[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-35":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":728},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,35,50,2341,[13,38,53,68,83,98,113,128,143,157,171,186,200,215,229,243,257,272,287,300,315,330,345,359,372,387,401,415,429,443,456,470,484,496,508,522,537,551,565,580,594,608,622,637,651,665,678,692,701,716],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1104755,2,"多选题","下列选项中，属于风险分析与评价任务的有()。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","确定单一风险因素发生的概率",true,{"key":24,"text":25,"correct":26},"B","建立初始风险清单",false,{"key":28,"text":29,"correct":22},"C","分析单一风险因素的影响范围大小",{"key":31,"text":32,"correct":22},"D","分析各个风险因素的发生时间",{"key":34,"text":35,"correct":26},"E","仅在于找出风险因素和风险事件","ACD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1104756,"在建设工程风险初始清单中，政治法律风险因素的典型风险事件有()。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"骚乱",{"key":24,"text":45,"correct":22},"战争",{"key":28,"text":47,"correct":26},"通货膨胀",{"key":31,"text":49,"correct":22},"经济制裁",{"key":34,"text":51,"correct":22},"法律法规的变化","ABDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1104757,"在建设工程风险初始清单中，施工风险因素的典型风险事件有()。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"施工工艺落后",{"key":24,"text":60,"correct":26},"未考虑施工可能性",{"key":28,"text":62,"correct":22},"施工安全措施不当",{"key":31,"text":64,"correct":22},"未考虑场地情况",{"key":34,"text":66,"correct":22},"施工技术和方案不合理","ACDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1104758,"下列选项中，属于建设工程监理与项目管理服务的区别的有()。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"服务性质不同",{"key":24,"text":75,"correct":26},"服务的对象不同",{"key":28,"text":77,"correct":22},"服务范围不同",{"key":31,"text":79,"correct":26},"服务方式不同",{"key":34,"text":81,"correct":22},"服务侧重点不同","ACE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1104759,"在工程勘察过程中，工程监理单位应提供的服务包括( )。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"协助建设单位编制工程勘察设计任务书",{"key":24,"text":90,"correct":22},"检查勘察单位内业是否规范",{"key":28,"text":92,"correct":22},"应审查工程勘察单位提交的勘察方案",{"key":31,"text":94,"correct":22},"对重要点位的勘探与测试应进行现场检查",{"key":34,"text":96,"correct":22},"由总监理工程师组织编制勘察评估报告","BCDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1104760,"下列选项中，属于工程勘察方案审查的重点内容有()。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"勘察点的布置是否合理",{"key":24,"text":105,"correct":22},"勘察重点是否符合勘察项目特点",{"key":28,"text":107,"correct":22},"勘察进度计划是否满足工程总进度计划",{"key":31,"text":109,"correct":26},"应急预案是否完善",{"key":34,"text":111,"correct":22},"勘察单位现场勘察组织及人员安排是否合理","ABCE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},1104761,"工程监理单位提供设计过程中的服务时，应审查设计单位提交的设计成果，并提出评估报告，评估报告应包括的主要内容有()。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"设计工作概况",{"key":24,"text":120,"correct":22},"设计深度、与设计标准的符合情况",{"key":28,"text":122,"correct":22},"设计任务书的完成情况",{"key":31,"text":124,"correct":22},"存在的问题及建议",{"key":34,"text":126,"correct":26},"各阶段、各专业工种设计工作量和工作难度","ABCD",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":142,"analysis":37},1104762,"下列计划中，属于应急计划的有（ ）。",[132,134,136,138,140],{"key":20,"text":133,"correct":26},"现场人员安全撤离计划",{"key":24,"text":135,"correct":22},"材料与设备采购调整计划",{"key":28,"text":137,"correct":26},"伤亡人员援救及处理计划",{"key":31,"text":139,"correct":22},"建设工程实施进度调整计划",{"key":34,"text":141,"correct":22},"材料与设备供应调整计划","BDE",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":52,"analysis":37},1104763,"下列选项中，属于风险识别方法的有()。",[147,149,151,153,155],{"key":20,"text":148,"correct":22},"专家调查法",{"key":24,"text":150,"correct":22},"财务报表法",{"key":28,"text":152,"correct":26},"德尔菲法",{"key":31,"text":154,"correct":22},"流程图法",{"key":34,"text":156,"correct":22},"初始清单法",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":52,"analysis":37},1104764,"下列选项中，属于PMBOK九大知识领域的有()。