[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-29":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":740},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,29,50,2341,[13,38,53,68,82,97,112,127,142,156,171,185,199,213,228,243,258,273,288,302,317,332,346,360,374,388,402,416,430,444,457,471,485,499,514,528,543,557,571,585,599,613,627,641,655,669,683,697,711,726],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1104407,2,"多选题","下列属于项目总经理职权的有（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","组织工程设计.施工监理.施工队伍和设备材料采购的招标工作",true,{"key":24,"text":25,"correct":22},"B","编制并组织实施项目年度投资计划.用款计划.建设进度计划",{"key":27,"text":28,"correct":29},"C","审核.上报项目初步设计和概算文件",false,{"key":31,"text":32,"correct":22},"D","组织项目后评价，提出项目后评价报告",{"key":34,"text":35,"correct":22},"E","按时向有关部门报送项目建设.生产信息和统计资料","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1104408,"下列关于建设工程监理性质的描述中，体现了科学性的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"当建设单位与施工单位发生利益冲突或者矛盾时，工程监理单位应以事实为依据，以法律和有关合同为准绳",{"key":24,"text":45,"correct":22},"工程监理单位应积累丰富的技术.经济资料和数据",{"key":27,"text":47,"correct":29},"工程监理的服务对象是建设单位，但不能完全取代建设单位的管理活动",{"key":31,"text":49,"correct":22},"工程监理单位应当由组织管理能力强.工程建设经验丰富的人员担任领导",{"key":34,"text":51,"correct":22},"应当有足够数量的.有丰富的管理经验和较强应变能力的注册监理工程师组成的骨干队伍","BDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1104409,"下列有关建设工程监理的表述中，正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"在工程建设中，工程监理人员利用自己的知识.技能和经验以及必要的试验.检测手段，为建设单位提供管理和技术服务",{"key":24,"text":60,"correct":29},"工程监理单位具有工程建设重大问题的决策权",{"key":27,"text":62,"correct":22},"工程监理单位的服务对象是建设单位",{"key":31,"text":64,"correct":29},"要求监理单位“应积累丰富的技术.经济资料和数据”，这是监理性质中“服务性”的要求",{"key":34,"text":66,"correct":22},"独立是工程监理单位公平地实施监理的基本前提","ACE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":36,"analysis":37},1104410,"自建设工程监理制度实施以来，通过颁布有关法律、行政法规、部门规章，进一步明确了（ ），逐步确立了建设工程监理的法律地位。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"工程监理单位的职责",{"key":24,"text":75,"correct":22},"建设单位委托工程监理单位的职责",{"key":27,"text":77,"correct":29},"建设单位授权工程监理单位的范围",{"key":31,"text":79,"correct":22},"工程监理人员的职责",{"key":34,"text":81,"correct":22},"强制实施监理的工程范围",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1104411,"《建设工程监理范围和规模标准规定》进一步细化了必须实行监理的工程范围和规模标准，其中，国家重点建设工程是指对国民经济和社会发展有重大影响的骨干项目，包括（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"支柱产业中的大型项目",{"key":24,"text":89,"correct":29},"基础设施中的项目",{"key":27,"text":91,"correct":22},"高科技并能带动行业技术进步的项目",{"key":31,"text":93,"correct":22},"跨地区并对全国经济发展或者区域经济发展有重大影响的项目",{"key":34,"text":95,"correct":22},"对社会发展有重大影响的项目","ACDE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1104412,"依照《建设工程质量管理条例》的规定，责令工程监理单位停止违法行为，并处合同约定的监理酬金1倍以上2倍以下罚款的情形有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"超越本单位资质等级承揽工程",{"key":24,"text":104,"correct":29},"与施工单位串通降低工程质量",{"key":27,"text":106,"correct":29},"将不合格工程按照合格签字",{"key":31,"text":108,"correct":22},"允许其他单位以本单位名义承揽工程",{"key":34,"text":110,"correct":29},"将所承揽的监理业务转让给其他单位","AD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1104413,"根据《建筑法》，工程监理人员认为工程施工不符合（ ）的，有权要求建筑施工企业改正。",[116,118,120,122,124],{"key":20,"text":117,"correct":29},"建设单位要求",{"key":24,"text":119,"correct":22},"工程设计要求",{"key":27,"text":121,"correct":22},"施工技术标准",{"key":31,"text":123,"correct":29},"施工组织结构",{"key":34,"text":125,"correct":22},"合同约定","BCE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1104414,"根据相关的法律规定，对注册监理工程师处以吊销执业资格证书，5年内不予注册处罚的情形有（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"监理工程师因过错造成重大质量事故",{"key":24,"text":134,"correct":29},"监理工程师因过错造成质量事故，情节特别恶劣",{"key":27,"text":136,"correct":22},"注册监理工程师未执行法律.法规和工程建设强制性标准，情节严重的",{"key":31,"text":138,"correct":29},"注册监理工程师未执行法律.法规和工程建设强制性标准，造成重大安全事故的",{"key":34,"text":140,"correct":29},"注册监理工程师未执行法律.法规和工程建设强制性标准，构成犯罪的","AC",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":52,"analysis":37},1104415,"根据《建设工程监理范围和规模标准规定》，利用外国政府或者国际组织贷款、援助资金的工程范围包括（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":29},"使用外商援助资金的项目",{"key":24,"text":149,"correct":22},"使用世界银行贷款资金的项目",{"key":27,"text":151,"correct":29},"使用国外银行贷款资金的项目",{"key":31,"text":153,"correct":22},"使用国外政府及其机构贷款资金的项目",{"key":34,"text":155,"correct":22},"使用亚洲开发银行贷款资金的项目",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},1104417,"下列内容中，属于FIDIC工程师职业道德准则的有（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"能力",{"key":24,"text":163,"correct":29},"科学",{"key":27,"text":165,"correct":29},"守法",{"key":31,"text":167,"correct":22},"公平",{"key":34,"text":169,"correct":22},"反腐败","ADE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":36,"analysis":37},1104418,"在国际上，工程咨询公司参与联合承包工程的形式有（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"工程咨询公司与土木工程承包商和设备制造商组成联合体",{"key":24,"text":178,"correct":22},"工程咨询公司作为总承包商，承包商作为分包商",{"key":27,"text":180,"correct":29},"承包商作为总承包商，工程咨询公司作为分包商",{"key":31,"text":182,"correct":22},"工程咨询公司可以作为BOT项目的发起人和策划公司",{"key":34,"text":184,"correct":22},"工程咨询公司参与BOT项目",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":126,"analysis":37},1104419,"以下关于非代理型CM模式的表述中，正确的有（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":29},"CM单位对设计单位有指令权",{"key":24,"text":192,"correct":22},"业主可能与少数施工单位和材料.设备供应单位签订合同",{"key":27,"text":194,"correct":22},"CM单位在设计阶段就参与工程实施",{"key":31,"text":196,"correct":29},"CM单位与施工单位之间是总分包关系",{"key":34,"text":198,"correct":22},"GMP的具体数额是CM合同谈判中的焦点和难点",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":96,"analysis":37},1104420,"下列关于非代理型CM模式的表述中，正确的有（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"CM单位只能向设计单位提出一些合理化建议，对设计单位没有指令权",{"key":24,"text":206,"correct":29},"业主与CM单位签订的合同只包括CM服务内容，不包括工程施工承包内容",{"key":27,"text":208,"correct":22},"CM单位介入工程时间较早，一般在设计阶段介入",{"key":31,"text":210,"correct":22},"GMP数额过高，会导致业主所承担的风险增大",{"key":34,"text":212,"correct":22},"GMP包括总的工程费用和CM费",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":227,"analysis":37},1104421,"Project