[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":600},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,3,50,2341,[13,34,46,58,70,82,94,106,118,130,142,154,166,177,189,201,210,222,234,246,258,270,282,294,306,318,330,339,351,363,375,387,399,410,420,429,441,453,465,477,487,499,511,523,535,544,556,565,576,588],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1102815,1,"单选题","下列选项中，属于三大目标控制措施中合同措施的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","调整控制人员的分工",false,{"key":24,"text":25,"correct":26},"B","动态跟踪合同执行情况及处理好工程索赔",true,{"key":28,"text":29,"correct":22},"C","要求施工单位增加施工机械，并给予合理的补偿",{"key":31,"text":32,"correct":22},"D","修改技术方案","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1102816,"关于项目监理机构和施工单位协调的说法，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"总监理工程师可以提出或接受任何变通办法以解决问题",{"key":24,"text":41,"correct":26},"总监理工程师应设计合理的奖罚机制协调进度和质量问题",{"key":28,"text":43,"correct":22},"施工单位采用不当方法施工时，监理工程师应立即签发停工令",{"key":31,"text":45,"correct":22},"分包合同履行中发生的索赔，应由分包单位根据总承包合同进行索赔",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1102817,"无论内部协调还是外部协调，（ ）使用频率是相当高的。",[50,52,54,56],{"key":20,"text":51,"correct":22},"书面协调法",{"key":24,"text":53,"correct":26},"交谈协调法",{"key":28,"text":55,"correct":22},"通报协调法",{"key":31,"text":57,"correct":22},"内部协调法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1102818,"关于第一次工地会议的说法，正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"第一次工地会议应由总监理工程师组织召开",{"key":24,"text":65,"correct":22},"第一次工地会议应在总监理工程师下达开工令后召开",{"key":28,"text":67,"correct":22},"第一次工地会议的会议纪要由建设单位负责整理",{"key":31,"text":69,"correct":26},"第一次工地会议总监理工程师应介绍监理规划等相关内容",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1102819,"专项施工方案应由（ ）组织编制。",[74,76,78,80],{"key":20,"text":75,"correct":26},"施工项目经理",{"key":24,"text":77,"correct":22},"施工单位技术负责人",{"key":28,"text":79,"correct":22},"施工项目负责人",{"key":31,"text":81,"correct":22},"施工单位负责人",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1102820,"根据《建设工程监理规范》（GB\u002FT 50319-2013），项目监理机构应审查施工单位报审的专项施工方案，符合要求的，应由总监理工程师签认后报（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"政府主管部门",{"key":24,"text":89,"correct":26},"建设单位",{"key":28,"text":91,"correct":22},"安全生产监督机构",{"key":31,"text":93,"correct":22},"工程监理单位",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1102821,"下列选项中属于项目决策阶段需要收集的信息的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"与建设工程相关的市场方面的信息",{"key":24,"text":101,"correct":22},"工程项目可行性研究报告及前期相关文件资料",{"key":28,"text":103,"correct":22},"同类工程相关资料",{"key":31,"text":105,"correct":22},"拟建工程所在地信息",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1102822,"下列反映建设工程三大目标之间对立关系的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"提高项目功能，能够减少运行费和维修费",{"key":24,"text":113,"correct":22},"缩短建设工期，能提早发挥投资效益",{"key":28,"text":115,"correct":22},"提高工程质量标准，能够节约工程项目动用后的运行费",{"key":31,"text":117,"correct":26},"减少工程投资，可能会降低项目功能",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1102823,"建设工程质量、造价和进度三大目标之间的关系中，反映统一关系的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"对工程质量有较高要求，就需要投入较多资金",{"key":24,"text":125,"correct":22},"要在较短时间内完成建设工程，势必会增加建设投资",{"key":28,"text":127,"correct":22},"要减少投资和节约费用，就可能会降低建设工程功能",{"key":31,"text":129,"correct":26},"提高建设工程质量标准，会降低建设工程运行费用",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1102824,"在分析论证建设工程总目标，寻求建设工程质量、造价和进度三大目标间最佳匹配关系时，应确保（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"进度目标符合建设工程合同工期",{"key":24,"text":137,"correct":26},"质量目标符合工程建设强制性标准",{"key":28,"text":139,"correct":22},"造价目标符合工程项目融资计划",{"key":31,"text":141,"correct":22},"进度.