[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-36":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":678},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,36,50,2341,[13,38,53,68,81,96,111,125,140,155,169,180,194,204,215,229,240,254,264,279,292,305,314,329,339,348,363,374,388,403,417,432,441,450,465,474,483,497,512,527,541,555,566,580,593,607,621,635,649,664],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1104828,2,"多选题","下列文件资料中，属于建设工程监理文件资料的有()。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","设备采购合同",false,{"key":24,"text":25,"correct":26},"B","工程监理合同",true,{"key":28,"text":29,"correct":22},"C","施工承包合同",{"key":31,"text":32,"correct":22},"D","材料采购合同",{"key":34,"text":35,"correct":26},"E","材料报验文件","BE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1104829,"下列工程中，其监理文件资料不需移交城建档案管理部门，暂由建设单位保管的有( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"改建工程",{"key":24,"text":45,"correct":26},"停建工程",{"key":28,"text":47,"correct":22},"扩建工程",{"key":31,"text":49,"correct":26},"缓建工程",{"key":34,"text":51,"correct":22},"维修工程","BD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1104830,"下列监理文件资料中，需要建设单位审批同意的有()。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"工程开工报审表",{"key":24,"text":60,"correct":22},"工程暂停令",{"key":28,"text":62,"correct":26},"费用索赔报审表",{"key":31,"text":64,"correct":22},"单位工程竣工验收报审表",{"key":34,"text":66,"correct":26},"工程临时或最终延期报审表","ACE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":80,"analysis":37},1104831,"根据《建设工程监理规范》GB／T 50319—2013，需要由建设单位代表签字并加盖建设单位公章的报审表有()。",[72,74,76,77,79],{"key":20,"text":73,"correct":22},"分包单位资格报审表",{"key":24,"text":75,"correct":26},"工程复工报审表",{"key":28,"text":62,"correct":26},{"key":31,"text":78,"correct":26},"工程最终延期报审表",{"key":34,"text":64,"correct":22},"BCD",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":95,"analysis":37},1104832,"监理例会会议纪要由项目监理机构根据会议记录整理，下列选项中，属于其主要内容的有()。",[85,87,89,91,93],{"key":20,"text":86,"correct":26},"会议地点及时间",{"key":24,"text":88,"correct":26},"与会人员姓名、单位、职务",{"key":28,"text":90,"correct":26},"会议主要内容、决议事项",{"key":31,"text":92,"correct":26},"负责落实单位、负责人和时限要求",{"key":34,"text":94,"correct":22},"与会各方代表会签","ABCD",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":110,"analysis":37},1104833,"关于建设工程档案资料管理职责的说法，正确的有（ ）。",[100,102,104,106,108],{"key":20,"text":101,"correct":26},"工程档案资料应随工程进度及时收集、整理",{"key":24,"text":103,"correct":26},"宜采用信息技术进行监理文件资料管理",{"key":28,"text":105,"correct":26},"应建立和完善监理文件资料管理制度，宜设专人管理监理文件资料.",{"key":31,"text":107,"correct":22},"分包单位应对本单位形成的工程档案资料负责，立卷后及时移交建设单位",{"key":34,"text":109,"correct":22},"工程档案资料应分级管理，各单位档案管理员负责工程档案资料全过程的组织与审核工作","ABC",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":95,"analysis":37},1104834,"监理文件档案经（ ）程序后，必须使用科学的分类方法进行存放，这样既可满足项目实施过程查阅、求证的需要，又方便项目竣工后文件和档案的归档和移交。",[115,117,119,121,123],{"key":20,"text":116,"correct":26},"收文",{"key":24,"text":118,"correct":26},"发文",{"key":28,"text":120,"correct":26},"登记",{"key":31,"text":122,"correct":26},"传阅工作",{"key":34,"text":124,"correct":22},"作废",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":139,"analysis":37},1104835,"建设工程监理文件资料原则上可按（ ）进行分类，以保证建设工程监理文件资料检索和归档工作的顺利进行。",[129,131,133,135,137],{"key":20,"text":130,"correct":26},"施工单位",{"key":24,"text":132,"correct":26},"专业施工部位",{"key":28,"text":134,"correct":22},"阶段",{"key":31,"text":136,"correct":22},"分部工程",{"key":34,"text":138,"correct":26},"单位工程","ABE",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":154,"analysis":37},1104836,"国家、省市重点工程项目或一些特大型、大型工程项目的（ ），必须有地方城建档案管理部门参加。