[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-28":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":581},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,28,50,2341,[13,34,46,58,68,80,92,102,114,126,138,147,156,168,180,192,204,216,228,240,249,261,273,281,289,301,309,321,333,342,350,358,366,378,390,398,409,421,432,444,452,464,476,485,494,512,527,541,556,570],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1104352,1,"单选题","建设单位招聘并培训生产人员，组织相关人员参加设备安装、调试等工作是()阶段的工作。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","建设准备",false,{"key":24,"text":25,"correct":22},"B","施工安装",{"key":27,"text":28,"correct":29},"C","生产准备",true,{"key":31,"text":32,"correct":22},"D","竣工验收","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1104354,"根据《国务院关于投资体制改革的决定》，采用直接投资的政府投资项目，除特殊情况外，不再审批（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目建议书",{"key":24,"text":41,"correct":22},"可行性研究报告",{"key":27,"text":43,"correct":22},"初步设计和概算",{"key":31,"text":45,"correct":29},"开工报告",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1104355,"办理工程质量监督手续时需提供的文件是()",[50,52,54,56],{"key":20,"text":51,"correct":22},"施工图设计文件",{"key":24,"text":53,"correct":29},"施工组织设计文件",{"key":27,"text":55,"correct":22},"监理单位质量管理体系文件",{"key":31,"text":57,"correct":22},"建筑工程用地审批文件",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1104356,"拟建项目单位向政府投资主管部门提出的要求建设某一工程项目的建议文件，并且是对工程项目建设轮廓设想的文件是（ ）。",[62,63,65,67],{"key":20,"text":41,"correct":22},{"key":24,"text":64,"correct":22},"投资项目决策管理书",{"key":27,"text":66,"correct":22},"勘察设计文件",{"key":31,"text":39,"correct":29},{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":20,"analysis":33},1104360,"根据《国务院关于投资体制改革的决定》，对于企业不使用政府资金投资建设的工程，将区别不同情况实行（ ）。",[72,74,76,78],{"key":20,"text":73,"correct":29},"核准制或登记备案制",{"key":24,"text":75,"correct":22},"公示制或登记备案制",{"key":27,"text":77,"correct":22},"听证制或公示制",{"key":31,"text":79,"correct":22},"听证制或核准制",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":27,"analysis":33},1104361,"根据《国务院关于投资体制改革的决定》，对于企业投资《政府核准的投资项目目录》以外的项目，投资决策实行的制度是（ ）。",[84,86,88,90],{"key":20,"text":85,"correct":22},"审批制",{"key":24,"text":87,"correct":22},"核准制",{"key":27,"text":89,"correct":29},"备案制",{"key":31,"text":91,"correct":22},"公示制",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":20,"analysis":33},1104362,"建设工程初步设计是根据（ ）的要求进行具体实施方案的设计。",[96,97,98,100],{"key":20,"text":41,"correct":29},{"key":24,"text":39,"correct":22},{"key":27,"text":99,"correct":22},"使用功能",{"key":31,"text":101,"correct":22},"批准的投资额",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":24,"analysis":33},1104363,"工程总承包项目经理职责不包括（ ）。",[106,108,110,112],{"key":20,"text":107,"correct":22},"代表企业组织实施工程总承包项目管理，对实现合同约定的项目目标负责",{"key":24,"text":109,"correct":29},"制订项目管理目标责任书",{"key":27,"text":111,"correct":22},"对项目实施全过程进行策划、组织、协调和控制",{"key":31,"text":113,"correct":22},"负责组织项目的管理收尾和合同收尾工作",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":31,"analysis":33},1104365,"工程总承包单位承担建设项目工程总承包，项目部的基本职能不包括（ ）。",[118,120,122,124],{"key":20,"text":119,"correct":22},"工程总承包项目组织实施和控制",{"key":24,"text":121,"correct":22},"对项目质量、安全、费用、进度、职业健康和环境保护目标负责",{"key":27,"text":123,"correct":22},"具有内外部沟通协调管理职能",{"key":31,"text":125,"correct":29},"负责对外联络",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":31,"analysis":33},1104366,"全过程工程咨询的特点不包括（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":22},"咨询服务范围广",{"key":24,"text":133,"correct":22},"强调智力性策划",{"key":27,"text":135,"correct":22},"实施多阶段集成",{"key":31,"text":137,"correct":29},"代替工程监理",