质量和造价目标均达到最优",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1102825,"关于建设工程质量、造价、进度三大目标的说法，正确的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"工程项目质量.造价.进度目标应以定性分析为主，定量分析为辅",{"key":24,"text":149,"correct":26},"建设工程三大目标中，应确保工程质量目标符合工程建设强制性标准",{"key":28,"text":151,"correct":22},"分析论证建设工程三大目标的匹配性时应以同等权重对待",{"key":31,"text":153,"correct":22},"建设工程三大目标的实现是指实现工程项目“质量优，投资省”的目标",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1102826,"下列属于建设工程目标控制经济措施的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"明确各级目标控制人员的任务和职责分工",{"key":24,"text":161,"correct":22},"对多个不同的施工方案进行技术可行性分析",{"key":28,"text":163,"correct":22},"动态跟踪合同执行情况及处理好工程索赔等",{"key":31,"text":165,"correct":26},"投资偏差分析",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1102827,"暂停施工事件发生时，（ ）应会同有关各方按施工合同约定，处理因工程暂停引起的与工期、费用有关的问题。",[170,172,174,176],{"key":20,"text":171,"correct":22},"专业监理工程师",{"key":24,"text":173,"correct":26},"总监理工程师",{"key":28,"text":175,"correct":22},"总监理工程师代表",{"key":31,"text":89,"correct":22},{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":20,"analysis":33},1102828,"工程监理人员的搭配要注意能力互补和性格互补，这体现了（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":26},"人员安排上要量才录用",{"key":24,"text":184,"correct":22},"工作委任上要职责分明",{"key":28,"text":186,"correct":22},"绩效评价上要实事求是",{"key":31,"text":188,"correct":22},"矛盾调解上要恰到好处",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":31,"analysis":33},1102829,"下列协调工作中，属于项目监理机构内部人际关系协调工作的是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"事先约定各个部门在工作中的相互关系",{"key":24,"text":196,"correct":22},"建立信息沟通制度",{"key":28,"text":198,"correct":22},"平衡监理人员使用计划",{"key":31,"text":200,"correct":26},"委任工作职责分明",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":20,"analysis":33},1102830,"下列项目监理机构内部协调工作中，属于内部组织关系协调的是（ ）。",[205,207,208,209],{"key":20,"text":206,"correct":26},"信息沟通上要建立制度",{"key":24,"text":184,"correct":22},{"key":28,"text":188,"correct":22},{"key":31,"text":186,"correct":22},{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},1102831,"关于旁站的说法，错误的是（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"旁站记录是监理工程师依法行使有关签字权的重要依据",{"key":24,"text":217,"correct":26},"旁站是建设工程监理工作中用以监督工程目标实现的重要手段",{"key":28,"text":219,"correct":22},"旁站应在总监理工程师的指导下由现场监理人员负责具体实施",{"key":31,"text":221,"correct":22},"工程竣工验收后，工程监理单位应当将旁站记录存档备查",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":28,"analysis":33},1102832,"根据《建设工程监理规范》，旁站是指项目监理机构对施工现场（ ）进行的监督活动。",[226,228,230,232],{"key":20,"text":227,"correct":22},"危险性较大的分部工程施工质量",{"key":24,"text":229,"correct":22},"危险性较大的分部工程施工安全",{"key":28,"text":231,"correct":26},"关键部位或关键工序施工质量",{"key":31,"text":233,"correct":22},"关键部位或关键工序施工安全",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},1102833,"（ ）是指项目监理机构监理人员对施工现场进行定期或不定期的检查活动。",[238,240,242,244],{"key":20,"text":239,"correct":22},"平行检验",{"key":24,"text":241,"correct":26},"巡视",{"key":28,"text":243,"correct":22},"旁站",{"key":31,"text":245,"correct":22},"见证取样",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":31,"analysis":33},1102834,"关于项目监理机构巡视工作的说法，正确的是（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":22},"监理规划中应明确巡视要点和巡视措施",{"key":24,"text":253,"correct":22},"巡视检查内容以施工质量和进度检查为主",{"key":28,"text":255,"correct":22},"对巡视检查中发现的问题应报告总监理工程师解决",{"key":31,"text":257,"correct":26},"总监理工程师应检查监理人员巡视的工作成果",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