[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-30":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":733},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,30,50,2341,[13,38,53,68,83,98,113,128,140,151,166,181,196,211,226,240,255,269,283,297,311,325,339,353,367,381,395,409,424,438,453,467,481,495,510,524,538,553,567,579,593,607,621,635,649,663,677,691,705,719],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1104458,2,"多选题","根据《建设工程监理规范》GB\u002FT 50319-2013，各方主体通用表包括（ ）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","工作联系单",true,{"key":24,"text":25,"correct":22},"B","工程变更单",{"key":27,"text":28,"correct":22},"C","索赔意向通知书",{"key":30,"text":31,"correct":32},"D","报验.报审表",false,{"key":34,"text":35,"correct":32},"E","工程开工报审表","ABC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1104459,"下列监理文件资料中，需要建设单位审批同意的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":32},"工程开工令",{"key":24,"text":45,"correct":32},"工程暂停令",{"key":27,"text":47,"correct":22},"费用索赔报审表",{"key":30,"text":49,"correct":32},"单位工程竣工验收报审表",{"key":34,"text":51,"correct":22},"工程临时或最终延期报审表","CE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1104460,"下列文件资料中，属于建设工程监理文件资料的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":32},"设备采购合同",{"key":24,"text":60,"correct":22},"工程监理合同",{"key":27,"text":62,"correct":32},"施工承包合同",{"key":30,"text":64,"correct":32},"材料采购合同",{"key":34,"text":66,"correct":22},"材料报验文件","BE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1104461,"根据《建设工程监理规范》，监理日志应包括的内容有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"旁站情况",{"key":24,"text":75,"correct":32},"工地会议记录",{"key":27,"text":77,"correct":22},"巡视情况",{"key":30,"text":79,"correct":32},"存在问题及处理",{"key":34,"text":81,"correct":22},"平行检验情况","ACE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1104462,"根据《建设工程监理规范》，工程质量评估报告包括的内容有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"工程参建单位情况",{"key":24,"text":90,"correct":22},"工程质量验收情况",{"key":27,"text":92,"correct":32},"专项施工方案评审情况",{"key":30,"text":94,"correct":22},"竣工资料审查情况",{"key":34,"text":96,"correct":32},"工程质量安全事故处理情况","ABD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1104463,"项目监理机构应签发《监理通知单》的情形有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":32},"未按审查通过的工程设计文件施工的",{"key":24,"text":105,"correct":32},"未经批准擅自组织施工的",{"key":27,"text":107,"correct":22},"在工程质量方面存在违规行为的",{"key":30,"text":109,"correct":22},"在工程进度方面存在违规行为的",{"key":34,"text":111,"correct":22},"使用不合格的工程材料的","CDE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},1104464,"根据《建设工程监理规范》GB\u002FT 50319-2013，关于监理基本表式的表述中，正确的有（ ）。 A.工程监理单位用表（B类表）共有12个 B.施工组织设计或（专项）施工方案报审表（表 B.0.1）均不需要建设单位审批 C.