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"单机试车",{"key":24,"text":147,"correct":22},"联合试车",{"key":28,"text":149,"correct":26},"工程验收",{"key":31,"text":151,"correct":22},"工程移交",{"key":34,"text":153,"correct":26},"工程预验收","CE",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":52,"analysis":37},1104837,"监理工作总结包括（）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"向总监理工程师提交的工作总结",{"key":24,"text":162,"correct":26},"向监理单位提交的工作总结",{"key":28,"text":164,"correct":22},"向政府有关部门提交的工作总结",{"key":31,"text":166,"correct":26},"向建设单位提交的监理工作总结",{"key":34,"text":168,"correct":22},"向资质年检部门提交的工作总结",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":139,"analysis":37},1104838,"下列文件资料中，属于建设工程监理文件资料的有（ ）。",[173,175,176,177,178],{"key":20,"text":174,"correct":26},"分包单位资格报审会议纪要",{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":22},{"key":34,"text":179,"correct":26},"见证取样文件资料",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":193,"analysis":37},1104840,"由总监理工程师签字并加盖执业印章的表式有()。",[184,186,188,190,192],{"key":20,"text":185,"correct":26},"工程开工令",{"key":24,"text":187,"correct":26},"工程复工令",{"key":28,"text":189,"correct":26},"工程款支付证书",{"key":31,"text":191,"correct":22},"总监理工程师任命书",{"key":34,"text":62,"correct":26},"ABCE",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":193,"analysis":37},1104841,"建设工程监理表格体系中，属于施工单位报审、报验用表的有()。",[198,199,200,201,202],{"key":20,"text":58,"correct":26},{"key":24,"text":75,"correct":26},{"key":28,"text":73,"correct":26},{"key":31,"text":185,"correct":22},{"key":34,"text":203,"correct":26},"分部工程报验表",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":193,"analysis":37},1104842,"工程监理文件资料组卷时，可以按（）组卷。",[208,209,210,212,214],{"key":20,"text":138,"correct":26},{"key":24,"text":136,"correct":26},{"key":28,"text":211,"correct":26},"专业",{"key":31,"text":213,"correct":22},"文件的形成单位",{"key":34,"text":134,"correct":26},{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":80,"analysis":37},1104843,"下列符合工程监理文件资料编制要求的有()。",[219,221,223,225,227],{"key":20,"text":220,"correct":22},"工程文件一般为复印件",{"key":24,"text":222,"correct":26},"文件资料应字迹清楚，图样清晰，图表整洁，签字盖章手续完备",{"key":28,"text":224,"correct":26},"文件资料的内容必须真实、准确，与工程实际相符",{"key":31,"text":226,"correct":26},"文件资料应采用耐久性强的书写材料",{"key":34,"text":228,"correct":22},"工程文件中文字材料幅面尺寸规格宜为A3幅面",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":239,"analysis":37},1104844,"（2020年真题）根据《建设工程监理规范》，需要经建设单位审批的监理文件资料有（ ）。",[233,234,235,236,238],{"key":20,"text":64,"correct":22},{"key":24,"text":75,"correct":26},{"key":28,"text":203,"correct":22},{"key":31,"text":237,"correct":26},"工程款支付报审表",{"key":34,"text":78,"correct":26},"BDE",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":95,"analysis":37},1104845,"（2020年真题）根据《建设工程监理规范》，监理日志应包括的内容有（ ）。",[244,246,248,250,252],{"key":20,"text":245,"correct":26},"天气和施工环境情况",{"key":24,"text":247,"correct":26},"当日监理工作情况",{"key":28,"text":249,"correct":26},"当日施工进展情况",{"key":31,"text":251,"correct":26},"当日存在的问题及处理情况",{"key":34,"text":253,"correct":22},"次日监理工作任务",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":193,"analysis":37},1104846,"(2009年真题）建设工程文件的内容不同，组卷方法也不尽相同，监理文件资料可以按（ ）组卷。",[258,259,260,261,262],{"key":20,"text":138,"correct":26},{"key":24,"text":136,"correct":26},{"key":28,"text":211,"correct":26},{"key":31,"text":213,"correct":22},{"key":34,"text":263,"correct":26},"工程进展阶段",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":278,"analysis":37},1104847,"(2015年真题）关于建设工程监理文件资料组卷要求的说法，正确的有（ ）。",[268,270,272,274,276],{"key":20,"text":269,"correct":22},"案卷厚度应一致，每卷厚度为40mm",{"key":24,"text":271,"correct":22},"案卷内应由重份文件作为备份",{"key":28,"text":273,"correct":22},"不同载体文件应按形成时间统一组卷",{"key":31,"text":275,"correct":26},"文字材料按事项、专业顺序排列",{"key":34,"text":277,"correct":26},"相同专业图纸按图号顺序排列","DE",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":291,"analysis":37},1104848,"(2015年真题）根据《建设工程监理规范》（GB\u002FT50319－2013），需要由总监理工程师签字并加盖执业印章的有（ ）。",[283,284,285,287,289],{"key":20,"text":237,"correct":26},{"key":24,"text":203,"correct":22},{"key":28,"text":286,"correct":22},"施工进度计划报审表",{"key":31,"text":288,"correct":22},"工程材料、构配件、设备报审表",{"key":34,"text":290,"correct":26},"工程临时延期报审表","AE",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":110,"analysis":37},1104849,"(2014年真题）根据《建设工程监理规范》（GB\u002FT 50319-2013），属于各方主体通用表的有（ ）。",[296,298,300,302,304],{"key":20,"text":297,"correct":26},"工作联系单",{"key":24,"text":299,"correct":26},"工程变更单",{"key":28,"text":301,"correct":26},"索赔意向通知书",{"key":31,"text":303,"correct":22},"报验、报审表",{"key":34,"text":58,"correct":22},{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":291,"analysis":37},1104850,"(2013年真题）下列工作表格中,可由建设单位使用的有（ ）。",[309,310,311,312,313],{"key":20,"text":299,"correct":26},{"key":24,"text":60,"correct":22},{"key":28,"text":189,"correct":22},{"key":31,"text":62,"correct":22},{"key":34,"text":297,"correct":26},{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":328,"analysis":37},1104851,"(2010年真题）下列施工单位报验的项目中，不使用《________报验报审表》报验的有（ ）。",[318,320,322,324,326],{"key":20,"text":319,"correct":26},"工程竣工",{"key":24,"text":321,"correct":22},"隐蔽工程",{"key":28,"text":323,"correct":22},"分项工程",{"key":31,"text":325,"correct":26},"工程材料",{"key":34,"text":327,"correct":26},"工程设备","ADE",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":52,"analysis":37},1104852,"(2011年真题）下列工程中，其工程档案不需移交城建档案管理部门，暂由建设单位保管的有（ ）。",[333,334,335,336,337],{"key":20,"text":43,"correct":22},{"key":24,"text":45,"correct":26},{"key":28,"text":47,"correct":22},{"key":31,"text":49,"correct":26},{"key":34,"text":338,"correct":22},"修缮工程",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":154,"analysis":37},1104853,"(2011年真题）国家、省市重点工程项目或一些特大型、大型工程项目的（ ），必须有地方城建档案管理部门参加。",[343,344,345,346,347],{"key":20,"text":145,"correct":22},{"key":24,"text":147,"correct":22},{"key":28,"text":149,"correct":26},{"key":31,"text":151,"correct":22},{"key":34,"text":153,"correct":26},{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":362,"analysis":37},1104854,"(2019年真题）根据《建设工程监理规范》总监理工程师签认《工程开工报审表》应满足的条件有（ ）。",[352,354,356,358,360],{"key":20,"text":353,"correct":26},"设计交底和图纸会审已完成",{"key":24,"text":355,"correct":22},"施工组织设计已经编制完成",{"key":28,"text":357,"correct":26},"管理及施工人员已到位",{"key":31,"text":359,"correct":26},"进场道路及水、电、通信等已满足开工要求",{"key":34,"text":361,"correct":22},"施工许可证已经办理","ACD",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":373,"analysis":37},1104855,"(2019年真题）下列表式中，属于各方通用表式的有（ ）。",[367,368,369,371,372],{"key":20,"text":58,"correct":22},{"key":24,"text":299,"correct":26},{"key":28,"text":370,"correct":26},"索赔意向通知单",{"key":31,"text":62,"correct":22},{"key":34,"text":64,"correct":22},"BC",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":139,"analysis":37},1104856,"(2018年真题）项目监理机构编制的工程质量评估报告应包括的内容有（ ）。",[378,380,382,384,386],{"key":20,"text":379,"correct":26},"工程参建单位",{"key":24,"text":381,"correct":26},"工程质量验收情况",{"key":28,"text":383,"correct":22},"竣工验收情况",{"key":31,"text":385,"correct":22},"监理工作经验与教训",{"key":34,"text":387,"correct":26},"工程质量事故处理情况",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":402,"analysis":37},1104857,"(2018年真题）根据《建设工程监理规范》，监理工作总结应包括的内容有（ ）。",[392,394,396,398,400],{"key":20,"text":393,"correct":22},"项目监理目标",{"key":24,"text":395,"correct":22},"项目监理工作内容",{"key":28,"text":397,"correct":26},"项目监理机构",{"key":31,"text":399,"correct":26},"监理工作成效",{"key":34,"text":401,"correct":22},"监理工作程序","CD",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":67,"analysis":37},1104858,"(2018年真题）根据《建设工程监理规范》，监理日志应包括的内容有（ ）。",[407,409,411,413,415],{"key":20,"text":408,"correct":26},"旁站情况",{"key":24,"text":410,"correct":22},"工地会议记录",{"key":28,"text":412,"correct":26},"巡视情况",{"key":31,"text":414,"correct":22},"存在问题及处理",{"key":34,"text":416,"correct":26},"平行检验情况",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":431,"analysis":37},1104859,"(2017年真题）项目监理机构应签发《监理通知单》的情形有（ ）。",[421,423,425,427,429],{"key":20,"text":422,"correct":22},"未按审查通过的工程设计文件施工的",{"key":24,"text":424,"correct":22},"未经批准擅自组织施工的",{"key":28,"text":426,"correct":26},"在工程质量方面存在违规行为的",{"key":31,"text":428,"correct":26},"在工程进度方面存在违规行为的",{"key":34,"text":430,"correct":26},"使用不合格的工程材料的","CDE",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":373,"analysis":37},1104860,"(2017年真题）下列工程中，监理文件资料暂由建设单位保管的有（ ）。",[436,437,438,439,440],{"key":20,"text":51,"correct":22},{"key":24,"text":45,"correct":26},{"key":28,"text":49,"correct":26},{"key":31,"text":43,"correct":22},{"key":34,"text":47,"correct":22},{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":95,"analysis":37},1104861,"(2016年真题）下列报审表中，需要建设单位签署审批意见的有（ ）。",[445,446,447,448,449],{"key":20,"text":58,"correct":26},{"key":24,"text":75,"correct":26},{"key":28,"text":62,"correct":26},{"key":31,"text":66,"correct":26},{"key":34,"text":64,"correct":22},{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":464,"analysis":37},1104862,"(2016年真题）下列工作内容中，属于建设工程监理文件资料管理的有（ ）。",[454,456,458,460,462],{"key":20,"text":455,"correct":26},"收发文与登记",{"key":24,"text":457,"correct":22},"文件起草与修改",{"key":28,"text":459,"correct":26},"文件传阅",{"key":31,"text":461,"correct":26},"文件分类存放",{"key":34,"text":463,"correct":26},"文件组卷归档","ACDE",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":154,"analysis":37},1104863,"(2015年真题）下列监理文件资料中，需要建设单位审批同意的有（ ）。",[469,470,471,472,473],{"key":20,"text":185,"correct":22},{"key":24,"text":60,"correct":22},{"key":28,"text":62,"correct":26},{"key":31,"text":64,"correct":22},{"key":34,"text":66,"correct":26},{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":36,"analysis":37},1104864,"(2015年真题）下列文件资料中，属于建设工程监理文件资料的有（ ）。",[478,479,480,481,482],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":22},{"key":34,"text":35,"correct":26},{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":80,"analysis":37},1104868,"下列工作内容中，属于建设工程目标动态控制过程的有()。",[487,489,491,493,495],{"key":20,"text":488,"correct":22},"组织",{"key":24,"text":490,"correct":26},"计划",{"key":28,"text":492,"correct":26},"执行",{"key":31,"text":494,"correct":26},"检查",{"key":34,"text":496,"correct":22},"协调",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":511,"analysis":37},1104869,"下列目标控制的措施中，属于经济措施的有()。",[501,503,505,507,509],{"key":20,"text":502,"correct":22},"建立动态控制过程中的激励机制",{"key":24,"text":504,"correct":26},"审核工程量及工程结算报告",{"key":28,"text":506,"correct":26},"对工程变更方案进行技术经济分析",{"key":31,"text":508,"correct":22},"选择合理的承发包模式和合同计价方法",{"key":34,"text":510,"correct":26},"进行投资偏差分析和未完工程投资预测","BCE",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":526,"analysis":37},1104873,"关于建设工程信息管理的说法，正确的有()。",[516,518,520,522,524],{"key":20,"text":517,"correct":26},"工程监理人员对于数据和信息的加工要从鉴别开始",{"key":24,"text":519,"correct":26},"信息检索需要建立在一定的分级管理制度上",{"key":28,"text":521,"correct":22},"工程参建各方应分别确定各自的数据存储与编码体系",{"key":31,"text":523,"correct":26},"尽可能以网络数据库形式存储数据，以实现数据共享",{"key":34,"text":525,"correct":26},"需要信息的部门和人员有权在第一时间得到所需要的信息","ABDE",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":95,"analysis":37},1104874,"项目监理机构对监理单位内部检测设备需求进行协调平衡时应该注意的内容有()。",[531,533,535,537,539],{"key":20,"text":532,"correct":26},"规格的明确性",{"key":24,"text":534,"correct":26},"数量的准确性",{"key":28,"text":536,"correct":26},"质量的规定性",{"key":31,"text":538,"correct":26},"期限的及时性",{"key":34,"text":540,"correct":22},"使用的规范性",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":291,"analysis":37},1104886,"项目监理机构在施工阶段进度控制的任务有（ ）。",[545,547,549,551,553],{"key":20,"text":546,"correct":26},"完善建设工程控制性进度计划",{"key":24,"text":548,"correct":22},"审查施工单位专项施工方案",{"key":28,"text":550,"correct":22},"审查施工单位工程变更申请",{"key":31,"text":552,"correct":22},"制定预防工程索赔措施",{"key":34,"text":554,"correct":26},"组织召开进度协调会",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":193,"analysis":37},1104887,"下列目标控制措施中，属于经济措施的有（ ）。",[559,561,562,563,565],{"key":20,"text":560,"correct":26},"编制和实施资金使用计划",{"key":24,"text":504,"correct":26},{"key":28,"text":506,"correct":26},{"key":31,"text":564,"correct":22},"选择合理的承发包模式和合同计价方式",{"key":34,"text":510,"correct":26},{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":110,"analysis":37},1104888,"关于第一次工地会议的说法，错误的是（ ）。",[570,572,574,576,578],{"key":20,"text":571,"correct":26},"第一次工地会议应由总监理工程师组织召开",{"key":24,"text":573,"correct":26},"第一次工地会议应在总监理工程师下达开工令后召开",{"key":28,"text":575,"correct":26},"第一次工地会议的会议纪要由建设单位负责整理",{"key":31,"text":577,"correct":22},"第一次工地会议总监理工程师应介绍监理规划等相关内容",{"key":34,"text":579,"correct":22},"第一次工地会议应由建设单位组织召开",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":328,"analysis":37},1104889,"为了有效地控制建设工程三大目标，需要逐级分解建设工程总目标，按（ ）等制定分目标、子目标及可执行目标，形成建设工程目标体系。",[584,586,588,590,591],{"key":20,"text":585,"correct":26},"工程项目时间进展",{"key":24,"text":587,"correct":22},"工程质量控制",{"key":28,"text":589,"correct":22},"工程造价控制",{"key":31,"text":379,"correct":26},{"key":34,"text":592,"correct":26},"工程项目组成",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":110,"analysis":37},1104890,"合同管理是监理机构控制（ ）的重要手段。",[597,599,601,603,605],{"key":20,"text":598,"correct":26},"质量",{"key":24,"text":600,"correct":26},"造价",{"key":28,"text":602,"correct":26},"进度",{"key":31,"text":604,"correct":22},"安全",{"key":34,"text":606,"correct":22},"信息",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":95,"analysis":37},1104891,"监理单位审查施工单位的管理制度、人员资格及验收手续时，应该审查（ ）。",[611,613,615,617,619],{"key":20,"text":612,"correct":26},"审查施工单位现场安全生产规章制度的建立和实施情况",{"key":24,"text":614,"correct":26},"审查施工单位安全生产许可证的符合性和有效性",{"key":28,"text":616,"correct":26},"审查施工单位项目经理、专职安全生产管理人员和特种作业人员的资格",{"key":31,"text":618,"correct":26},"核查施工机械和设施的安全许可验收手续",{"key":34,"text":620,"correct":22},"专项施工方案",{"id":622,"libraryId":5,"type":15,"typeLabel":16,"stem":623,"options":624,"answer":95,"analysis":37},1104896,"项目监理机构编制的见证取样实施细则应包括的内容有()。",[625,627,629,631,633],{"key":20,"text":626,"correct":26},"见证取样方法",{"key":24,"text":628,"correct":26},"见证取样范围",{"key":28,"text":630,"correct":26},"见证人员职责",{"key":31,"text":632,"correct":26},"见证工作程序",{"key":34,"text":634,"correct":22},"见证试验方法",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":110,"analysis":37},1104897,"关于见证取样的说法，正确的有()。",[639,641,643,645,647],{"key":20,"text":640,"correct":26},"国家级和省级计量认证机构认证的实施效力相同",{"key":24,"text":642,"correct":26},"见证人员必须取得《见证员证书》且有建设单位授权",{"key":28,"text":644,"correct":26},"检测单位接收委托检验任务时，须有送检单位填写的委托单",{"key":31,"text":646,"correct":22},"见证人员应协助取样人员按随机取样方法和试件制作方法取样",{"key":34,"text":648,"correct":22},"见证取样涉及的行为主体有材料供货方、施工方和见证方",{"id":650,"libraryId":5,"type":15,"typeLabel":16,"stem":651,"options":652,"answer":663,"analysis":37},1104898,"关于项目监理机构巡视的说法，正确的有()。",[653,655,657,659,661],{"key":20,"text":654,"correct":22},"总监理工程师应根据施工组织设计对监理人员进行巡视交底",{"key":24,"text":656,"correct":26},"总监理工程师进行巡视交底时应明确巡视检查要点、巡视频率",{"key":28,"text":658,"correct":26},"总监理工程师进行巡视交底时应对采用巡视检查记录表提出明确要求",{"key":31,"text":660,"correct":26},"总监理工程师应检查监理人员的巡视工作成果",{"key":34,"text":662,"correct":26},"监理人员的巡视检查应主要关注施工质量和安全生产","BCDE",{"id":665,"libraryId":5,"type":15,"typeLabel":16,"stem":666,"options":667,"answer":193,"analysis":37},1104901,"见证取样的检验报告应满足的基本要求有（ ）。",[668,670,672,674,676],{"key":20,"text":669,"correct":26},"试验报告应电脑打印",{"key":24,"text":671,"correct":26},"试验报告采用统一用表",{"key":28,"text":673,"correct":26},"试验报告签名一定要手签",{"key":31,"text":675,"correct":22},"注明取样人的姓名",{"key":34,"text":677,"correct":26},"应有“见证检验专用章”",[679,683,686,689,692,695],{"id":680,"name":681,"category":7,"favorite":682},1,"领导干部任职前廉政法规知识测试题",92,{"id":684,"name":685,"category":7,"favorite":680},595,"建筑结构与设备",{"id":687,"name":688,"category":7,"favorite":680},715,"招标采购专业知识与法律法规",{"id":690,"name":691,"category":7,"favorite":680},848,"市政方向-通用基础",{"id":693,"name":694,"category":7,"favorite":8},534,"BIM工程师",{"id":696,"name":694,"category":7,"favorite":8},535]