[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-34":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":728},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,34,50,2341,[13,38,51,65,80,95,110,119,134,149,164,178,193,208,223,238,253,267,282,294,309,323,337,351,366,380,394,408,423,434,448,459,471,485,499,513,527,542,556,571,586,600,614,628,643,657,672,686,700,714],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1104673,2,"多选题","实行项目法人责任制的工程项目中，属于项目董事会的职权的有()。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","负责筹措建设资金",true,{"key":24,"text":25,"correct":22},"B","负责提出项目开工报告",{"key":27,"text":28,"correct":29},"C","负责控制工程投资、工期和质量",false,{"key":31,"text":32,"correct":29},"D","负责生产准备工作和培训有关人员",{"key":34,"text":35,"correct":22},"E","负责提出项目竣工验收申请报告","ABE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":50,"analysis":37},1104674,"下列选项中，属于项目董事会职权的有()。",[42,43,45,46,48],{"key":20,"text":21,"correct":22},{"key":24,"text":44,"correct":29},"组织编制项目初步设计文件",{"key":27,"text":35,"correct":22},{"key":31,"text":47,"correct":22},"提出项目开工报告",{"key":34,"text":49,"correct":22},"研究解决建设过程中出现的重大问题","ACDE",{"id":52,"libraryId":5,"type":15,"typeLabel":16,"stem":53,"options":54,"answer":36,"analysis":37},1104675,"工程监理实施依据包括（）。",[55,57,59,61,63],{"key":20,"text":56,"correct":22},"法律法规",{"key":24,"text":58,"correct":22},"工程建设标准",{"key":27,"text":60,"correct":29},"初步设计文件",{"key":31,"text":62,"correct":29},"施工合同",{"key":34,"text":64,"correct":22},"勘察设计文件及合同",{"id":66,"libraryId":5,"type":15,"typeLabel":16,"stem":67,"options":68,"answer":79,"analysis":37},1104676,"我国建设领域改革实行了多项配套制度，其中项目法人责任制与建设工程监理制之间的关系是（ ）。",[69,71,73,75,77],{"key":20,"text":70,"correct":22},"项目法人责任制是实行建设工程监理制的必要条件",{"key":24,"text":72,"correct":29},"项目法人责任制是实行建设工程监理制的基本保障",{"key":27,"text":74,"correct":29},"项目法人责任制是实行建设工程监理制的经济基础",{"key":31,"text":76,"correct":29},"建设工程监理制是实行项目法人责任制的约束机制",{"key":34,"text":78,"correct":22},"建设工程监理制是实行项目法人责任制的基本保障","AE",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":94,"analysis":37},1104677,"下列关于工程监理相关制度的说法中，正确的有（ ）。",[84,86,88,90,92],{"key":20,"text":85,"correct":22},"项目法人责任制要求项目法人对项目的策划、资金筹措、建设实施、生产经营、债务偿还和资产的保值增值，实行全过程负责",{"key":24,"text":87,"correct":29},"项目法人责任制是实行工程监理制的基本保障",{"key":27,"text":89,"correct":22},"国有单位经营性基本建设大中型项目在建设阶段必须组建项目法人",{"key":31,"text":91,"correct":29},"由原有企业负责建设的大中型基建项目，需设分公司或分厂的，要重新设立项目法人",{"key":34,"text":93,"correct":22},"提出项目开工报告属于项目董事会的职权","ACE",{"id":96,"libraryId":5,"type":15,"typeLabel":16,"stem":97,"options":98,"answer":109,"analysis":37},1104678,"施工单位的主要合同关系有()。",[99,101,103,105,107],{"key":20,"text":100,"correct":22},"工程分包合同",{"key":24,"text":102,"correct":22},"材料设备采购合同",{"key":27,"text":104,"correct":22},"运输合同",{"key":31,"text":106,"correct":22},"加工合同",{"key":34,"text":108,"correct":29},"工程监理合同","ABCD",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":109,"analysis":37},1104679,"施工单位签订的合同主要有（ ）",[114,115,116,117,118],{"key":20,"text":102,"correct":22},{"key":24,"text":100,"correct":22},{"key":27,"text":104,"correct":22},{"key":31,"text":106,"correct":22},{"key":34,"text":108,"correct":29},{"id":120,"libraryId":5,"type":15,"typeLabel":16,"stem":121,"options":122,"answer":133,"analysis":37},1104680,"根据《建设工程质量管理条例》，责令改正，处50万元以上100万元以下的罚款，降低资质等级或者吊销资质证书的情形有()。",[123,125,127,129,131],{"key":20,"text":124,"correct":29},"超越本单位资质等级承揽工程",{"key":24,"text":126,"correct":22},"与施工单位串通降低工程质量",{"key":27,"text":128,"correct":22},"将不合格工程按照合格签字",{"key":31,"text":130,"correct":29},"未对施工组织设计中的安全技术措施或者专项施工方案进行审查的",{"key":34,"text":132,"correct":29},"转让工程监理业务","BC",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":148,"analysis":37},1104681,"《建筑法》规定，工程监理单位与被监理工程的()不得有隶属关系或者其他利害关系。",[138,140,142,144,146],{"key":20,"text":139,"correct":29},"设计单位",{"key":24,"text":141,"correct":22},"承包单位",{"key":27,"text":143,"correct":29},"建设单位",{"key":31,"text":145,"correct":22},"设备供应单位",{"key":34,"text":147,"correct":29},"工程咨询单位","BD",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":163,"analysis":37},1104682,"《建筑法》规定，工程监理人员认为工程施工不符合( )的，有权要求建筑施工企业改正。",[153,155,157,159,161],{"key":20,"text":154,"correct":29},"工程设计规范",{"key":24,"text":156,"correct":29},"施工成本计划",{"key":27,"text":158,"correct":22},"工程设计要求",{"key":31,"text":160,"correct":22},"施工技术标准",{"key":34,"text":162,"correct":22},"承包合同约定","CDE",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":109,"analysis":37},1104683,"必须实行监理的工程包括( )",[168,170,172,174,176],{"key":20,"text":169,"correct":22},"国家重点建设工程",{"key":24,"text":171,"correct":22},"大中型公用事业工程",{"key":27,"text":173,"correct":22},"成片开发建设的住宅小区工程",{"key":31,"text":175,"correct":22},"利用外国政府或者国际组织贷款、援助资金的工程",{"key":34,"text":177,"correct":29},"总投资为2800万元的通信建设工程",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":192,"analysis":37},1104684,"根据《必须招标的工程项目规定》（国家发改委令第16号），下列工程必须招标的有（ ）。",[182,184,186,188,190],{"key":20,"text":183,"correct":29},"使用预算资金200万元人民币以上，且该资金占投资额5%的项目",{"key":24,"text":185,"correct":22},"使用国有企业事业单位资金，且该资金占控股或者主导地位的项目",{"key":27,"text":187,"correct":22},"使用世界银行贷款的项目",{"key":31,"text":189,"correct":22},"使用亚洲开发银行贷款的项目",{"key":34,"text":191,"correct":22},"使用外国政府及其机构贷款.援助资金的项目","BCDE",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":207,"analysis":37},1104690,"下列FIDIC 道德准则中，属于工程师社会和咨询业责任的有()。",[197,199,201,203,205],{"key":20,"text":198,"correct":29},"廉洁、正直和忠实地进行职业服务",{"key":24,"text":200,"correct":29},"不接受任何可能影响其独立判断的报酬",{"key":27,"text":202,"correct":22},"寻求符合可持续发展原则的解决方案",{"key":31,"text":204,"correct":29},"只承担能够胜任的任务",{"key":34,"text":206,"correct":22},"在任何时候，维护咨询业的尊严、地位和荣誉","CE",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":222,"analysis":37},1104691,"国际上的工程咨询公司也可以作为()来联合承包工程。",[212,214,216,218,220],{"key":20,"text":213,"correct":22},"总承包商与施工企业合作",{"key":24,"text":215,"correct":22},"BOT项目的发起人与其他公司合作",{"key":27,"text":217,"correct":22},"联合体中的一方",{"key":31,"text":219,"correct":29},"分包商承担设计工作",{"key":34,"text":221,"correct":29},"分包商承担施工管理工作","ABC",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":237,"analysis":37},1104695,"从CM 