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":20,"analysis":33},1104367,"根据《国务院关于投资体制改革的决定》，政府投资工程实行（）。",[142,143,144,146],{"key":20,"text":85,"correct":29},{"key":24,"text":87,"correct":22},{"key":27,"text":145,"correct":22},"登记制",{"key":31,"text":89,"correct":22},{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":20,"analysis":33},1104368,"企业投资建设《政府核准的投资项目目录》中的项目时，需向政府提交（）。",[151,153,154,155],{"key":20,"text":152,"correct":29},"项目申请报告",{"key":24,"text":39,"correct":22},{"key":27,"text":41,"correct":22},{"key":31,"text":45,"correct":22},{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":27,"analysis":33},1104369,"对于《政府核准的投资项目目录》以外的企业投资项目，一般由企业按照属地原则向（）备案。",[160,162,164,166],{"key":20,"text":161,"correct":22},"地方政府建设行政主管部门",{"key":24,"text":163,"correct":22},"上级政府建设行政主管部门",{"key":27,"text":165,"correct":29},"地方政府投资主管部门",{"key":31,"text":167,"correct":22},"上级政府投资主管部门",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":24,"analysis":33},1104370,"如果初步设计提出的总概算超过可行性研究报告总投资的（）以上或其他主要指标需要变更时，应说明原因和计算依据，并重新向原审批单位报批可行性研究报告。",[172,174,176,178],{"key":20,"text":173,"correct":22},"5%",{"key":24,"text":175,"correct":29},"10%",{"key":27,"text":177,"correct":22},"15%",{"key":31,"text":179,"correct":22},"20%",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":24,"analysis":33},1104371,"新上项目在项目建议书被批准后，应由项目的（）派代表组成项目法人筹备组，具体负责项目法人的筹建工作。",[184,186,188,190],{"key":20,"text":185,"correct":22},"监理方",{"key":24,"text":187,"correct":29},"投资方",{"key":27,"text":189,"correct":22},"设计方",{"key":31,"text":191,"correct":22},"施工方",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":31,"analysis":33},1104372,"建设单位办理质量监督注册手续时需提供的资料不包括（）。",[196,198,200,202],{"key":20,"text":197,"correct":22},"施工图设计文件审查报告和批准书",{"key":24,"text":199,"correct":22},"中标通知书和施工、监理合同",{"key":27,"text":201,"correct":22},"建设单位、施工单位和监理单位工程项目的负责人和机构组成",{"key":31,"text":203,"correct":29},"施工组织设计和监理大纲",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":27,"analysis":33},1104373,"建设工程自（）之日起进入工程质量保修期。",[208,210,212,214],{"key":20,"text":209,"correct":22},"提交竣工验收报告之日",{"key":24,"text":211,"correct":22},"竣工验收之日",{"key":27,"text":213,"correct":29},"竣工验收合格之日",{"key":31,"text":215,"correct":22},"竣工验收合格后15日",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":20,"analysis":33},1104374,"工程项目在开工建设之前，要切实做好各项准备工作不包括（）。",[220,222,224,226],{"key":20,"text":221,"correct":29},"组建生产管理机构",{"key":24,"text":223,"correct":22},"征地、拆迁和场地平整",{"key":27,"text":225,"correct":22},"准备必要的施工图纸",{"key":31,"text":227,"correct":22},"办理工程质量监督和施工许可手续",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":24,"analysis":33},1104375,"工程建设程序中设计紧后的程序是（）。",[232,234,236,238],{"key":20,"text":233,"correct":22},"策划",{"key":24,"text":235,"correct":29},"施工",{"key":27,"text":237,"correct":22},"技术设计",{"key":31,"text":239,"correct":22},"交付使用",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":27,"analysis":33},1104376,"对于采用投资补助、转贷和贷款贴息方式的政府投资工程，只审批（）。",[244,245,246,248],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":22},{"key":27,"text":247,"correct":29},"资金申请报告",{"key":31,"text":43,"correct":22},{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":31,"analysis":33},1104377,"（）是投资成果转入生产或使用的标志，也是全面考核工程建设成果、检验设计和施工质量的关键步骤。",[253,255,257,259],{"key":20,"text":254,"correct":22},"隐蔽工程验收",{"key":24,"text":256,"correct":22},"工程预验收",{"key":27,"text":258,"correct":22},"竣工结算",{"key":31,"text":260,"correct":29},"工程竣工验收",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":20,"analysis":33},1104378,"组织工程建设实施，负责控制工程投资、工期和质量属于（）