},1102835,"关于平行检验的说法中，正确的是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":26},"平行检验是项目监理机构控制施工质量的工作之一",{"key":24,"text":265,"correct":22},"平行检验是指对工程材料的检验",{"key":28,"text":267,"correct":22},"平行检验人员应根据施工单位验收情况填写检验结论",{"key":31,"text":269,"correct":22},"平行检验是指项目监理机构对施工单位自检结论的核验",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":20,"analysis":33},1102836,"监理人员实施旁站时，发现施工企业有违反工程建设强制性标准行为时，应当（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":26},"责令施工企业立即整改",{"key":24,"text":277,"correct":22},"向施工企业项目经理报告",{"key":28,"text":279,"correct":22},"向建设单位驻工地代表报告",{"key":31,"text":281,"correct":22},"向建设行政主管部门报告",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},1102837,"关于见证取样的说法，正确的是（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":26},"项目监理机构应制定见证取样送检工作制度",{"key":24,"text":289,"correct":22},"计量认证分为国家级.省级和市级，实施的效力均完全一致",{"key":28,"text":291,"correct":22},"见证取样涉及建设方.施工方.监理方和检测方四方行为主体",{"key":31,"text":293,"correct":22},"检测单位需见证施工单位和项目管理机构的现场试样抽取",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":24,"analysis":33},1102838,"关于见证取样的说法，错误的是（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"见证取样涉及的三方是指施工方.见证方和试验方",{"key":24,"text":301,"correct":26},"计量认证分为国家级.省级和县级三个等级",{"key":28,"text":303,"correct":22},"检测单位接受检验任务时须有送检单位的检验委托单",{"key":31,"text":305,"correct":22},"检测单位应在检验报告上加盖“见证取样送检”印章",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":24,"analysis":33},1102839,"工程监理信息系统的作用之一是利用计算机（ ），快速提供高质量的决策支持信息和备选方案。",[310,312,314,316],{"key":20,"text":311,"correct":22},"数据处理功能",{"key":24,"text":313,"correct":26},"分析运算功能",{"key":28,"text":315,"correct":22},"网络技术",{"key":31,"text":317,"correct":22},"虚拟现实技术",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":24,"analysis":33},1102840,"应用BIM技术对建筑物进行可视化展示、协调、模拟、优化后，还可输出有关图纸或报告，这体现了BIM技术具有（ ）的特点。",[322,324,326,328],{"key":20,"text":323,"correct":22},"可视化",{"key":24,"text":325,"correct":26},"可出图性",{"key":28,"text":327,"correct":22},"优化性",{"key":31,"text":329,"correct":22},"模拟性",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},1102841,"在工程设计阶段，可应用BIM技术协调解决施工过程中建筑物内设施的碰撞问题，这体现了BIM的（ ）。",[334,335,337,338],{"key":20,"text":323,"correct":22},{"key":24,"text":336,"correct":26},"协调性",{"key":28,"text":329,"correct":22},{"key":31,"text":327,"correct":22},{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":20,"analysis":33},1102842,"对于工程项目而言，工程实际造价超出工程预算的原因之一是（ ）。",[343,345,347,349],{"key":20,"text":344,"correct":26},"缺乏可靠的成本数据",{"key":24,"text":346,"correct":22},"项目管理要求高",{"key":28,"text":348,"correct":22},"设计图纸的标准高",{"key":31,"text":350,"correct":22},"设计选用新材料.新技术",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":20,"analysis":33},1102843,"关于监理规划的说法中，正确的是（ ）。",[355,357,359,361],{"key":20,"text":356,"correct":26},"监理规划应把握工程项目运行脉搏",{"key":24,"text":358,"correct":22},"监理规划不需要建设单位确认",{"key":28,"text":360,"correct":22},"监理规划经总监理工程师批准后即可实施",{"key":31,"text":362,"correct":22},"监理规划经批准后不得变更",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":24,"analysis":33},1102844,"下列工作制度中，仅属于相关服务工作制度的是（ ）。",[367,369,371,373],{"key":20,"text":368,"correct":22},"设计交底制度",{"key":24,"text":370,"correct":26},"设计方案评审制度",{"key":28,"text":372,"correct":22},"设计变更处理制度",{"key":31,"text":374,"correct":22},"施工图纸会审制度",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":31,"analysis":33},1102845,"下列监理工程师对质量控制的措施中，属于技术措施的是（ ）。",[379,381,383,385],{"key":20,"text":380,"correct":22},"落实质量控制责任",{"key":24,"text":382,"correct":22},"制定质量控制协调程序",{"key":28,"text":384,"correct":22},"严格质量控制工作流程",{"key":31,"text":386,"correct":26},"协助完善质量保证体系",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":28,"analysis":33},1102846,"下列属于工程造价控制经济措施的是（ ）。",[391,393,395,397],{"key":20,"text":392,"correct":22},"通过审核施工组织设计和施工方案，使施工组织合理化",{"key":24,"text":394,"correct":22},"确保资金的及时供应",{"key":28,"text":396,"correct":26},"及时进行计划费用与实际费用的分析比较",{"key":31,"text":398,"correct":22},"建立多级网络计划体系",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":20,"analysis":33},1102847,"编制专项施工方案时，实行施工总承包的工程，其专项施工方案由（ ）组织编制。",[403,405,407,408],{"key":20,"text":404,"correct":26},"总承包施工单位",{"key":24,"text":406,"correct":22},"分包单位",{"key":28,"text":89,"correct":22},{"key":31,"text":409,"correct":22},"监理单位",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":28,"analysis":33},1102848,"根据《建设工程监理规范》GB\u002FT 50319-2013，监理规划应在签订委托监理合同及收到设计文件后开始编制，还应经（ ）审批。",[414,415,416,418],{"key":20,"text":173,"correct":22},{"key":24,"text":175,"correct":22},{"key":28,"text":417,"correct":26},"监理单位技术负责人",{"key":31,"text":419,"correct":22},"建设单位负责人",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":28,"analysis":33},1102849,"设计文件、施工组织计划和施工方案等发生重大变化需要重新审批监理规划时，重新审批监理规划的负责人是（ ）。",[424,425,426,427],{"key":20,"text":173,"correct":22},{"key":24,"text":175,"correct":22},{"key":28,"text":417,"correct":26},{"key":31,"text":428,"correct":22},"建设行政主管部门",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":20,"analysis":33},1102850,"下列各项中，属于监理规划审核内容的是（ ）。",[433,435,437,439],{"key":20,"text":434,"correct":26},"监理范围.工作内容及监理目标的审核",{"key":24,"text":436,"correct":22},"编制依据.内容的审核",{"key":28,"text":438,"correct":22},"监理工作流程.监理工作要点的审核",{"key":31,"text":440,"correct":22},"监理工作方法和措施的审核",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":31,"analysis":33},1102851,"关于监理大纲、监理规划或监理实施细则的说法，正确的是（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":22},"监理大纲和监理规划均应依据监理合同的要求编写",{"key":24,"text":448,"correct":22},"监理规划和监理实施细则均应由监理单位技术负责人审批",{"key":28,"text":450,"correct":22},"委托监理的工程项目均应编制监理大纲.监理规划和监理实施细则",{"key":31,"text":452,"correct":26},"工程监理目标控制措施是监理大纲.监理规划和监理实施细则的必备内容",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":28,"analysis":33},1102852,"监理规划编写的依据之一是工程建设法律法规和标准，以下各项中，属于工程建设法律法规和标准的是（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"政府发展改革部门批准的立项批文",{"key":24,"text":460,"correct":22},"政府环保部门的环境保护要求",{"key":28,"text":462,"correct":26},"工程建设标准",{"key":31,"text":464,"correct":22},"政府规划部门确定的规划条件",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":20,"analysis":33},1102853,"指导项目监理机构全面开展监理工作的纲领性文件是（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":26},"监理规划",{"key":24,"text":472,"correct":22},"监理大纲",{"key":28,"text":474,"correct":22},"监理实施细则",{"key":31,"text":476,"correct":22},"监理工作总结",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":28,"analysis":33},1102855,"监理规划编制完成后，须经（ ）审批。",[481,482,484,485],{"key":20,"text":173,"correct":22},{"key":24,"text":483,"correct":22},"监理单位经营部门负责人",{"key":28,"text":417,"correct":26},{"key":31,"text":486,"correct":22},"监理单位负责人",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":31,"analysis":33},1102856,"在监理规划中，建立健全项目监理机构，完善职责分工，制定有关质量监督制度，落实质量控制责任，属于工程质量控制的（ ）措施。",[491,493,495,497],{"key":20,"text":492,"correct":22},"技术",{"key":24,"text":494,"correct":22},"经济",{"key":28,"text":496,"correct":22},"合同",{"key":31,"text":498,"correct":26},"组织",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":28,"analysis":33},1102857,"根据《建设工程监理规范》，项目监理机构应审查施工单位报送的用于工程的材料、构配件、设备的质量证明文件，并按要求对用于工程的材料进行（ ），对施工质量进行平行检验。",[503,505,507,509],{"key":20,"text":504,"correct":22},"平行检验或旁站",{"key":24,"text":506,"correct":22},"见证取样或旁站",{"key":28,"text":508,"correct":26},"见证取样.