模式的特点来看，其适用情况主要包括()。",[227,229,231,233,235],{"key":20,"text":228,"correct":29},"规模小、技术简单的建设工程",{"key":24,"text":230,"correct":22},"设计变更可能性较大的建设工程",{"key":27,"text":232,"correct":22},"时间因素最为重要的建设工程",{"key":31,"text":234,"correct":29},"因质量和功能要求高而可能突破投资目标的建设工程",{"key":34,"text":236,"correct":22},"因总的范围和规模不确定而无法准确定价的建设工程","BCE",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":252,"analysis":37},1104696,"关于Partnering 模式下Partnering 协议的说法，正确的有()。",[242,244,246,248,250],{"key":20,"text":243,"correct":22},"Partnering协议由工程参与各方共同签署",{"key":24,"text":245,"correct":29},"Partnering协议的参与者须一次性到位",{"key":27,"text":247,"correct":29},"Partnering协议应由业主起草",{"key":31,"text":249,"correct":22},"Partnering协议与工程合同是完全不同的文件",{"key":34,"text":251,"correct":29},"Partnering模式提出后须立即签订Partnering协议","AD",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":148,"analysis":37},1104697,"关于Partnering 协议的说法，正确的有()。",[257,259,261,263,265],{"key":20,"text":258,"correct":29},"Partnering协议由业主与施工单位双方签署",{"key":24,"text":260,"correct":22},"Partnering协议签订时间可能迟于提出Partnering模式的时间",{"key":27,"text":262,"correct":29},"Partnering协议应采用标准、统一的格式",{"key":31,"text":264,"correct":22},"Partnering协议不是法律意义上的合同",{"key":34,"text":266,"correct":29},"Partnering协议通常由施工单位作为起草方",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":281,"analysis":37},1104701,"国际工程中，工程咨询公司主要为业主提供()服务。",[271,273,275,277,279],{"key":20,"text":272,"correct":29},"技术咨询",{"key":24,"text":274,"correct":22},"材料设备采购",{"key":27,"text":276,"correct":29},"合同咨询和索赔",{"key":31,"text":278,"correct":22},"生产准备、调试验收",{"key":34,"text":280,"correct":22},"工程招标","BDE",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":237,"analysis":37},1104702,"下列属于FIDIC道德准则中公平的内容有()。",[286,287,289,291,293],{"key":20,"text":202,"correct":29},{"key":24,"text":288,"correct":22},"在提供职业咨询、评审或决策时公平地提供专业建议、判断或决定",{"key":27,"text":290,"correct":22},"为客户服务过程中可能产生的一切潜在的利益冲突，都应告知客户",{"key":31,"text":292,"correct":29},"在任何情况下，始终维护咨询业的尊严、地位和荣誉",{"key":34,"text":200,"correct":22},{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":308,"analysis":37},1104703,"下列各要素中，属于Partnering模式要素的有()。",[298,300,302,304,306],{"key":20,"text":299,"correct":29},"临时协议",{"key":24,"text":301,"correct":22},"信任",{"key":27,"text":303,"correct":22},"共同的目标",{"key":31,"text":305,"correct":22},"合作",{"key":34,"text":307,"correct":29},"高层管理的参与","BCD",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":281,"analysis":37},1104704,"下列各种工程中，适合采用CM管理模式的有()。",[313,315,317,319,321],{"key":20,"text":314,"correct":29},"限额投资的工程",{"key":24,"text":316,"correct":22},"因总的范围和规模不确定而无法准确确定造价的建设工程",{"key":27,"text":318,"correct":29},"一般性建设的工程",{"key":31,"text":320,"correct":22},"设计变更可能性较大的工程",{"key":34,"text":322,"correct":22},"时间因素最为重要的工程",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