Controlling与工程项目管理服务的主要不同之处有（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":29},"两者的工作属性不同",{"key":24,"text":220,"correct":22},"两者的地位不同",{"key":27,"text":222,"correct":22},"两者的工作内容不同",{"key":31,"text":224,"correct":22},"两者的权力不同",{"key":34,"text":226,"correct":22},"两者的服务时间不尽相同","BCDE",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":242,"analysis":37},1104422,"下列建设工程组织管理模式中，不能独立存在的有（ ）。",[232,234,236,238,240],{"key":20,"text":233,"correct":29},"总承包模式",{"key":24,"text":235,"correct":29},"EPC模式",{"key":27,"text":237,"correct":29},"CM模式",{"key":31,"text":239,"correct":22},"Partnering模式",{"key":34,"text":241,"correct":22},"Preject Controlling模式","DE",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":257,"analysis":37},1104423,"下列关于风险型CM模式的表述中，正确的有（ ）。",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"GMP低于合理值时，CM单位承担的风险就增大",{"key":24,"text":250,"correct":22},"GMP具体数额的确定是CM合同谈判的一个焦点和难点",{"key":27,"text":252,"correct":22},"签订CM合同时，合同价尚不是一个确定的具体数据，主要是确定计价原则和方式",{"key":31,"text":254,"correct":29},"CM单位与承包商是分包关系",{"key":34,"text":256,"correct":29},"CM单位介入工程时间较晚","ABC",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":272,"analysis":37},1104424,"Partnering模式中，共享工程项目实施所产生的无形效益包括（ ）。",[262,264,266,268,270],{"key":20,"text":263,"correct":29},"费用降低",{"key":24,"text":265,"correct":29},"质量提高",{"key":27,"text":267,"correct":22},"工作积极性提高",{"key":31,"text":269,"correct":22},"承包单位社会信誉提高",{"key":34,"text":271,"correct":22},"避免争议和诉讼的产生","CDE",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":287,"analysis":37},1104425,"下列风险管理工作中，属于风险分析与评价工作内容的有（ ）。",[277,279,281,283,285],{"key":20,"text":278,"correct":22},"确定单一风险因素发生的概率",{"key":24,"text":280,"correct":22},"分析单一风险因素的影响范围大小",{"key":27,"text":282,"correct":29},"分析各风险因素之间相关性的大小",{"key":31,"text":284,"correct":29},"分析各个风险因素最适宜的管理措施",{"key":34,"text":286,"correct":22},"分析各个风险因素的结果","ABE",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":242,"analysis":37},1104426,"风险等级中不可接受的风险有（ ）。",[292,294,296,298,300],{"key":20,"text":293,"correct":29},"VL",{"key":24,"text":295,"correct":29},"L",{"key":27,"text":297,"correct":29},"M",{"key":31,"text":299,"correct":22},"H",{"key":34,"text":301,"correct":22},"VH",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":316,"analysis":37},1104427,"风险的分析与评价采用（ ）相结合的方法来进行，这二者之间并不是相互排斥的，而是相互补充的。",[306,308,310,312,314],{"key":20,"text":307,"correct":22},"定性",{"key":24,"text":309,"correct":22},"定量",{"key":27,"text":311,"correct":29},"定时",{"key":31,"text":313,"correct":29},"定质",{"key":34,"text":315,"correct":29},"定期","AB",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":331,"analysis":37},1104428,"建设工程风险对策包括（ ）。",[321,323,325,327,329],{"key":20,"text":322,"correct":22},"风险回避",{"key":24,"text":324,"correct":22},"损失控制",{"key":27,"text":326,"correct":22},"风险转移",{"key":31,"text":328,"correct":22},"风险自留",{"key":34,"text":330,"correct":29},"风险监控","ABCD",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":141,"analysis":37},1104429,"一般来说，损失控制方案都应当是（ ）措施的有机结合。",[336,338,340,342,344],{"key":20,"text":337,"correct":22},"预防损失",{"key":24,"text":339,"correct":29},"遏制损失",{"key":27,"text":341,"correct":22},"减少损失",{"key":31,"text":343,"correct":29},"规避损失",{"key":34,"text":345,"correct":29},"降低损失",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":141,"analysis":37},1104430,"与其他的风险对策相比，非保险转移风险对策的优点主要体现在（ ）。",[350,352,354,356,358],{"key":20,"text":351,"correct":22},"可以转移某些不可保的潜在损失",{"key":24,"text":353,"correct":29},"双方当事人对合同条款的理解不会发生分歧",{"key":27,"text":355,"correct":22},"被转移者往往能较好地进行损失控制",{"key":31,"text":357,"correct":29},"可以中断风险源，使其不发生或不再发展",{"key":34,"text":359,"correct":29},"可以降低损失的发生概率或降低损失的严重程度",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":257,"analysis":37},1104431,"损失控制计划系统中的灾难计划，其内容应满足的要求有（ ）。",[364,366,368,370,372],{"key":20,"text":365,"correct":22},"安全撤离现场人员方案",{"key":24,"text":367,"correct":22},"援救及处理伤亡人员方案",{"key":27,"text":369,"correct":22},"控制事故发展和减少资产损害措施",{"key":31,"text":371,"correct":29},"调整施工进度计划方案",{"key":34,"text":373,"correct":29},"调整材料和设备采购计划方案",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":126,"analysis":37},1104432,"在损失控制计划系统中，应急计划是在损失基本确定后的处理计划，其应包括的内容有（ ）。",[378,380,382,384,386],{"key":20,"text":379,"correct":29},"采用多种货币组合的方式付款",{"key":24,"text":381,"correct":22},"全面审查可使用的资金情况",{"key":27,"text":383,"correct":22},"准备保险索赔依据",{"key":31,"text":385,"correct":29},"控制事故的进一步发展，最大限度地减少资产和环境损害",{"key":34,"text":387,"correct":22},"确定保险索赔的额度",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":257,"analysis":37},1104433,"PMBOK项目管理知识领域中，属于项目沟通管理的有（ ）。",[392,394,396,398,400],{"key":20,"text":393,"correct":22},"沟通管理计划",{"key":24,"text":395,"correct":22},"沟通管理",{"key":27,"text":397,"correct":22},"沟通监测",{"key":31,"text":399,"correct":29},"监测和控制项目工作",{"key":34,"text":401,"correct":29},"团队管理",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":67,"analysis":37},1104434,"以下属于PMBOK项目管理知识领域中项目集成管理的有（ ）。",[406,408,410,412,414],{"key":20,"text":407,"correct":22},"项目管理计划",{"key":24,"text":409,"correct":29},"范围核实",{"key":27,"text":411,"correct":22},"项目工作监控",{"key":31,"text":413,"correct":29},"费用估算",{"key":34,"text":415,"correct":22},"项目或阶段收尾",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":96,"analysis":37},1104435,"建设工程风险初始清单中，下列属于施工风险因素的典型风险事件的有（ ）。",[420,422,424,426,428],{"key":20,"text":421,"correct":22},"施工工艺落后",{"key":24,"text":423,"correct":29},"未考虑施工可能性",{"key":27,"text":425,"correct":22},"施工安全措施不当",{"key":31,"text":427,"correct":22},"未考虑场地情况",{"key":34,"text":429,"correct":22},"施工技术和方案不合理",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":170,"analysis":37},1104436,"概率分布中最为常用的分布形式有（ ）。",[434,436,438,440,442],{"key":20,"text":435,"correct":22},"均匀分布",{"key":24,"text":437,"correct":29},"线形分布",{"key":27,"text":439,"correct":29},"公差分布",{"key":31,"text":441,"correct":22},"三角分布",{"key":34,"text":443,"correct":22},"正态分布",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":67,"analysis":37},1104437,"下列内容中，属于非保险转移缺点的有（ ）。",[448,450,452,454,455],{"key":20,"text":449,"correct":22},"可能因合同条款有歧义而导致转移失效",{"key":24,"text":451,"correct":29},"被转移者往往无法很好地进行损失控制",{"key":27,"text":453,"correct":22},"有时转移代价可能超过实际损失",{"key":31,"text":351,"correct":29},{"key":34,"text":456,"correct":22},"可能因被转移者无力承担实际发生的重大损失而导致仍然由转移者来承担损失",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":36,"analysis":37},1104438,"下列关于保险转移和非保险转移的表述中，正确的有（ ）。",[461,463,465,467,469],{"key":20,"text":462,"correct":22},"采用固定总价合同将涨价风险转移给施工单位属于非保险转移",{"key":24,"text":464,"correct":22},"非保险转移的媒介是合同，这就可能因为双方当事人对合同条款的理解发生分歧而导致转移失败",{"key":27,"text":466,"correct":29},"保险可以转移建设工程所有风险",{"key":31,"text":468,"correct":22},"对于建设工程风险，应将保险转移与风险回避.损失控制和风险自留结合起来运用",{"key":34,"text":470,"correct":22},"保险之所以能得到越来越广泛的应用，原因在于其符合风险分担的基本原则",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":227,"analysis":37},1104439,"导致非计划性风险自留的主要原因有（ ）。",[475,477,479,481,483],{"key":20,"text":476,"correct":29},"风险意识过强",{"key":24,"text":478,"correct":22},"风险识别失误",{"key":27,"text":480,"correct":22},"风险分析与评价失误",{"key":31,"text":482,"correct":22},"风险决策延误",{"key":34,"text":484,"correct":22},"风险决策实施延误",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":96,"analysis":37},1104440,"监控风险管理计划实施过程的主要内容包括（ ）。",[489,491,493,495,497],{"key":20,"text":490,"correct":22},"评估风险控制措施产生的效果",{"key":24,"text":492,"correct":29},"重新估计风险",{"key":27,"text":494,"correct":22},"及时发现和度量新的风险因素",{"key":31,"text":496,"correct":22},"跟踪.评估风险的变化程度",{"key":34,"text":498,"correct":22},"监控潜在风险的发展.监测工程风险发生的征兆",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":513,"analysis":37},1104441,"关于风险跟踪检查与报告的说法，正确的有（ ）。",[503,505,507,509,511],{"key":20,"text":504,"correct":22},"跟踪风险控制措施的效果是风险监控的主要内容",{"key":24,"text":506,"correct":22},"应定期将跟踪结果编制成风险跟踪报告",{"key":27,"text":508,"correct":22},"风险跟踪过程中发现新的风险因素时应进行重新估计",{"key":31,"text":510,"correct":29},"风险跟踪报告内容的详细程度应依据掌握的资料确定",{"key":34,"text":512,"correct":22},"编制和提交风险跟踪报告是风险管理的一项日常工作","ABCE",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":331,"analysis":37},1104442,"采用工程保险方式转移工程风险时，需要考虑的内容有（ ）。",[518,520,522,524,526],{"key":20,"text":519,"correct":22},"保险安排方式",{"key":24,"text":521,"correct":22},"保险类型选择",{"key":27,"text":523,"correct":22},"保险人选择",{"key":31,"text":525,"correct":22},"保险合同谈判",{"key":34,"text":527,"correct":29},"保险索赔报告",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":542,"analysis":37},1104443,"关于计划性风险自留的说法，正确的有（ ）。",[532,534,536,538,540],{"key":20,"text":533,"correct":22},"计划性风险自留是有计划的选择",{"key":24,"text":535,"correct":29},"风险自留一般单独运用效果较好",{"key":27,"text":537,"correct":22},"应保证重大风险已有对策后才使用",{"key":31,"text":539,"correct":22},"在风险管理人员正确识别和评价风险后使用",{"key":34,"text":541,"correct":29},"通常采用外部控制措施来化解风险","ACD",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":513,"analysis":37},1104444,"工程勘察设计任务书中，工程勘察设计范围包括（ ）。",[547,549,551,553,555],{"key":20,"text":548,"correct":22},"工程名称",{"key":24,"text":550,"correct":22},"工程性质",{"key":27,"text":552,"correct":22},"拟建地点",{"key":31,"text":554,"correct":29},"工程勘察设计成果",{"key":34,"text":556,"correct":22},"相关政府部门对工程的限制条件",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":287,"analysis":37},1104445,"工程勘察设计任务书应包括的内容有（ ）。",[561,563,565,567,569],{"key":20,"text":562,"correct":22},"工程勘察设计范围",{"key":24,"text":564,"correct":22},"建设工程目标和建设标准",{"key":27,"text":566,"correct":29},"勘察设计合同的订立方式",{"key":31,"text":568,"correct":29},"勘察设计单位的选择方式",{"key":34,"text":570,"correct":22},"对工程勘察设计成果的要求",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":542,"analysis":37},1104446,"工程监理单位在保修阶段的服务内容有（ ）。",[575,577,579,581,583],{"key":20,"text":576,"correct":22},"进行定期回访",{"key":24,"text":578,"correct":29},"保修期相关服务结束后，应组织相关单位对工程进行全面检查",{"key":27,"text":580,"correct":22},"制定工程保修期回访计划及检查内容，报建设单位批准",{"key":31,"text":582,"correct":22},"对于非施工单位原因造成的工程质量缺陷，应核实施工单位申报的修复工程费用",{"key":34,"text":584,"correct":29},"对建设单位或使用单位提出的工程质量缺陷，工程监理单位应与使用单位.施工单位协商确定责任归属",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":331,"analysis":37},1104447,"工程设计阶段，工程监理单位协助建设单位报审工程设计文件时，需要开展的工作内容有（ ）。",[589,591,593,595,597],{"key":20,"text":590,"correct":22},"了解政府对设计文件的审批程序.报审条件等信息",{"key":24,"text":592,"correct":22},"向相关部门咨询，获得相关部门的咨询意见",{"key":27,"text":594,"correct":22},"事前检查设计文件及附件的完整性.合规性",{"key":31,"text":596,"correct":22},"联系相关政府部门，及时向建设单位反馈审批意见",{"key":34,"text":598,"correct":29},"协助设计单位落实政府有关部门的审批意见",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":36,"analysis":37},1104448,"签订工程勘察设计合同时，应注意的问题包括（ ）。",[603,605,607,609,611],{"key":20,"text":604,"correct":22},"应强调限额设计",{"key":24,"text":606,"correct":22},"应明确工程勘察设计费用涵盖的工作范围",{"key":27,"text":608,"correct":29},"按时提供勘察设计所需的基础资料",{"key":31,"text":610,"correct":22},"应界定由于地质情况变化造成的工程勘察范围变更，工程勘察设计单位的相应义务",{"key":34,"text":612,"correct":22},"应明确工程勘察设计单位配合其他工程参建单位的义务",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":331,"analysis":37},1104449,"工程监理单位对工程勘察方案审查的内容有（ ）。",[617,619,621,623,625],{"key":20,"text":618,"correct":22},"勘察工作内容是否与勘察合同及设计要求相符",{"key":24,"text":620,"correct":22},"勘察点布置是否合理",{"key":27,"text":622,"correct":22},"现场勘察组织及人员安排是否合理",{"key":31,"text":624,"correct":22},"勘察进度计划是否满足工程总进度计划要求",{"key":34,"text":626,"correct":29},"试样的数量和质量是否符合规范要求",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":331,"analysis":37},1104450,"工程设计进度计划的审查内容包括（ ）。",[631,633,635,637,639],{"key":20,"text":632,"correct":22},"相应设计人员的配置安排是否合理",{"key":24,"text":634,"correct":22},"计划中各个节点是否存在漏项",{"key":27,"text":636,"correct":22},"出图节点是否符合建设工程总体计划进度节点要求",{"key":31,"text":638,"correct":22},"各专业计划的衔接是否合理",{"key":34,"text":640,"correct":29},"设计任务书的完成情况",{"id":642,"libraryId":5,"type":15,"typeLabel":16,"stem":643,"options":644,"answer":513,"analysis":37},1104451,"实施建设工程监理与项目管理一体化，总监理工程师的职责有（ ）。",[645,647,649,651,653],{"key":20,"text":646,"correct":22},"负责确定工程监理与项目管理机构的人员分工和岗位职责",{"key":24,"text":648,"correct":22},"组织编写工程监理与项目管理计划大纲",{"key":27,"text":650,"correct":22},"负责工程监理与项目管理机构的日常工作",{"key":31,"text":652,"correct":29},"组织审查各阶段设计方案",{"key":34,"text":654,"correct":22},"组织制定和实施建设工程监理与项目管理制度",{"id":656,"libraryId":5,"type":15,"typeLabel":16,"stem":657,"options":658,"answer":331,"analysis":37},1104452,"以下各项中，属于总监理工程师职责的有（ ）。",[659,661,663,665,667],{"key":20,"text":660,"correct":22},"负责对建设工程监理与项目管理情况进行监控和指导",{"key":24,"text":662,"correct":22},"发布有关建设工程监理与项目管理指令",{"key":27,"text":664,"correct":22},"组织编写工程监理与项目管理计划大纲，并负责建设工程监理与项目管理机构的日常工作",{"key":31,"text":666,"correct":22},"组织建设工程监理与项目管理会议",{"key":34,"text":668,"correct":29},"协助建设单位组织设计交底和图纸会审会议",{"id":670,"libraryId":5,"type":15,"typeLabel":16,"stem":671,"options":672,"answer":542,"analysis":37},1104453,"工程监理与项目管理服务的区别包括（ ）。",[673,675,677,679,681],{"key":20,"text":674,"correct":22},"服务性质不同",{"key":24,"text":676,"correct":29},"服务对象不同",{"key":27,"text":678,"correct":22},"服务侧重点不同",{"key":31,"text":680,"correct":22},"服务范围不同",{"key":34,"text":682,"correct":29},"服务属性不同",{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":36,"analysis":37},1104454,"实施建设工程项目全过程集成化管理，工程监理单位的服务内容可包括（ ）。",[687,689,691,693,695],{"key":20,"text":688,"correct":22},"项目策划",{"key":24,"text":690,"correct":22},"设计管理",{"key":27,"text":692,"correct":29},"参与施工",{"key":31,"text":694,"correct":22},"招标代理",{"key":34,"text":696,"correct":22},"造价咨询",{"id":698,"libraryId":5,"type":15,"typeLabel":16,"stem":699,"options":700,"answer":272,"analysis":37},1104455,"下列关于工程项目决策与建设实施全过程集成化管理服务内容的表述中，正确的有（ ）。",[701,703,705,707,709],{"key":20,"text":702,"correct":29},"协助建设单位组织设计单位进行工程设计方案的技术经济分析和优化，审查工程概预算",{"key":24,"text":704,"correct":29},"签订工程勘察设计合同并在其实施过程中履行管理职责",{"key":27,"text":706,"correct":22},"协助建设单位编制工程竣工决算报告，参与生产试运行及工程保修期管理，组织工程项目后评估",{"key":31,"text":708,"correct":22},"协助建设单位进行工程项目策划.投资估算.融资方案设计.可行性研究.专项评估",{"key":34,"text":710,"correct":22},"协助建设单位提出工程实施用款计划，进行工程变更控制，处理工程索赔，结算工程价款",{"id":712,"libraryId":5,"type":15,"typeLabel":16,"stem":713,"options":714,"answer":725,"analysis":37},1104456,"目前在我国工程建设实践中，按照工程项目管理单位与建设单位的结合方式不同，全过程集成化项目管理服务可归纳为（ ）模式。",[715,717,719,721,723],{"key":20,"text":716,"correct":22},"咨询式",{"key":24,"text":718,"correct":22},"一体化",{"key":27,"text":720,"correct":29},"多样化",{"key":31,"text":722,"correct":22},"植入式",{"key":34,"text":724,"correct":29},"结合式","ABD",{"id":727,"libraryId":5,"type":15,"typeLabel":16,"stem":728,"options":729,"answer":513,"analysis":37},1104457,"作为工程项目管理服务单位，全过程集成化管理服务中需要注意的难点和重点包括（ ）。",[730,732,734,736,738],{"key":20,"text":731,"correct":22},"准确把握建设单位需求",{"key":24,"text":733,"correct":22},"不断加强项目团队建设",{"key":27,"text":735,"correct":22},"充分发挥沟通协调作用",{"key":31,"text":737,"correct":29},"准确把握施工单位需求",{"key":34,"text":739,"correct":22},"高度重视技术支持",[741,745,748,751,754,757],{"id":742,"name":743,"category":7,"favorite":744},1,"领导干部任职前廉政法规知识测试题",92,{"id":746,"name":747,"category":7,"favorite":742},595,"建筑结构与设备",{"id":749,"name":750,"category":7,"favorite":742},715,"招标采购专业知识与法律法规",{"id":752,"name":753,"category":7,"favorite":742},848,"市政方向-通用基础",{"id":755,"name":756,"category":7,"favorite":8},534,"BIM工程师",{"id":758,"name":756,"category":7,"favorite":8},535]