平行检验",{"key":31,"text":510,"correct":22},"平行检验和见证取样",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":28,"analysis":33},1102858,"下列监理工程师质量控制措施中，属于技术措施的是（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":22},"落实质量责任",{"key":24,"text":518,"correct":22},"制定协调程序",{"key":28,"text":520,"correct":26},"组织平行检验",{"key":31,"text":522,"correct":22},"优化信息流程",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":28,"analysis":33},1102859,"项目监理机构重点审查施工组织设计中的质量安全技术措施、专项施工方案与工程建设强制性标准的符合性，属于（ ）的工作内容。",[527,529,531,533],{"key":20,"text":528,"correct":22},"质量管理",{"key":24,"text":530,"correct":22},"进度控制",{"key":28,"text":532,"correct":26},"安全生产管理",{"key":31,"text":534,"correct":22},"合同管理",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":28,"analysis":33},1102860,"对于超过一定规模的危险性较大的分部分项工程专项方案，应当由（ ）组织召开专家论证会。",[539,540,541,543],{"key":20,"text":89,"correct":22},{"key":24,"text":409,"correct":22},{"key":28,"text":542,"correct":26},"施工单位",{"key":31,"text":428,"correct":22},{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":28,"analysis":33},1102861,"监理规划的主要内容之一是安全生产管理的监理工作，下列监理工作中，属于安全生产管理工作的是（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":22},"检查.复核施工控制测量成果及保护措施",{"key":24,"text":551,"correct":22},"对关键部位.关键工序的施工过程实施旁站",{"key":28,"text":553,"correct":26},"巡视危险性较大的分部分项工程专项施工方案实施情况",{"key":31,"text":555,"correct":22},"审查影响工程质量的计量设备的检查和检定报告",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":28,"analysis":33},1102862,"对于超过一定规模的危险性较大的分部分项工程的专项施工方案，需要由（ ）组织召开专家论证会。",[560,561,563,564],{"key":20,"text":89,"correct":22},{"key":24,"text":562,"correct":22},"设计单位",{"key":28,"text":542,"correct":26},{"key":31,"text":409,"correct":22},{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":31,"analysis":33},1102863,"根据《建设工程监理规范》GB\u002FT 50319－2013，监理工程师的常规工作方法包括（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"支付控制手段",{"key":24,"text":572,"correct":22},"监理通知",{"key":28,"text":574,"correct":22},"指令文件",{"key":31,"text":245,"correct":26},{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":28,"analysis":33},1102864,"以建筑工程预制混凝土空心管桩分项工程为例，以下各项措施中，属于工程质量事中控制措施的是（ ）。",[580,582,584,586],{"key":20,"text":581,"correct":22},"要求施工单位在桩基平面布置图上对每根桩编号",{"key":24,"text":583,"correct":22},"施工现场准备情况检查",{"key":28,"text":585,"correct":26},"确定合理的压桩程序",{"key":31,"text":587,"correct":22},"施工单位确认自检合格后提出工程验收申请，由项目监理机构进行验收",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":28,"analysis":33},1102865,"根据《建设工程监理规范》GB\u002FT50319－2013，关于监理实施细则编制的说法中，正确的是（ ）。",[592,594,596,598],{"key":20,"text":593,"correct":22},"应由总监理工程师组织编制",{"key":24,"text":595,"correct":22},"应针对所有分部分项工程编制",{"key":28,"text":597,"correct":26},"应在相应工程施工前完成编制",{"key":31,"text":599,"correct":22},"应由监理单位技术负责人组织编制",[601,604,607,610,613,616],{"id":15,"name":602,"category":7,"favorite":603},"领导干部任职前廉政法规知识测试题",92,{"id":605,"name":606,"category":7,"favorite":15},595,"建筑结构与设备",{"id":608,"name":609,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":611,"name":612,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":614,"name":615,"category":7,"favorite":8},534,"BIM工程师",{"id":617,"name":615,"category":7,"favorite":8},535]