职权。",[265,267,269,271],{"key":20,"text":266,"correct":29},"项目总经理",{"key":24,"text":268,"correct":22},"项目总工程师",{"key":27,"text":270,"correct":22},"项目董事会",{"key":31,"text":272,"correct":22},"总监理工程师",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},1104379,"下列选项中，不属于工程项目在开工建设之前，要切实做好各项准备工作的是()。",[277,278,279,280],{"key":20,"text":221,"correct":29},{"key":24,"text":223,"correct":22},{"key":27,"text":225,"correct":22},{"key":31,"text":227,"correct":22},{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":20,"analysis":33},1104380,"下列选项中，建设工程初步设计是根据( )的要求进行具体实施方案的设计。",[285,286,287,288],{"key":20,"text":41,"correct":29},{"key":24,"text":39,"correct":22},{"key":27,"text":99,"correct":22},{"key":31,"text":101,"correct":22},{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":27,"analysis":33},1104381,"某工程，施工单位于3月10日进入施工现场开始搭设临时设施，3月15日开始拆除旧有建筑物，3月25日开始永久性工程基础正式打桩，4月10日开始平整场地。该工程的开工时间为()。",[293,295,297,299],{"key":20,"text":294,"correct":22},"3月10日",{"key":24,"text":296,"correct":22},"3月15日",{"key":27,"text":298,"correct":29},"3月25日",{"key":31,"text":300,"correct":22},"4月10日",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":20,"analysis":33},1104382,"初步设计的目的是为了阐述在指定的地点、时间和投资控制数额内，拟建项目在技术上的可行性和经济上的合理性，初步设计的依据是（ ）。",[305,306,307,308],{"key":20,"text":41,"correct":29},{"key":24,"text":39,"correct":22},{"key":27,"text":99,"correct":22},{"key":31,"text":101,"correct":22},{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":20,"analysis":33},1104383,"在工程建设程序中，属于建设准备工作内容的是（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":29},"组织招标选择工程监理单位、施工单位及设备、材料供应商",{"key":24,"text":316,"correct":22},"组建生产管理机构，制定管理有关制度和规定",{"key":27,"text":318,"correct":22},"审查施工图设计文件",{"key":31,"text":320,"correct":22},"落实原材料、协作产品、燃料、水、电、气等的来源",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":24,"analysis":33},1104384,"根据《建设工程质量管理条例》，组织有关单位参加建设工程竣工验收的义务主体是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"施工企业",{"key":24,"text":328,"correct":29},"建设单位",{"key":27,"text":330,"correct":22},"建设行政主管部门",{"key":31,"text":332,"correct":22},"建设工程质量监督机构",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":27,"analysis":33},1104385,"与传统\"碎片化\"咨询相比，全过程工程咨询具有自己的特点，以下不属于其特点的是（ ）。",[337,338,339,341],{"key":20,"text":131,"correct":22},{"key":24,"text":133,"correct":22},{"key":27,"text":340,"correct":29},"可控性强",{"key":31,"text":135,"correct":22},{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":20,"analysis":33},1104386,"(2018年真题)根据《国务院关于投资体制改革的决定》，对于企业不使用政府资金投资建设的工程，将区别不同情况实行（ ）。",[346,347,348,349],{"key":20,"text":73,"correct":29},{"key":24,"text":75,"correct":22},{"key":27,"text":77,"correct":22},{"key":31,"text":79,"correct":22},{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":27,"analysis":33},1104387,"(2016年真题)根据《国务院关于投资体制改革的决定》，对于企业投资《政府核准的投资项目目录》以外的项目，投资决策实行的制度是（ ）。",[354,355,356,357],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":22},{"key":27,"text":89,"correct":29},{"key":31,"text":91,"correct":22},{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":27,"analysis":33},1104388,"(2011年真题)某工程，施工单位于3月10日进入施工现场开始搭设临时设施，3月15日开始拆除旧有建筑物，3月25日开始永久性工程基础正式打桩，4月10日开始平整场地。