":163,"analysis":37},1104705,"Partnering模式中，共享工程项目实施所产生的无形效益包括()。",[327,329,331,333,335],{"key":20,"text":328,"correct":29},"费用降低",{"key":24,"text":330,"correct":29},"质量提高",{"key":27,"text":332,"correct":22},"工作积极性提高",{"key":31,"text":334,"correct":22},"承包单位社会信誉提高",{"key":34,"text":336,"correct":22},"避免争议和诉讼的产生",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":94,"analysis":37},1104706,"工程咨询公司为承包商提供服务有()。",[341,343,345,347,349],{"key":20,"text":342,"correct":22},"为承包商提供工程设计服务",{"key":24,"text":344,"correct":29},"承担基本设计",{"key":27,"text":346,"correct":22},"为承包商提供技术咨询服务",{"key":31,"text":348,"correct":29},"承担投标设计",{"key":34,"text":350,"correct":22},"为承包商提供合同咨询和索赔服务",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":365,"analysis":37},1104707,"工程咨询公司参与联合承包工程的形式有()。",[355,357,359,361,363],{"key":20,"text":356,"correct":22},"工程咨询公司与土木工程承包商和设备制造商组成联合体",{"key":24,"text":358,"correct":22},"工程咨询公司作为总承包商，承包商作为分包商",{"key":27,"text":360,"correct":29},"承包商作为总承包商，工程咨询公司作为分包商",{"key":31,"text":362,"correct":22},"工程咨询公司作为BOT项目的发起人和策划公司",{"key":34,"text":364,"correct":22},"工程咨询公司参与BOT项目","ABDE",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":163,"analysis":37},1104708,"工程咨询公司为承包商服务主要有为承包商提供()。",[370,372,374,376,378],{"key":20,"text":371,"correct":29},"施工阶段全过程服务",{"key":24,"text":373,"correct":29},"全方位目标控制服务",{"key":27,"text":375,"correct":22},"合同咨询和索赔服务",{"key":31,"text":377,"correct":22},"技术咨询服务",{"key":34,"text":379,"correct":22},"工程设计服务",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":192,"analysis":37},1104709,"Project Controlling与项目管理服务的主要不同之处有()。",[384,386,388,390,392],{"key":20,"text":385,"correct":29},"两者的工作属性不同",{"key":24,"text":387,"correct":22},"两者的地位不同",{"key":27,"text":389,"correct":22},"两者的工作内容不同",{"key":31,"text":391,"correct":22},"两者的权力不同",{"key":34,"text":393,"correct":22},"两者的服务时间不尽相同",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":237,"analysis":37},1104710,"下列关于非代理型CM模式的表述中，正确的是()。",[398,400,402,404,406],{"key":20,"text":399,"correct":29},"CM单位对设计单位有指令权",{"key":24,"text":401,"correct":22},"业主可能与少数施工单位和材料、设备供应单位签订合同",{"key":27,"text":403,"correct":22},"CM单位在设计阶段就参与工程实施",{"key":31,"text":405,"correct":29},"CM单位与施工单位之间是总分包关系",{"key":34,"text":407,"correct":22},"GMP的具体数额是CM合同谈判中的焦点和难点",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":422,"analysis":37},1104711,"下列建设工程组织管理模式中，不能独立存在的有()。",[412,414,416,418,420],{"key":20,"text":413,"correct":29},"总承包模式",{"key":24,"text":415,"correct":29},"EPC模式",{"key":27,"text":417,"correct":29},"CM模式",{"key":31,"text":419,"correct":22},"Partnering模式",{"key":34,"text":421,"correct":22},"ProjectControlling模式","DE",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":94,"analysis":37},1104712,"工程咨询公司为承包商提供的服务有（ ）。",[427,428,430,431,433],{"key":20,"text":379,"correct":22},{"key":24,"text":429,"correct":29},"基本设计服务",{"key":27,"text":377,"correct":22},{"key":31,"text":432,"correct":29},"投标设计服务",{"key":34,"text":375,"correct":22},{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":109,"analysis":37},1104713,"Partnering模式的适用情况有（ ）。",[438,440,442,444,446],{"key":20,"text":439,"correct":22},"业主长期有投资活动的建设工程",{"key":24,"text":441,"correct":22},"不宜采用公开招标或邀请招标的建设工程",{"key":27,"text":443,"correct":22},"复杂的不确定因素较多的建设工程",{"key":31,"text":445,"correct":22},"国际金融组织贷款的建设工程",{"key":34,"text":447,"correct":29},"采用公开招标的建设工程",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":308,"analysis":37},1104714,"（2020年真题）国际工程咨询公司为承包商提供咨询服务时，可提供的服务内容有（ ）。",[452,454,455,456,457],{"key":20,"text":453,"correct":29},"工程保险服务",{"key":24,"text":375,"correct":22},{"key":27,"text":377,"correct":22},{"key":31,"text":379,"correct":22},{"key":34,"text":458,"correct":29},"工程勘察服务",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":365,"analysis":37},1104715,"（2020年真题）成功运用Partnering模式所不可缺少的要素有（ ）。",[463,465,466,468,469],{"key":20,"text":464,"correct":22},"长期协议",{"key":24,"text":301,"correct":22},{"key":27,"text":467,"correct":29},"责任分解",{"key":31,"text":305,"correct":22},{"key":34,"text":470,"correct":22},"共同目标",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":36,"analysis":37},1104725,"下列建设工程风险事件中，属于技术风险的有（ ）。",[475,477,479,481,483],{"key":20,"text":476,"correct":22},"设计规范应用不当",{"key":24,"text":478,"correct":22},"施工方案不合理",{"key":27,"text":480,"correct":29},"合同条款有遗漏",{"key":31,"text":482,"correct":29},"施工设备供应不足",{"key":34,"text":484,"correct":22},"施工安全措施不当",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":237,"analysis":37},1104726,"对每一个建设工程的风险都从头开始识别，该做法的缺点有()。",[489,491,493,495,497],{"key":20,"text":490,"correct":29},"不利于专业风险识别人员积累经验",{"key":24,"text":492,"correct":22},"耗费时间和精力，风险识别工作效率低",{"key":27,"text":494,"correct":22},"可能导致风险识别的随意性",{"key":31,"text":496,"correct":29},"不利于按时间维对建设工程风险进行分解",{"key":34,"text":498,"correct":22},"不便积累风险识别的成果资料",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":36,"analysis":37},1104733,"下列风险管理工作中，属于风险分析与评价工作内容的有()。",[503,505,507,509,511],{"key":20,"text":504,"correct":22},"确定单一风险因素发生的概率",{"key":24,"text":506,"correct":22},"分析单一风险因素的影响范围大小",{"key":27,"text":508,"correct":29},"分析各风险因素之间相关性的大小",{"key":31,"text":510,"correct":29},"分析各个风险因素最适宜的管理措施",{"key":34,"text":512,"correct":22},"分析各个风险因素的结果",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":109,"analysis":37},1104734,"采用工程保险方式转移工程风险时，需要考虑的内容有()。",[517,519,521,523,525],{"key":20,"text":518,"correct":22},"保险安排方式",{"key":24,"text":520,"correct":22},"保险类型选择",{"key":27,"text":522,"correct":22},"保险人选择",{"key":31,"text":524,"correct":22},"保险合同谈判",{"key":34,"text":526,"correct":29},"保险索赔报告",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":541,"analysis":37},1104735,"与其他的风险对策相比，非保险转移风险对策的优点主要体现在()。",[531,533,535,537,539],{"key":20,"text":532,"correct":22},"可以转移某些不可投保的潜在损失",{"key":24,"text":534,"correct":29},"双方当事人对合同条款的理解不会发生分歧",{"key":27,"text":536,"correct":22},"被转移者有能力更好地进行损失控制",{"key":31,"text":538,"