监理通知回复单（表",[117,119,121,123,125],{"key":20,"text":118,"correct":32},"0.9）一般可由原发出《监理通知单》的专业监理工程师核查签认，重大问题可由总监核查签认",{"key":24,"text":120,"correct":32},"工程临时或最终延期报审表（表",{"key":27,"text":122,"correct":22},"0.14）由总监理工程师签发，签发前应征得建设单位批准同意",{"key":30,"text":124,"correct":22},"分包单位资格报审表（表",{"key":34,"text":126,"correct":32},"0.4）由施工单位报送监理单位，专业监理工程师签署意见即可","CD",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":52,"analysis":37},1104465,"建设工程监理表格体系中，属于承包单位用表的有（ ）。",[132,133,135,137,139],{"key":20,"text":45,"correct":32},{"key":24,"text":134,"correct":32},"监理报告",{"key":27,"text":136,"correct":22},"工程款支付报审表",{"key":30,"text":138,"correct":32},"工程款支付证书",{"key":34,"text":35,"correct":22},{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":150,"analysis":37},1104466,"根据《建设工程监理规范》（GB\u002FT 50319-2013），需要由总监理工程师签字并加盖执业印章的表式有（ ）。",[144,146,147,148,149],{"key":20,"text":145,"correct":32},"旁站记录",{"key":24,"text":49,"correct":22},{"key":27,"text":47,"correct":22},{"key":30,"text":136,"correct":22},{"key":34,"text":134,"correct":32},"BCD",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":165,"analysis":37},1104467,"下列工作内容中，属于建设工程监理文件资料管理的有（ ）。",[155,157,159,161,163],{"key":20,"text":156,"correct":22},"收发文与登记",{"key":24,"text":158,"correct":32},"文件起草与修改",{"key":27,"text":160,"correct":22},"文件传阅",{"key":30,"text":162,"correct":22},"文件分类存放",{"key":34,"text":164,"correct":22},"文件组卷归档","ACDE",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":180,"analysis":37},1104468,"下列选项中，属于项目监理机构文件资料管理基本职责的有（ ）。",[170,172,174,176,178],{"key":20,"text":171,"correct":22},"建立和完善监理文件资料管理制度，宜设专人管理监理文件资料",{"key":24,"text":173,"correct":22},"及时.准确.完整地收集.整理.编制.传递监理文件资料，宜采用信息技术进行监理文件资料管理",{"key":27,"text":175,"correct":22},"及时整理.分类汇总监理文件资料，并按规定组卷，形成监理档案",{"key":30,"text":177,"correct":32},"文件资料的内容必须真实.准确，与工程实际相符",{"key":34,"text":179,"correct":22},"根据工程特点和有关规定，保存监理档案，并应向有关单位.部门移交需要存档的监理文件资料","ABCE",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":195,"analysis":37},1104469,"建设工程监理文件资料发文时，都应进行分类编码，并在发文登记上进行登记，登记内容包括（ ）。",[185,187,189,191,193],{"key":20,"text":186,"correct":22},"文件资料的分类编码",{"key":24,"text":188,"correct":22},"接收文件的单位（部门）名称",{"key":27,"text":190,"correct":32},"文件编号以及收文日期",{"key":30,"text":192,"correct":22},"摘要信息",{"key":34,"text":194,"correct":22},"发文日期","ABDE",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":210,"analysis":37},1104470,"下列对建设工程监理文件资料组卷归档的要求中，属于编制要求的有（ ）。",[200,202,204,206,208],{"key":20,"text":201,"correct":22},"符合国家有关的技术规范.标准和规程",{"key":24,"text":203,"correct":32},"同一文件的印本与定稿，按印本在前.定稿在后的手续排列",{"key":27,"text":205,"correct":32},"案卷不宜过厚，一般不超过40㎜",{"key":30,"text":207,"correct":22},"内容真实.准确，与工程实际相符",{"key":34,"text":209,"correct":22},"应采用耐久性强的书写材料","ADE",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":225,"analysis":37},1104471,"下列选项中，能够反映建设工程三大目标之间统一关系的有（ ）。",[215,217,219,221,223],{"key":20,"text":216,"correct":32},"为了提高建设工程的质量，就要投入较多的资金和花费较长的建设时间",{"key":24,"text":218,"correct":22},"适当提高建设工程功能要求和质量标准，能够节约工程项目动用后的运行费和维修费",{"key":27,"text":220,"correct":22},"制定科学合理的建设工程进度计划，不但可以缩短建设工期，而且有可能获得较好的工程质量和降低工程造价",{"key":30,"text":222,"correct":32},"如果要抢时间.