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"项目质量管理",{"key":24,"text":164,"correct":22},"项目范围管理",{"key":28,"text":166,"correct":26},"项目运营管理",{"key":31,"text":168,"correct":22},"项目集成管理",{"key":34,"text":170,"correct":22},"项目人力资源管理",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},1104765,"下列选项中，属于多项目管理的有()。",[175,177,179,181,183],{"key":20,"text":176,"correct":26},"项目沟通管理",{"key":24,"text":178,"correct":22},"项目群管理",{"key":28,"text":180,"correct":26},"项目风险管理",{"key":31,"text":182,"correct":26},"项目采购管理",{"key":34,"text":184,"correct":22},"组合项目管理","BE",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":82,"analysis":37},1104766,"下列选项中，风险识别的主要内容有()。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"识别引起风险的主要因素",{"key":24,"text":193,"correct":26},"识别风险的影响范围",{"key":28,"text":195,"correct":22},"识别风险的性质",{"key":31,"text":197,"correct":26},"识别风险的来源",{"key":34,"text":199,"correct":22},"识别风险可能引起的后果",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},1104767,"在初始清单法中，对于大型复杂工程的单位工程应分别从()进行分解。",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"时间维",{"key":24,"text":207,"correct":22},"目标维",{"key":28,"text":209,"correct":26},"分部工程",{"key":31,"text":211,"correct":26},"分项工程",{"key":34,"text":213,"correct":22},"因素维","ABE",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":112,"analysis":37},1104768,"灾难计划是针对严重风险事件制定的，其内容应满足（ ）的要求。",[219,221,223,225,227],{"key":20,"text":220,"correct":22},"援救及处理伤亡人员",{"key":24,"text":222,"correct":22},"安全撤离现场人员",{"key":28,"text":224,"correct":22},"保证受影响区域的安全尽快恢复正常",{"key":31,"text":226,"correct":26},"使因严重风险事件而中断的工程实施过程尽快全面恢复",{"key":34,"text":228,"correct":22},"控制事故的进一步发展，最大限度地减少资产和环境损害",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":97,"analysis":37},1104769,"工程监理单位应协助建设单位组织专家对工程设计成果进行评审，下列属于工程设计成果评价程序的有（ ）。",[233,235,237,239,241],{"key":20,"text":234,"correct":26},"提出专家评审的意见",{"key":24,"text":236,"correct":22},"事先建立评审制度和程序",{"key":28,"text":238,"correct":22},"确定相应的专家人选",{"key":31,"text":240,"correct":22},"邀请专家参与评审",{"key":34,"text":242,"correct":22},"组织相关专家对设计成果评审会议",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":112,"analysis":37},1104770,"工程勘察成果评估报告应包括的内容有（ ）。",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"勘察工作概况",{"key":24,"text":250,"correct":22},"勘察报告编制深度，与勘察标准的符合情况",{"key":28,"text":252,"correct":22},"勘察任务书的完成情况",{"key":31,"text":254,"correct":26},"有关单位审查意见的落实情况",{"key":34,"text":256,"correct":22},"存在问题及建议",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":271,"analysis":37},1104771,"除建设工程监理部负责完成建设工程监理合同和《建设工程监理规范》GB\u002FT 50319—2013中规定的监理工作外，规划设计、合同信息、工程管理等部门将分别负责承担工程项目管理服务相关职责，下列属于工程管理部职责的有（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":26},"负责工程项目信息管理工作",{"key":24,"text":264,"correct":22},"进行外部协调工作",{"key":28,"text":266,"correct":22},"协助建设单位办理前期有关报批手续",{"key":31,"text":268,"correct":22},"协助建设单位编制工程项目管理计划",{"key":34,"text":270,"correct":26},"项目目标论证及控制策划","BCD",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":286,"analysis":37},1104772,"（2020年真题）按照工程项目管理单位与建设单位的结合方式不同，全过程集成化项目管理服务模式有（ ）。