text":140,"correct":22},"CE",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":285,"analysis":37},1104933,"关于见证取样的说法，正确的有（ ）。",[436,438,440,442,444],{"key":20,"text":437,"correct":22},"国家级和省级计量认证机构认证的实施效力相同",{"key":24,"text":439,"correct":22},"见证人员必须取得《见证员证书》且有建设单位授权",{"key":27,"text":441,"correct":22},"检测单位接受委托检验任务时，须有送检单位填写的委托单",{"key":31,"text":443,"correct":29},"见证人员应协助取样人员按随机取样方法和试件制作方法取样",{"key":34,"text":445,"correct":29},"见证取样涉及的行为主体有材料供货方.施工方和见证方",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":366,"analysis":37},1104934,"监理人员在巡视检查时，应主要关注施工质量、安全生产两个方面的情况，下列内容中属于施工质量方面巡视检查内容的有（ ）。",[450,452,454,456,458],{"key":20,"text":451,"correct":22},"施工机具.设备的工作状态，周边环境是否有异常情况",{"key":24,"text":453,"correct":22},"天气情况是否适合施工作业，如不适合，是否已采取相应措施",{"key":27,"text":455,"correct":29},"危险性较大分部分项工程施工情况，重点关注是否按方案施工",{"key":31,"text":457,"correct":22},"使用的工程材料.设备和构配件是否已检测合格",{"key":34,"text":459,"correct":29},"大型起重机械和自升式架设设施运行情况",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":472,"analysis":37},1104935,"（2020年真题）项目监理机构在建设工程施工阶段质量控制的任务有（ ）。",[464,466,467,469,471],{"key":20,"text":465,"correct":29},"做好施工现场准备工作",{"key":24,"text":267,"correct":22},{"key":27,"text":468,"correct":22},"处置工程质量缺陷",{"key":31,"text":470,"correct":22},"控制施工过程质量",{"key":34,"text":164,"correct":29},"BCD",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":487,"analysis":37},1104936,"（2020年真题）为了进行科学的信息加工和整理，工程监理人员需要结合工程监理与相关服务工作绘制的流程图有（ ）。",[477,479,481,483,485],{"key":20,"text":478,"correct":22},"业务流程图",{"key":24,"text":480,"correct":29},"组织流程图",{"key":27,"text":482,"correct":29},"资源流程图",{"key":31,"text":484,"correct":29},"工艺流程图",{"key":34,"text":486,"correct":22},"数据流程图","AE",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":141,"analysis":37},1104937,"（2020年真题）根据《建设工程监理规范》，总监理工程师应及时签发工程暂停令的情形有（ ）。",[492,494,495,497,499],{"key":20,"text":493,"correct":29},"施工单位未按施工组织设计施工的",{"key":24,"text":249,"correct":22},{"key":27,"text":496,"correct":29},"施工单位要求暂停施工的",{"key":31,"text":498,"correct":29},"施工单位对进场材料未及时报验的",{"key":34,"text":500,"correct":22},"工程施工存在重大质量事故隐患的",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":351,"analysis":37},1104938,"（2020年真题）根据《建设工程监理规范》，项目监理机构在施工现场的巡视工作内容包括（ ）。",[505,507,509,511,513],{"key":20,"text":506,"correct":29},"施工现场的作业情况",{"key":24,"text":508,"correct":22},"特种作业人员是否持证上岗",{"key":27,"text":510,"correct":22},"质量和安全管理人员是否在岗",{"key":31,"text":512,"correct":29},"关键工序平行检验情况",{"key":34,"text":514,"correct":29},"已完专业工程验收情况",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":487,"analysis":37},1104939,"(2009年真题）项目监理机构内部需求关系的协调主要包括对（ ）的平衡。",[519,521,523,525,527],{"key":20,"text":520,"correct":22},"监理设备",{"key":24,"text":522,"correct":29},"监理资金",{"key":27,"text":524,"correct":29},"监理资料",{"key":31,"text":526,"correct":29},"监理时间",{"key":34,"text":528,"correct":22},"监理人员",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":404,"analysis":37},1104940,"(2015年真题）关于项目监理机构巡视的说法，正确的有（ ）。",[533,535,537,539,541],{"key":20,"text":534,"correct":29},"总监理工程师应根据施工组织设计对监理人员进行巡视交底",{"key":24,"text":536,"correct":22},"总监理工程师进行巡视交底时应明确巡视检查要点、巡视频率",{"key":27,"text":538,"correct":22},"总监理工程师进行巡视交底时应对采用巡视检查记录表提出明确要求",{"key":31,"text":540,"correct":22},"总监理工程师应检查监理人员的巡视工作成果",{"key":34,"text":542,"correct":22},"监理人员的巡视检查应主要关注施工质量和安全生产",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":36,"analysis":37},1104941,"(2015年真题）建设工程实施过程中采用BIM技术的目标有（ ）。",[547,548,549,550,551],{"key":20,"text":207,"correct":22},{"key":24,"text":209,"correct":22},{"key":27,"text":211,"correct":29},{"key":31,"text":213,"correct":22},{"key":34,"text":215,"correct":22},{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":201,"analysis":37},1104942,"(2015年真题）建设工程信息管理系统的功能有（ ）。",[556,557,558,559,560],{"key":20,"text":192,"correct":29},{"key":24,"text":194,"correct":29},{"key":27,"text":196,"correct":22},{"key":31,"text":198,"correct":22},{"key":34,"text":200,"correct":22},{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":472,"analysis":37},1104943,"(2011年真题）建设工程目标控制的组织措施包括（ ）。",[565,567,569,571,573],{"key":20,"text":566,"correct":29},"确定建设工程发包组织管理模式",{"key":24,"text":568,"correct":22},"明确目标控制人员的任务和职能分工",{"key":27,"text":570,"correct":22},"建立健全目标控制机构与相关人员",{"key":31,"text":572,"correct":22},"改善目标控制工作流程",{"key":34,"text":574,"correct":29},"对技术方案组织技术经济分析论证",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":52,"analysis":37},1104944,"(2010年真题）下列监理任务中，属于施工阶段质量控制任务的有（ ）。",[579,581,582,584,586],{"key":20,"text":580,"correct":22},"审查确认总承包单位资质",{"key":24,"text":412,"correct":22},{"key":27,"text":583,"correct":22},"审查确认分包单位资质",{"key":31,"text":585,"correct":29},"做好工程变更方案的比选",{"key":34,"text":418,"correct":22},{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":601,"analysis":37},1104945,"(2011年真题）下列建设工程监理组织协调方法中，不具有合同效力的有（ ）。",[591,593,595,597,599],{"key":20,"text":592,"correct":22},"会议协调法",{"key":24,"text":594,"correct":22},"交谈协调法",{"key":27,"text":596,"correct":29},"书面协调法",{"key":31,"text":598,"correct":29},"访问协调法",{"key":34,"text":600,"correct":29},"情况介绍法","AB",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":52,"analysis":37},1104946,"(2012年真题）项目监理机构内部组织关系的协调包括（ ）。",[606,607,608,609,611],{"key":20,"text":177,"correct":22},{"key":24,"text":333,"correct":22},{"key":27,"text":185,"correct":22},{"key":31,"text":610,"correct":29},"实事求是地进行成绩评价",{"key":34,"text":183,"correct":22},{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":36,"analysis":37},1104947,"(2013年真题）在施工阶段,项目监理机构与施工单位的协调工作内容包括（ ）。",[616,618,620,622,624],{"key":20,"text":617,"correct":22},"对施工单位违约行为的处理",{"key":24,"text":619,"correct":22},"合同争议的协调",{"key":27,"text":621,"correct":29},"督促施工单位及时报告安全事故",{"key":31,"text":623,"correct":22},"对分包单位的管理",{"key":34,"text":625,"correct":22},"与施工项目经理关系的协调",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":67,"analysis":37},1104948,"(2014年真题）根据《建设工程监理规范》(GBT 50319-2013)，总监理工程师应及时签发《工程暂停令》的有（ ）",[630,631,632,633,634],{"key":20,"text":249,"correct":22},{"key":24,"text":251,"correct":22},{"key":27,"text":253,"correct":22},{"key":31,"text":255,"correct":22},{"key":34,"text":257,"correct":29},{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":171,"analysis":37},1104949,"(2014年真题）项目监理机构控制建设工程施工质量的任务有（ ）。",[639,640,641,642,643],{"key":20,"text":162,"correct":22},{"key":24,"text":164,"correct":29},{"key":27,"text":166,"correct":22},{"key":31,"text":168,"correct":22},{"key":34,"text":170,"correct":29},{"id":645,"libraryId":5,"type":15,"typeLabel":16,"stem":646,"options":647,"answer":67,"analysis":37},1104950,"(2015年真题）项目监理机构在施工阶段造价控制的主要任务有（ ）。",[648,649,651,652,653],{"key":20,"text":221,"correct":22},{"key":24,"text":650,"correct":22},"挖掘降低造价潜力",{"key":27,"text":225,"correct":22},{"key":31,"text":227,"correct":22},{"key":34,"text":229,"correct":29},{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":111,"analysis":37},1104951,"(2016年真题）项目监理机构实施组织协调的常用方法有（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"会议协调",{"key":24,"text":661,"correct":29},"行政协调",{"key":27,"text":663,"correct":22},"交谈协调",{"key":31,"text":665,"correct":29},"指令协调",{"key":34,"text":667,"correct":22},"书面协调",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":682,"analysis":37},1104952,"(2017年真题）项目监理机构在施工阶段进度控制的任务有（ ）。",[672,674,676,678,680],{"key":20,"text":673,"correct":22},"完善建设工程控制性进度计划",{"key":24,"text":675,"correct":29},"审查施工单位专项施工方案",{"key":27,"text":677,"correct":29},"审查施工单位工程变更申请",{"key":31,"text":679,"correct":22},"制定预防工期索赔措施",{"key":34,"text":681,"correct":22},"组织召开进度协调会","ADE",{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":697,"analysis":37},1104953,"(2017年真题）见证取样的检验报告应满足的基本要求有（ ）。",[687,689,691,693,695],{"key":20,"text":688,"correct":29},"试验报告应手工书写",{"key":24,"text":690,"correct":22},"试验报告采用统一用表",{"key":27,"text":692,"correct":22},"试验报告签名一定要手签",{"key":31,"text":694,"correct":29},"注明取样人的姓名",{"key":34,"text":696,"correct":22},"应有“见证检验专用章”","BCE",[699,703,706,709,712,715],{"id":700,"name":701,"category":7,"favorite":702},1,"领导干部任职前廉政法规知识测试题",92,{"id":704,"name":705,"category":7,"favorite":700},595,"建筑结构与设备",{"id":707,"name":708,"category":7,"favorite":700},715,"招标采购专业知识与法律法规",{"id":710,"name":711,"category":7,"favorite":700},848,"市政方向-通用基础",{"id":713,"name":714,"category":7,"favorite":8},534,"BIM工程师",{"id":716,"name":714,"category":7,"favorite":8},535]