争进度，以极短的时间完成建设工程，势必会增加投资或者使工程质量下降",{"key":34,"text":224,"correct":22},"适当增加投资数量，缩短工期，使工程项目尽早动用，投资尽早收回","BCE",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":97,"analysis":37},1104472,"下列关于建设工程目标控制技术措施的表述中，正确的有（ ）。",[230,232,234,236,238],{"key":20,"text":231,"correct":22},"需要对各种技术数据进行审核.比较",{"key":24,"text":233,"correct":22},"需要对施工组织设计进行审查.论证",{"key":27,"text":235,"correct":32},"技术措施必须与经济措施结合使用才能取得好的效果",{"key":30,"text":237,"correct":22},"需要采用工程网络计划技术.信息化技术等实施动态控制",{"key":34,"text":239,"correct":32},"技术措施是其他各类措施的前提",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":254,"analysis":37},1104474,"根据《建设工程监理规范》（GB\u002FT 50319-2013），总监理工程师应及时签发《工程暂停令》的有（ ）。",[244,246,248,250,252],{"key":20,"text":245,"correct":22},"施工单位违反工程建设强制性标准的",{"key":24,"text":247,"correct":22},"建设单位要求暂停施工且工程需要暂停施工的",{"key":27,"text":249,"correct":22},"施工存在重大质量.安全事故隐患的",{"key":30,"text":251,"correct":22},"施工单位未按审查通过的工程设计文件施工的",{"key":34,"text":253,"correct":32},"施工单位未按审查通过的施工方案施工的","ABCD",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":165,"analysis":37},1104475,"在建设工程施工阶段，监理机构应收集的信息包括（ ）。",[259,261,263,265,267],{"key":20,"text":260,"correct":22},"索赔处理程序信息",{"key":24,"text":262,"correct":32},"设计进度计划信息",{"key":27,"text":264,"correct":22},"工程材料质量证明资料信息",{"key":30,"text":266,"correct":22},"分包单位资格信息",{"key":34,"text":268,"correct":22},"事故处理程序信息",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":195,"analysis":37},1104476,"设计信息分发制度时，需要考虑的因素有（ ）。",[273,275,277,279,281],{"key":20,"text":274,"correct":22},"了解信息使用部门和人员的使用目的.使用周期.使用频率.获得时间及信息的安全要求",{"key":24,"text":276,"correct":22},"决定信息分发的内容.数量.范围.数据来源",{"key":27,"text":278,"correct":32},"同一工程按照质量.造价.进度.合同等类别组织，各类信息再进一步根据具体情况进行细化",{"key":30,"text":280,"correct":22},"决定分发信息的数据结构.类型.精度和格式",{"key":34,"text":282,"correct":22},"决定提供信息的介质",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":127,"analysis":37},1104477,"项目监理机构的工作效率在很大程度上取决于人际关系的协调，总监理工程师在进行项目监理机构内部人际关系的协调时，可从（ ）等方面进行。",[287,289,291,293,295],{"key":20,"text":288,"correct":32},"部门职能划分",{"key":24,"text":290,"correct":32},"监理设备调配",{"key":27,"text":292,"correct":22},"工作职责委任",{"key":30,"text":294,"correct":22},"人员使用安排",{"key":34,"text":296,"correct":32},"信息沟通制度",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":165,"analysis":37},1104478,"下列组织协调工作中，属于项目监理机构内部组织关系协调内容的有（ ）。",[301,303,305,307,309],{"key":20,"text":302,"correct":22},"及时消除工作中的矛盾或冲突",{"key":24,"text":304,"correct":32},"尊重建设单位，让建设单位一起投入工程建设全过程",{"key":27,"text":306,"correct":22},"明确规定每个部门的目标，职责和权限，最好以规章制度形式作出明确规定",{"key":30,"text":308,"correct":22},"建立信息沟通制度",{"key":34,"text":310,"correct":22},"事先约定各个部门在工作中的相互关系",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":36,"analysis":37},1104479,"总监理工程师应对项目监理机构内的每一个岗位，都要明确岗位目标和责任，使（ ）。",[315,317,319,321,323],{"key":20,"text":316,"correct":22},"管理职能不重不漏",{"key":24,"text":318,"correct":22},"事事有人管",{"key":27,"text":320,"correct":22},"人人有专责",{"key":30,"text":322,"correct":32},"人员能力互补",{"key":34,"text":324,"correct":32},"人员性格互补",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":254,"analysis":37},1104480,"项目监理结构对监理单位内部检测设备需求进行协调平衡时应注意的内容有（ ）。",[329,331,333,335,337],{"key":20,"text":330,"correct":22},"规格的明确性",{"key":24,"text":332,"correct":22},"数量的准确性",{"key":27,"text":334,"correct":22},"质量的规定性",{"key":30,"text":336,"correct":22},"期限的及时性",{"key":34,"text":338,"correct":32},"使用的规范性",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":82,"analysis":37},1104481,"项目监理机构实施组织协调的常用方法有（ ）。",[343,345,347,349,351],{"key":20,"text":344,"correct":22},"会议协调",{"key":24,"text":346,"correct":32},"行政协调",{"key":27,"text":348,"correct":22},"交谈协调",{"key":30,"text":350,"correct":32},"指令协调",{"key":34,"text":352,"correct":22},"书面协调",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":165,"analysis":37},1104482,"下列内容中，属于项目监理机构施工阶段质量控制工作的有（ ）。",[357,359,361,363,365],{"key":20,"text":358,"correct":22},"协助处理工程质量事故",{"key":24,"text":360,"correct":32},"协助建设单位进行反索赔",{"key":27,"text":362,"correct":22},"检查工程材料质量",{"key":30,"text":364,"correct":22},"协助建设单位做好施工现场准备工作",{"key":34,"text":366,"correct":22},"组织工程预验收",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":380,"analysis":37},1104483,"为完成施工阶段质量控制任务，项目监理机构需要做好的工作有（ ）。",[371,372,374,376,378],{"key":20,"text":360,"correct":32},{"key":24,"text":373,"correct":22},"审查施工组织设计",{"key":27,"text":375,"correct":32},"严格控制工程变更，力求减少工程变更费用",{"key":30,"text":377,"correct":22},"控制施工工艺过程质量",{"key":34,"text":379,"correct":22},"审核工程竣工图","BDE",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":195,"analysis":37},1104484,"下列选项中，属于项目监理机构施工阶段进度控制任务的有（ ）。",[385,387,389,391,393],{"key":20,"text":386,"correct":22},"做好工程延期审批工作",{"key":24,"text":388,"correct":22},"完善建设工程控制性施工进度计划",{"key":27,"text":390,"correct":32},"力求减少工程变更费用",{"key":30,"text":392,"correct":22},"研究制定预防工期索赔的措施",{"key":34,"text":394,"correct":22},"跟踪检查实际施工进度",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":150,"analysis":37},1104485,"建设工程三大目标控制的组织措施包括（ ）。",[399,401,403,405,407],{"key":20,"text":400,"correct":32},"确定建设工程发包组织管理模式",{"key":24,"text":402,"correct":22},"明确目标控制人员的任务和职责分工",{"key":27,"text":404,"correct":22},"建立健全实施动态控制的组织机构.规章制度和人员",{"key":30,"text":406,"correct":22},"改善目标控制工作流程",{"key":34,"text":408,"correct":32},"在整个建设工程实施过程中，采用信息化技术实施动态控制",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":423,"analysis":37},1104486,"下列有关项目监理机构审查专项施工方案的表述，正确的有（ ）。",[413,415,417,419,421],{"key":20,"text":414,"correct":32},"对达到一定规模的分部分项工程，施工单位需要编制专项施工方案",{"key":24,"text":416,"correct":22},"专项施工方案审查的基本内容包括编审程序应符合相关规定",{"key":27,"text":418,"correct":22},"专项施工方案审查的基本内容包括安全技术措施应符合工程建设强制性标准",{"key":30,"text":420,"correct":32},"对超过一定规模的危险性较大的分部分项工程，施工单位需要编制专项施工方案，编制完成后直接报项目监理机构审批",{"key":34,"text":422,"correct":32},"专项施工方案应由监理单位技术负责人审批","BC",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":82,"analysis":37},1104487,"监理人员在巡视检查时，应主要关注施工质量、安全生产两个方面的情况，其中安全生产方面的检查内容包括（ ）。",[428,430,432,434,436],{"key":20,"text":429,"correct":22},"危险性较大分部分项工程施工情况",{"key":24,"text":431,"correct":32},"天气情况是否适合施工作业",{"key":27,"text":433,"correct":22},"施工现场存在的事故隐患，以及按照项目监理机构的指令整改实施情况",{"key":30,"text":435,"correct":32},"使用的工程材料.