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"独立式",{"key":24,"text":279,"correct":26},"顾问式",{"key":28,"text":281,"correct":26},"并行式",{"key":31,"text":283,"correct":22},"融合式",{"key":34,"text":285,"correct":22},"植入式","ADE",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":299,"analysis":37},1104773,"(2010年真题）损失控制计划系统中的灾难计划，应至少满足（ ）等要求。",[291,292,293,295,297],{"key":20,"text":222,"correct":22},{"key":24,"text":220,"correct":22},{"key":28,"text":294,"correct":22},"控制事故发展和减少资产损害措施",{"key":31,"text":296,"correct":26},"调整施工进度计划方案",{"key":34,"text":298,"correct":26},"调整材料和设备采购计划方案","ABC",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":314,"analysis":37},1104774,"(2011年真题）导致非计划性风险自留的原因主要有（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"缺乏风险意识",{"key":24,"text":307,"correct":22},"风险识别失误",{"key":28,"text":309,"correct":26},"已建立非基金储备",{"key":31,"text":311,"correct":26},"有母公司保险",{"key":34,"text":313,"correct":26},"期望损失不严重","AB",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":329,"analysis":37},1104775,"(2011年真题）对每一个建设工程的风险都从头开始识别，该做法的缺点有（ ）。",[319,321,323,325,327],{"key":20,"text":320,"correct":26},"不利于专业风险识别人员积累经验",{"key":24,"text":322,"correct":22},"耗费时间和精力，风险识别工作效率低",{"key":28,"text":324,"correct":22},"可能导致风险识别的随意性",{"key":31,"text":326,"correct":26},"不利于按时间维对建设工程风险进行分解",{"key":34,"text":328,"correct":22},"不便积累风险识别的成果资料","BCE",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":344,"analysis":37},1104776,"(2011年真题）与其他的风险对策相比，非保险转移对策的优点主要体现在（ ）。",[334,336,338,340,342],{"key":20,"text":335,"correct":22},"可以转移某些不可投保的潜在损失",{"key":24,"text":337,"correct":26},"双方当事人对合同条款的理解不会发生分歧",{"key":28,"text":339,"correct":22},"被转移者有能力更好地进行损失控制",{"key":31,"text":341,"correct":26},"可以中断风险源，使其不发生或不再发展",{"key":34,"text":343,"correct":26},"可以降低损失的发生概率或降低损失的严重程度","AC",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":127,"analysis":37},1104777,"(2015年真题）工程监理单位对工程勘察方案审查的内容有（ ）。",[349,351,353,355,357],{"key":20,"text":350,"correct":22},"勘察工作内容是否与勘察合同及设计要求相符",{"key":24,"text":352,"correct":22},"勘察点布置是否合理",{"key":28,"text":354,"correct":22},"现场勘察组织及人员安排是否合理",{"key":31,"text":356,"correct":22},"勘察进度计划是否满足工程总进度计划要求",{"key":34,"text":358,"correct":26},"试样的数量和质量是否符合规范要求",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":214,"analysis":37},1104778,"(2014年真题）下列建设工程风险事件中，属于技术风险的有（ ）。",[363,365,367,369,371],{"key":20,"text":364,"correct":22},"设计规范应用不当",{"key":24,"text":366,"correct":22},"施工方案不合理",{"key":28,"text":368,"correct":26},"合同条款有遗漏",{"key":31,"text":370,"correct":26},"施工设备供应不足",{"key":34,"text":62,"correct":22},{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":386,"analysis":37},1104779,"(2015年真题）按风险影响范围划分，建设工程风险种类有（ ）。",[376,378,380,382,384],{"key":20,"text":377,"correct":26},"社会风险",{"key":24,"text":379,"correct":22},"局部风险",{"key":28,"text":381,"correct":22},"总体风险",{"key":31,"text":383,"correct":26},"经济风险",{"key":34,"text":385,"correct":26},"管理风险","BC",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":127,"analysis":37},1104780,"(2016年真题）关于采用初始清单法识别风险的说法，正确的有（ ）。",[391,393,395,397,399],{"key":20,"text":392,"correct":22},"初始清单可由有关人员利用所掌握的丰富知识设计而成",{"key":24,"text":394,"correct":22},"建立初始清单是为了便于人们较全面地认识工程风险的存在",{"key":28,"text":396,"correct":22},"利用初始清单有利于风险识别人员不遗漏重要的工程风险",{"key":31,"text":398,"correct":22},"建立初始清单需要参照同类工程风险的经验数据",{"key":34,"text":400,"correct":26},"初始清单中列出的风险，是风险识别的最终结论",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":112,"analysis":37},1104781,"(2016年真题）关于风险跟踪检查与报告的说法，正确的有（ ）。",[405,407,409,411,413],{"key":20,"text":406,"correct":22},"跟踪风险控制措施的效果是风险监控的主要内容",{"key":24,"text":408,"correct":22},"应定期将跟踪结果编制成风险跟踪报告",{"key":28,"text":410,"correct":22},"风险跟踪过程中发现新的风险因素时应进行重新估计",{"key":31,"text":412,"correct":26},"风险跟踪报告内容的详细程度应依据掌握的资料确定",{"key":34,"text":414,"correct":22},"编制和提交风险跟踪报告是风险管理的一项日常工作",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":127,"analysis":37},1104782,"(2017年真题）采用工程保险方式转移工程风险时，需要考虑的内容有（ ）。",[419,421,423,425,427],{"key":20,"text":420,"correct":22},"保险安排方式",{"key":24,"text":422,"correct":22},"保险类型选择",{"key":28,"text":424,"correct":22},"保险人选择",{"key":31,"text":426,"correct":22},"保险合同谈判",{"key":34,"text":428,"correct":26},"保险索赔报告",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":36,"analysis":37},1104783,"(2017年真题）关于计划性风险自留的说法，正确的有（ ）。",[433,435,437,439,441],{"key":20,"text":434,"correct":22},"计划性风险自留是有计划的选择",{"key":24,"text":436,"correct":26},"风险自留一般单独运用效果较好",{"key":28,"text":438,"correct":22},"应保证重大风险已有对策后才使用",{"key":31,"text":440,"correct":22},"在风险管理人员正确识别和评价风险后使用",{"key":34,"text":442,"correct":26},"通常采用外部控制措施来化解风险",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":286,"analysis":37},1104784,"(2016年真题）下列内容中，属于工程设计评估报告内容的有（ ）。",[447,448,450,452,454],{"key":20,"text":122,"correct":22},{"key":24,"text":449,"correct":26},"各专业计划的衔接情况",{"key":28,"text":451,"correct":26},"出图节点与总体计划的符合情况",{"key":31,"text":453,"correct":22},"有关部门审查意见的落实情况",{"key":34,"text":455,"correct":22},"设计深度与设计标准的符合情况",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":469,"analysis":37},1104785,"(2017年真题）建设工程风险初始清单中，属于非技术风险的有（ ）。",[460,462,464,465,467],{"key":20,"text":461,"correct":26},"设计风险",{"key":24,"text":463,"correct":26},"施工风险",{"key":28,"text":383,"correct":22},{"key":31,"text":466,"correct":22},"合同风险",{"key":34,"text":468,"correct":22},"材料风险","CDE",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":112,"analysis":37},1104786,"(2018年真题）工程设计阶段，工程监理单位协助建设单位报审工程设计文件时，需要开展的工作内容有（ ）。",[474,476,478,480,482],{"key":20,"text":475,"correct":22},"了解政府对设计文件的审批程序、报审条件等信息",{"key":24,"text":477,"correct":22},"向相关部门咨询，获得相关部门的咨询意见",{"key":28,"text":479,"correct":22},"事前检查设计文件及附件的完整性、合规性",{"key":31,"text":481,"correct":26},"联系相关政府部门，及时向建设单位反馈审批意见",{"key":34,"text":483,"correct":22},"协助设计单位落实政府有关部门的审批意见",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":214,"analysis":37},1104787,"(2018年真题）下列风险管理工作中，属于风险分析与评价工作内容的有（ ）。",[488,489,490,492,494],{"key":20,"text":21,"correct":22},{"key":24,"text":29,"correct":22},{"key":28,"text":491,"correct":26},"分析各风险因素之间相关性的大小",{"key":31,"text":493,"correct":26},"分析各个风险因素最适宜的管理措施",{"key":34,"text":495,"correct":22},"分析各个风险因素的结果",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":214,"analysis":37},1104788,"(2019年真题）下列风险识别方法中，属于专家调查法的有（ ）。",[500,502,503,504,506],{"key":20,"text":501,"correct":22},"访谈法",{"key":24,"text":152,"correct":22},{"key":28,"text":154,"correct":26},{"key":31,"text":505,"correct":26},"经验数据法",{"key":34,"text":507,"correct":22},"头脑风暴法",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":271,"analysis":37},1104795,"施工单位向项目监理机构申请()时，使用《__报验、报审表》。",[512,514,516,518,520],{"key":20,"text":513,"correct":26},"工程材料和构配件报验",{"key":24,"text":515,"correct":22},"隐蔽工程报验",{"key":28,"text":517,"correct":22},"检验批、分项工程的报验",{"key":31,"text":519,"correct":22},"为施工单位提供服务的试验室的报审",{"key":34,"text":521,"correct":26},"工程竣工报验",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":536,"analysis":37},1104796,"根据《建设工程监理规范》（GB\u002FT50319-2013），下列监理文件资料中，需要由总监理工程师签字并加盖执业印章的是()。",[526,528,530,532,534],{"key":20,"text":527,"correct":22},"工程款支付报审表",{"key":24,"text":529,"correct":26},"分部工程报验表",{"key":28,"text":531,"correct":26},"施工进度计划报审表",{"key":31,"text":533,"correct":26},"工程材料、构配件、设备报审表",{"key":34,"text":535,"correct":22},"工程临时延期报审表","AE",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":214,"analysis":37},1104797,"项目监理机构编制的工程质量评估报告应包括的内容有()。",[541,543,545,547,549],{"key":20,"text":542,"correct":22},"工程参建单位",{"key":24,"text":544,"correct":22},"工程质量验收情况",{"key":28,"text":546,"correct":26},"竣工验收情况",{"key":31,"text":548,"correct":26},"监理工作经验与教训",{"key":34,"text":550,"correct":22},"工程质量事故处理情况",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":67,"analysis":37},1104802,"根据《建设工程监理规范》，监理日志应包括的内容有()。",[555,557,559,561,563],{"key":20,"text":556,"correct":22},"旁站情况",{"key":24,"text":558,"correct":26},"工地会议记录",{"key":28,"text":560,"correct":22},"巡视情况",{"key":31,"text":562,"correct":22},"存在问题及处理",{"key":34,"text":564,"correct":22},"平行检验情况",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":579,"analysis":37},1104803,"根据《建设工程监理规范》，监理工作总结应包括的内容有()。",[569,571,573,575,577],{"key":20,"text":570,"correct":26},"项目监理目标",{"key":24,"text":572,"correct":26},"项目监理工作内容",{"key":28,"text":574,"correct":22},"项目监理机构",{"key":31,"text":576,"correct":22},"监理工作成效",{"key":34,"text":578,"correct":26},"监理工作程序","CD",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":67,"analysis":37},1104810,"下列工作内容中，属于建设工程监理文件资料管理的有()。",[584,586,588,590,592],{"key":20,"text":585,"correct":22},"收发文与登记",{"key":24,"text":587,"correct":26},"文件起草与修改",{"key":28,"text":589,"correct":22},"文件传阅",{"key":31,"text":591,"correct":22},"文件分类存放",{"key":34,"text":593,"correct":22},"文件组卷归档",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":286,"analysis":37},1104811,"下列对建设工程归档文件的要求中，属于编制要求的有()。",[598,600,602,604,606],{"key":20,"text":599,"correct":22},"符合国家有关的技术规范、标准",{"key":24,"text":601,"correct":26},"案卷不宜过厚，一般不超过40mm",{"key":28,"text":603,"correct":26},"不同载体的文件一般应分别组卷",{"key":31,"text":605,"correct":22},"内容真实、准确，与工程实际相符",{"key":34,"text":607,"correct":22},"应采用耐久性强的书写材料",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":185,"analysis":37},1104812,"根据有关建设工程档案管理的规定，暂由建设单位保管监理文件资料的工程有()。",[612,614,616,618,620],{"key":20,"text":613,"correct":26},"维修工程",{"key":24,"text":615,"correct":22},"缓建工程",{"key":28,"text":617,"correct":26},"改建工程",{"key":31,"text":619,"correct":26},"扩建工程",{"key":34,"text":621,"correct":22},"停建工程",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":636,"analysis":37},1104814,"关于建设工程监理文件资料组卷要求的说法，正确的有()。",[626,628,630,632,634],{"key":20,"text":627,"correct":26},"案卷厚度应一致，每卷厚度为40mm",{"key":24,"text":629,"correct":26},"案卷内应有重份文件作为备份",{"key":28,"text":631,"correct":26},"不同载体文件应按形成时间统一组卷",{"key":