correct":29},"可以中断风险源，使其不发生或不再发展",{"key":34,"text":540,"correct":29},"可以降低损失的发生概率或降低损失的严重程度","AC",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":252,"analysis":37},1104736,"关于计划性风险自留的说法，正确的有()。",[546,548,550,552,554],{"key":20,"text":547,"correct":22},"计划性风险自留是有计划的选择",{"key":24,"text":549,"correct":29},"风险自留一般单独运用效果较好",{"key":27,"text":551,"correct":29},"应保证重大风险已有对策后才使用",{"key":31,"text":553,"correct":22},"在风险管理人员正确识别和评价风险后使用",{"key":34,"text":555,"correct":29},"通常采用外部控制措施来化解风险",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":570,"analysis":37},1104737,"关于风险跟踪检查与报告的说法，正确的有()。",[560,562,564,566,568],{"key":20,"text":561,"correct":22},"跟踪风险控制措施的效果是风险监控的主要内容",{"key":24,"text":563,"correct":22},"应定期将跟踪结果编制成风险跟踪报告",{"key":27,"text":565,"correct":22},"风险跟踪过程中发现新的风险因素时应进行重新估计",{"key":31,"text":567,"correct":29},"风险跟踪报告内容的详细程度应根据掌握的资料确定",{"key":34,"text":569,"correct":22},"编制和提交风险跟踪报告是风险管理的一项日常工作","ABCE",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":585,"analysis":37},1104740,"下列内容中，属于工程设计评估报告内容的有()。",[575,577,579,581,583],{"key":20,"text":576,"correct":22},"设计任务的完成情况",{"key":24,"text":578,"correct":29},"各专业计划的衔接情况",{"key":27,"text":580,"correct":29},"出图节点与总体计划的符合情况",{"key":31,"text":582,"correct":22},"有关部门审查意见的落实情况",{"key":34,"text":584,"correct":22},"设计深度与设计标准的符合情况","ADE",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":109,"analysis":37},1104741,"工程设计阶段，工程监理单位协助建设单位报审工程设计文件时，需要开展的工作内容有()。",[590,592,594,596,598],{"key":20,"text":591,"correct":22},"了解政府对设计文件的审核程序、报审条件等信息",{"key":24,"text":593,"correct":22},"向相关部门咨询、获得相关部门的咨询意见",{"key":27,"text":595,"correct":22},"事前检查设计文件及附件的完整性、合理性",{"key":31,"text":597,"correct":22},"联系相关政府部门，及时向建设单位反馈审批意见",{"key":34,"text":599,"correct":29},"协助设计单位落实政府有关部门的审批意见",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":94,"analysis":37},1104745,"下列选项中，属于全过程集成化管理服务内容的有()。",[604,606,608,610,612],{"key":20,"text":605,"correct":22},"组织设计单位进行工程设计方案的技术经济分析和优化",{"key":24,"text":607,"correct":29},"组织建设单位组织工程监理、施工、材料设备采购招标",{"key":27,"text":609,"correct":22},"协助建设单位组织工程竣工验收",{"key":31,"text":611,"correct":29},"组织建设单位编制工程竣工决算报告",{"key":34,"text":613,"correct":22},"组织工程勘察设计招标",{"id":615,"libraryId":5,"type":15,"typeLabel":16,"stem":616,"options":617,"answer":281,"analysis":37},1104746,"下列选项中，有关全过程集成化项目管理服务模式的表述正确的有()。",[618,620,622,624,626],{"key":20,"text":619,"correct":29},"目前在我国，全过程集成化项目管理服务可归纳为咨询式、一体化、植入式和混合式四种模式",{"key":24,"text":621,"correct":22},"项目管理团队具有较强的独立性",{"key":27,"text":623,"correct":29},"采用一体化服务模式时，工程项目管理单位必须设立专门的项目管理团队",{"key":31,"text":625,"correct":22},"采用植入式服务模式时，项目管理团队具有项目管理和职能管理的双重功能",{"key":34,"text":627,"correct":22},"工程项目管理单位不设立专门的项目管理团队，而将大部分项目管理人员分别派到建设单位各职能部门中，与建设单位项目管理人员融合在一起",{"id":629,"libraryId":5,"type":15,"typeLabel":16,"stem":630,"options":631,"answer":642,"analysis":37},1104747,"工程勘察设计任务书应包括的内容有()。",[632,634,636,638,640],{"key":20,"text":633,"correct":22},"工程勘察设计范围",{"key":24,"text":635,"correct