设备和构配件是否已检测合格",{"key":34,"text":437,"correct":22},"大型起重机械和自升式架设设施运行情况",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":452,"analysis":37},1104488,"下列关于项目监理机构巡视的表述中，正确的有（ ）。",[442,444,446,448,450],{"key":20,"text":443,"correct":32},"总监理工程师应根据施工组织设计对监理人员进行巡视交底",{"key":24,"text":445,"correct":22},"总监理工程师进行巡视交底时应明确巡视检查要点.巡视频率",{"key":27,"text":447,"correct":22},"总监理工程师应督促监理人员按照监理规划及监理实施细则的要求开展现场巡视检查",{"key":30,"text":449,"correct":22},"总监理工程师应检查监理人员的巡视工作成果",{"key":34,"text":451,"correct":22},"监理人员的巡视检查应主要关注施工质量和安全生产","BCDE",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":195,"analysis":37},1104489,"建筑信息建模（BIM）技术的基本特点有（ ）。",[457,459,461,463,465],{"key":20,"text":458,"correct":22},"协调性",{"key":24,"text":460,"correct":22},"模拟性",{"key":27,"text":462,"correct":32},"经济性",{"key":30,"text":464,"correct":22},"优化性",{"key":34,"text":466,"correct":22},"可出图性",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":112,"analysis":37},1104490,"建设工程信息管理系统的功能有（ ）。",[471,473,475,477,479],{"key":20,"text":472,"correct":32},"实现监理信息的及时收集和可靠存储",{"key":24,"text":474,"correct":32},"实现监理信息收集的标准化.结构化",{"key":27,"text":476,"correct":22},"提供预测.决策所需要的信息及分析模型",{"key":30,"text":478,"correct":22},"提供建设工程目标动态控制的分析报告",{"key":34,"text":480,"correct":22},"提供解决建设工程监理问题的多个备选方案",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":423,"analysis":37},1104491,"下列有关建设工程监理规划编写要求的表述中，正确的有（ ）。",[485,487,489,491,493],{"key":20,"text":486,"correct":32},"监理规划的具体内容应当格式化.标准化",{"key":24,"text":488,"correct":22},"监理规划的内容应当具有可操作性",{"key":27,"text":490,"correct":22},"监理规划可能随着工程进展进行不断的补充.修改和完善",{"key":30,"text":492,"correct":32},"监理规划的编制不必考虑建设单位的意见",{"key":34,"text":494,"correct":32},"监理规划应当在收到中标通知书后即由监理单位技术负责人组织编制",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":509,"analysis":37},1104492,"下列制度中，属于项目监理机构内部工作制作的有（ ）。",[499,501,503,505,507],{"key":20,"text":500,"correct":32},"施工备忘录签发制度",{"key":24,"text":502,"correct":32},"施工组织设计审核制度",{"key":27,"text":504,"correct":32},"工程变更处理制度",{"key":30,"text":506,"correct":22},"监理工作日志制度",{"key":34,"text":508,"correct":22},"监理业绩考核制度","DE",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":127,"analysis":37},1104493,"在进行工程造价控制的过程中，下列属于监理单位对工程造价控制技术措施的有（ ）。",[514,516,518,520,522],{"key":20,"text":515,"correct":32},"及时进行计划费用与实际费用的分析比较",{"key":24,"text":517,"correct":32},"减少施工单位的索赔，正确处理索赔事宜",{"key":27,"text":519,"correct":22},"对材料.设备采购，通过质量价格比选，合理确定生产供应单位",{"key":30,"text":521,"correct":22},"通过审核施工组织设计和施工方案，使施工组织合理化",{"key":34,"text":523,"correct":32},"落实工程造价控制责任",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":509,"analysis":37},1104494,"下列工程造价控制内容中，属于工程造价动态比较内容的有（ ）。",[528,530,532,534,536],{"key":20,"text":529,"correct":32},"工程造价控制计划的编制",{"key":24,"text":531,"correct":32},"工程造价控制计划的审核",{"key":27,"text":533,"correct":32},"工程造价偏差的纠正",{"key":30,"text":535,"correct":22},"工程造价目标值的预测分析",{"key":34,"text":537,"correct":22},"工程造价目标分解值与实际值的比较",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":552,"analysis":37},1104495,"项目监理机构审查施工承包人提交的施工组织设计时，重点审查（ ）与工程建设强制性标准的符合性。",[542,544,546,548,550],{"key":20,"text":543,"correct":22},"质量安全技术措施",{"key":24,"text":545,"correct":32},"工期安排",{"key":27,"text":547,"correct":32},"进度措施",{"key":30,"text":549,"correct":32},"拟投入的资源安排",{"key":34,"text":551,"correct":22},"专项施工方案","AE",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":82,"analysis":37},1104496,"监理规划的主要内容之一是工程进度控制，监理规划中应明确的工程进度控制措施有（ ）。",[557,559,561,563,565],{"key":20,"text":558,"correct":22},"建立多级网络计划体系",{"key":24,"text":560,"correct":32},"严格审核施工组织设计",{"key":27,"text":562,"correct":22},"建立进度控制协调制度",{"key":30,"text":564,"correct":32},"按施工合同及时支付工程款",{"key":34,"text":566,"correct":22},"监控施工单位实施作业计划",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":52,"analysis":37},1104497,"在监理规划中，工程进度控制的技术措施有（ ）。",[571,573,574,575,577],{"key":20,"text":572,"correct":32},"落实进度控制的责任",{"key":24,"text":562,"correct":32},{"key":27,"text":558,"correct":22},{"key":30,"text":576,"correct":32},"对工期提前者实行奖励",{"key":34,"text":578,"correct":22},"监控施工单位的实施作业计划",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":150,"analysis":37},1104498,"监理规划中应明确的安全生产管理的监理方法和措施有（ ）。",[583,585,587,589,591],{"key":20,"text":584,"correct":32},"组织验收施工起重机械的安全性能",{"key":24,"text":586,"correct":22},"督促施工单位落实安全技术措施",{"key":27,"text":588,"correct":22},"审查施工单位的安全生产规章制度",{"key":30,"text":590,"correct":22},"督促施工单位落实应急救援预案",{"key":34,"text":592,"correct":32},"制定危险性较大的分部工程旁站方案",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":52,"analysis":37},1104499,"下列组织协调方法中，属于交谈协调方法的有（ ）。",[597,599,601,603,605],{"key":20,"text":598,"correct":32},"走访",{"key":24,"text":600,"correct":32},"专题会议",{"key":27,"text":602,"correct":22},"电话",{"key":30,"text":604,"correct":32},"通知书",{"key":34,"text":606,"correct":22},"网络",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":180,"analysis":37},1104500,"监理单位技术负责人审核监理规划时，对项目监理机构的审核包括组织机构方面和人员配备方面，其中属于人员配备方面审核内容的有（ ）。",[611,613,615,617,619],{"key":20,"text":612,"correct":22},"派驻监理人员的专业满足程度",{"key":24,"text":614,"correct":22},"人员数量的满足程度",{"key":27,"text":616,"correct":22},"专业人员不足时采取的措施是否恰当",{"key":30,"text":618,"correct":32},"人员年龄的满足程度",{"key":34,"text":620,"correct":22},"派驻现场人员计划表",{"id":622,"libraryId":5,"type":15,"typeLabel":16,"stem":623,"options":624,"answer":180,"analysis":37},1104501,"以下各项中，属于监理规划基本构成内容的有（ ）。",[625,627,629,631,633],{"key":20,"text":626,"correct":22},"项目监理组织及人员岗位职责",{"key":24,"text":628,"correct":22},"工程质量.造价.进度控制",{"key":27,"text":630,"correct":22},"安全生产管理的监理工作",{"key":30,"text":632,"correct":32},"建设工程监理难点.