31,"text":633,"correct":22},"文字材料按事项、专业顺序排列",{"key":34,"text":635,"correct":22},"相同专业图纸按图号顺序排列","DE",{"id":638,"libraryId":5,"type":15,"typeLabel":16,"stem":639,"options":640,"answer":52,"analysis":37},1104821,"下列选项中，必须有城建档案管理部门参加的预验收和验收的工程项目有()。",[641,643,645,647,649],{"key":20,"text":642,"correct":22},"国家重点项目",{"key":24,"text":644,"correct":22},"省市重点项目",{"key":28,"text":646,"correct":26},"县级重点项目",{"key":31,"text":648,"correct":22},"某些特大型项目",{"key":34,"text":650,"correct":22},"某些大型项目",{"id":652,"libraryId":5,"type":15,"typeLabel":16,"stem":653,"options":654,"answer":469,"analysis":37},1104822,"根据《建设工程监理规范》GB／T 50319—2013，项目监理机构签发《监理通知单》的情形有()。",[655,657,659,661,663],{"key":20,"text":656,"correct":26},"施工单位未按审查通过的工程设计文件施工",{"key":24,"text":658,"correct":26},"施工单位违反工程建设强制性标准",{"key":28,"text":660,"correct":22},"工程存在安全事故隐患",{"key":31,"text":662,"correct":22},"施工单位未按审查通过的专项施工方案施工",{"key":34,"text":664,"correct":22},"因施工不当造成工程质量不合格",{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":271,"analysis":37},1104823,"在工程施工中，施工单位需要使用《___报验、报审表》的情况有( )。",[669,671,673,675,677],{"key":20,"text":670,"correct":26},"单位工程竣工验收报审表",{"key":24,"text":672,"correct":22},"隐蔽工程的报验",{"key":28,"text":674,"correct":22},"检验批的报验",{"key":31,"text":676,"correct":22},"分项工程的报验",{"key":34,"text":529,"correct":26},{"id":679,"libraryId":5,"type":15,"typeLabel":16,"stem":680,"options":681,"answer":299,"analysis":37},1104824,"根据《建设工程监理规范》GB／T 50319—2013，属于各方主体通用表的有()。",[682,684,686,688,690],{"key":20,"text":683,"correct":22},"工作联系单",{"key":24,"text":685,"correct":22},"工程变更单",{"key":28,"text":687,"correct":22},"索赔意向通知书",{"key":31,"text":689,"correct":26},"报验、报审表",{"key":34,"text":691,"correct":26},"工程开工报审表",{"id":693,"libraryId":5,"type":15,"typeLabel":16,"stem":694,"options":695,"answer":536,"analysis":37},1104825,"根据《建设工程监理规范》GB／T 50319--2013，需要由总监理工程师签字并加盖执业印章的有()。",[696,697,698,699,700],{"key":20,"text":527,"correct":22},{"key":24,"text":529,"correct":26},{"key":28,"text":531,"correct":26},{"key":31,"text":533,"correct":26},{"key":34,"text":535,"correct":22},{"id":702,"libraryId":5,"type":15,"typeLabel":16,"stem":703,"options":704,"answer":715,"analysis":37},1104826,"对于施工单位报送的工程开工报审表，属于总监签发前需要具备的条件的有()。",[705,707,709,711,713],{"key":20,"text":706,"correct":22},"施工组织设计已由总监理工程师签认",{"key":24,"text":708,"correct":22},"设计交底和图纸会审已完成",{"key":28,"text":710,"correct":26},"施工单位现场环境保护体系已建立",{"key":31,"text":712,"correct":22},"进场道路及水、电、通信等已满足开工要求",{"key":34,"text":714,"correct":26},"所有的工程材料已落实","ABD",{"id":717,"libraryId":5,"type":15,"typeLabel":16,"stem":718,"options":719,"answer":52,"analysis":37},1104827,"下列选项中，属于监理单位报送的工程质量评估报告主要内容的有()。",[720,722,723,725,726],{"key":20,"text":721,"correct":22},"工程质量事故及其处理情况",{"key":24,"text":542,"correct":22},{"key":28,"text":724,"correct":26},"安全生产管理方面的工作情况",{"key":31,"text":544,"correct":22},{"key":34,"text":727,"correct":22},"竣工资料审查情况",[729,733,736,739,742,745],{"id":730,"name":731,"category":7,"favorite":732},1,"领导干部任职前廉政法规知识测试题",92,{"id":734,"name":735,"category":7,"favorite":730},595,"建筑结构与设备",{"id":737,"name":738,"category":7,"favorite":730},715,"招标采购专业知识与法律法规",{"id":740,"name":741,"category":7,"favorite":730},848,"市政方向-通用基础",{"id":743,"name":744,"category":7,"favorite":8},534,"BIM工程师",{"id":746,"name":744,"category":7,"favorite":8},535]