":22},"建设工程目标和建设标准",{"key":27,"text":637,"correct":29},"勘察设计费用涵盖的范围",{"key":31,"text":639,"correct":22},"对工程勘察设计成果的要求",{"key":34,"text":641,"correct":29},"勘察设计单位配合其他工程参建单位的义务","ABD",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":222,"analysis":37},1104748,"下列选项中，属于损失控制计划系统中灾难计划应满足的要求有()。",[647,649,651,653,655],{"key":20,"text":648,"correct":22},"安全撤离现场人员方案",{"key":24,"text":650,"correct":22},"援救及处理伤亡人员方案",{"key":27,"text":652,"correct":22},"控制事故发展和减少资产损害措施",{"key":31,"text":654,"correct":29},"调整施工进度计划方案",{"key":34,"text":656,"correct":29},"调整材料和设备采购计划方案",{"id":658,"libraryId":5,"type":15,"typeLabel":16,"stem":659,"options":660,"answer":671,"analysis":37},1104749,"下列选项中，风险的分析与评价应采用()相结合的方法来进行，这二者之间并不是相互排斥的，而是相互补充的。",[661,663,665,667,669],{"key":20,"text":662,"correct":22},"定性",{"key":24,"text":664,"correct":22},"定量",{"key":27,"text":666,"correct":29},"定时",{"key":31,"text":668,"correct":29},"定质",{"key":34,"text":670,"correct":29},"定期","AB",{"id":673,"libraryId":5,"type":15,"typeLabel":16,"stem":674,"options":675,"answer":94,"analysis":37},1104750,"下列选项中，属于非保险转移缺点的有()。",[676,678,680,682,684],{"key":20,"text":677,"correct":22},"可能因合同条款有歧义而导致转移失效",{"key":24,"text":679,"correct":29},"机会成本大",{"key":27,"text":681,"correct":22},"有时转移代价可能超过实际损失",{"key":31,"text":683,"correct":29},"可能因转移者心理麻痹而导致实际损失增加",{"key":34,"text":685,"correct":22},"可能因被转移者无力承担实际发生的重大损失而导致仍然由转移者来承担损失",{"id":687,"libraryId":5,"type":15,"typeLabel":16,"stem":688,"options":689,"answer":570,"analysis":37},1104751,"下列选项中．按照风险来源进行划分，风险因素包括()。",[690,692,694,696,698],{"key":20,"text":691,"correct":22},"法律风险",{"key":24,"text":693,"correct":22},"社会风险",{"key":27,"text":695,"correct":22},"经济风险",{"key":31,"text":697,"correct":29},"责任风险",{"key":34,"text":699,"correct":22},"自然风险",{"id":701,"libraryId":5,"type":15,"typeLabel":16,"stem":702,"options":703,"answer":365,"analysis":37},1104752,"下列选项中，属于建设工程风险识别的具体方法有()。",[704,706,708,710,712],{"key":20,"text":705,"correct":22},"经验数据法",{"key":24,"text":707,"correct":22},"风险调查法",{"key":27,"text":709,"correct":29},"专家咨询法",{"key":31,"text":711,"correct":22},"财务报表法",{"key":34,"text":713,"correct":22},"初始清单法",{"id":715,"libraryId":5,"type":15,"typeLabel":16,"stem":716,"options":717,"answer":50,"analysis":37},1104753,"下列选项中，属于风险管理主要环节的有()。",[718,720,722,724,726],{"key":20,"text":719,"correct":22},"风险识别",{"key":24,"text":721,"correct":29},"验收",{"key":27,"text":723,"correct":22},"风险分析与评价",{"key":31,"text":725,"correct":22},"风险对策的决策",{"key":34,"text":727,"correct":22},"风险对策实施的监控",[729,733,736,739,742,745],{"id":730,"name":731,"category":7,"favorite":732},1,"领导干部任职前廉政法规知识测试题",92,{"id":734,"name":735,"category":7,"favorite":730},595,"建筑结构与设备",{"id":737,"name":738,"category":7,"favorite":730},715,"招标采购专业知识与法律法规",{"id":740,"name":741,"category":7,"favorite":730},848,"市政方向-通用基础",{"id":743,"name":744,"category":7,"favorite":8},534,"BIM工程师",{"id":746,"name":744,"category":7,"favorite":8},535]