重点及合理化建议",{"key":34,"text":634,"correct":22},"监理工作制度",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":254,"analysis":37},1104502,"下列可以作为建设工程监理规划编写依据的有（ ）。",[639,641,643,645,647],{"key":20,"text":640,"correct":22},"工程招投标情况",{"key":24,"text":642,"correct":22},"建设单位的合理要求",{"key":27,"text":644,"correct":22},"建设工程监理合同",{"key":30,"text":646,"correct":22},"经批准的可行性研究报告",{"key":34,"text":648,"correct":32},"监理实施细则",{"id":650,"libraryId":5,"type":15,"typeLabel":16,"stem":651,"options":652,"answer":165,"analysis":37},1104503,"下列关于监理规划编写要求的说法中，正确的有（ ）。",[653,655,657,659,661],{"key":20,"text":654,"correct":22},"监理规划应由总监理工程师组织编制",{"key":24,"text":656,"correct":32},"基本构成内容应当基本统一",{"key":27,"text":658,"correct":22},"监理规划可能随着建设工程的展开进行不断的补充.修改和完善",{"key":30,"text":660,"correct":22},"监理规划应在召开第一次工地会议7天前报建设单位",{"key":34,"text":662,"correct":22},"监理规划经审核批准后方可实施",{"id":664,"libraryId":5,"type":15,"typeLabel":16,"stem":665,"options":666,"answer":36,"analysis":37},1104505,"监理单位技术负责人审核监理规划时，主要审核（ ）。",[667,669,671,673,675],{"key":20,"text":668,"correct":22},"监理范围.工作内容及监理目标",{"key":24,"text":670,"correct":22},"项目监理机构",{"key":27,"text":672,"correct":22},"工作计划",{"key":30,"text":674,"correct":32},"项目监理机构是否有保证监理目标实现的充分依据",{"key":34,"text":676,"correct":32},"监理工作计划是否符合国家强制性标准",{"id":678,"libraryId":5,"type":15,"typeLabel":16,"stem":679,"options":680,"answer":452,"analysis":37},1104506,"监理规划审核内容中，对安全生产管理监理工作内容的审核包括（ ）。",[681,683,685,687,689],{"key":20,"text":682,"correct":32},"在工程进展中各个阶段的工作实施计划是否合理.可行",{"key":24,"text":684,"correct":22},"审核安全生产管理的监理工作内容是否明确",{"key":27,"text":686,"correct":22},"是否建立了对现场安全隐患的巡视检查制度",{"key":30,"text":688,"correct":22},"是否制定了相应的安全生产管理实施细则",{"key":34,"text":690,"correct":22},"是否建立了对施工组织设计.专项施工方案的审查制度",{"id":692,"libraryId":5,"type":15,"typeLabel":16,"stem":693,"options":694,"answer":112,"analysis":37},1104507,"下列工作流程中，监理工作涉及的有（ ）。",[695,697,699,701,703],{"key":20,"text":696,"correct":32},"分包单位招标选择流程",{"key":24,"text":698,"correct":32},"质量三检制度落实流程",{"key":27,"text":700,"correct":22},"隐蔽工程验收流程",{"key":30,"text":702,"correct":22},"质量问题处理审核流程",{"key":34,"text":704,"correct":22},"开工审核工作流程",{"id":706,"libraryId":5,"type":15,"typeLabel":16,"stem":707,"options":708,"answer":180,"analysis":37},1104508,"监理实施细则的内容之一是监理工作方法与措施，根据措施实施内容不同，可将监理工作措施分为（ ）。",[709,711,713,715,717],{"key":20,"text":710,"correct":22},"技术措施",{"key":24,"text":712,"correct":22},"经济措施",{"key":27,"text":714,"correct":22},"组织措施",{"key":30,"text":716,"correct":32},"事前控制措施",{"key":34,"text":718,"correct":22},"合同措施",{"id":720,"libraryId":5,"type":15,"typeLabel":16,"stem":721,"options":722,"answer":180,"analysis":37},1104509,"监理实施细则中，监理工程师的监理工作方法有（ ）。",[723,725,727,729,731],{"key":20,"text":724,"correct":22},"旁站",{"key":24,"text":726,"correct":22},"巡视",{"key":27,"text":728,"correct":22},"见证取样",{"key":30,"text":730,"correct":32},"试验",{"key":34,"text":732,"correct":22},"平行检测",[734,738,741,744,747,750],{"id":735,"name":736,"category":7,"favorite":737},1,"领导干部任职前廉政法规知识测试题",92,{"id":739,"name":740,"category":7,"favorite":735},595,"建筑结构与设备",{"id":742,"name":743,"category":7,"favorite":735},715,"招标采购专业知识与法律法规",{"id":745,"name":746,"category":7,"favorite":735},848,"市政方向-通用基础",{"id":748,"name":749,"category":7,"favorite":8},534,"BIM工程师",{"id":751,"name":749,"category":7,"favorite":8},535]