该工程的开工时间为（ ）。",[362,363,364,365],{"key":20,"text":294,"correct":22},{"key":24,"text":296,"correct":22},{"key":27,"text":298,"correct":29},{"key":31,"text":300,"correct":22},{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},1104389,"(2012年真题)关于建设程序中各阶段工作的说法，错误的是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"在初步设计或技术设计的基础上进行施工图设计，使其达到施工安装的要求",{"key":24,"text":373,"correct":29},"工程开始拆除旧建筑物和搭建临时建筑物时即可算作工程的正式开工",{"key":27,"text":375,"correct":22},"生产准备阶段是由建设阶段转入生产经营阶段的重要衔接阶段",{"key":31,"text":377,"correct":22},"竣工验收是考核建设成果、检验设计和施工质量的关键步骤",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":27,"analysis":33},1104390,"(2019年真题)对于政府投资项目，不属于可行性研究应完成的工作是（ ）",[382,384,386,388],{"key":20,"text":383,"correct":22},"进行市场研究",{"key":24,"text":385,"correct":22},"进行工艺技术方案研究",{"key":27,"text":387,"correct":29},"进行环境影响的初步评价",{"key":31,"text":389,"correct":22},"进行财务和经济分析",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},1104391,"(2019年真题)根据《国务院关于投资体制改革的决定》，民营企业投资建设《政府核准的投资项目目录》中的项目时，需向政府提交（ ）。",[394,395,396,397],{"key":20,"text":152,"correct":29},{"key":24,"text":41,"correct":22},{"key":27,"text":43,"correct":22},{"key":31,"text":45,"correct":22},{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":27,"analysis":33},1104392,"(2014年真题)根据《国务院关于投资体制改革的决定》，对于采用资本金注入方式的政府投资工程，政府需要审批（ ）",[402,404,406,407],{"key":20,"text":403,"correct":22},"资金申请报告和概算",{"key":24,"text":405,"correct":22},"开工报告和施工图预算",{"key":27,"text":43,"correct":29},{"key":31,"text":408,"correct":22},"项目建议书和开工报告",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":24,"analysis":33},1104393,"(2011年真题)根据《国务院关于投资体制改革的决定》，对于企业不使用政府资金投资建设的项目，视情况实行（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"审核制或备案制",{"key":24,"text":416,"correct":29},"核准制或备案制",{"key":27,"text":418,"correct":22},"审批制或审核制",{"key":31,"text":420,"correct":22},"核准制或审批制",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":27,"analysis":33},1104394,"(2016年真题)在建设工程勘察设计工作中，对于重大工程和技术复杂工程，可根据需要增加（ ）阶段。",[425,427,429,430],{"key":20,"text":426,"correct":22},"详细勘察",{"key":24,"text":428,"correct":22},"方案设计",{"key":27,"text":237,"correct":29},{"key":31,"text":431,"correct":22},"施工图审查",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":31,"analysis":33},1104395,"(2019年真题)建设工程新开工时间是指工程设计文件中规定的任何一项永久性工程的（ ）开始日期",[436,438,440,442],{"key":20,"text":437,"correct":22},"地质勘察",{"key":24,"text":439,"correct":22},"场地旧建筑物拆除",{"key":27,"text":441,"correct":22},"施工用临时道路施工",{"key":31,"text":443,"correct":29},"正式破土开槽",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":20,"analysis":33},1104396,"(2014年真题)建设工程初步设计是根据（ ）的要求进行具体实施方案的设计。",[448,449,450,451],{"key":20,"text":41,"correct":29},{"key":24,"text":39,"correct":22},{"key":27,"text":99,"correct":22},{"key":31,"text":101,"correct":22},{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":31,"analysis":33},1104397,"(2009年真题)如果初步设计提出的总概算超过可行性研究报告中总投资估算的10%以上，应当重新（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":22},"编制项目建议书",{"key":24,"text":459,"correct":22},"编制可行性研究报告",{"key":27,"text":461,"correct":22},"评估可行性研究报告",{"key":31,"text":463,"correct":29},"向原审批单位报批可行性研究报告",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":20,"analysis":33},1104398,"(2013年真题)下列工作中，属于建设准备阶段监理单位工作的是（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":29},"协助建设单位组织施工招标",{"key":24,"text":471,"correct":22},"编制施工组织设计",{"key":27,"text":473,"correct":22},"签订产品供货及运输协议",{"key":31,"text":475,"correct":22},"组织设计文件评审",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":27,"analysis":33},1104399,"(2010年真题)选择工程监理单位是业主在工程（ ）阶段的工作。",[480,482,483,484],{"key":20,"text":481,"correct":22},"设计",{"key":24,"text":25,"correct":22},{"key":27,"text":21,"correct":29},{"key":31,"text":28,"correct":22},{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},1104400,"（2020年真题）根据《国务院关于投资体制改革的决定》，采用贷款贴息方式的政府投资工程，政府需要从投资的角度审批（ ）。",[489,491,492,493],{"key":20,"text":490,"correct":22},"项目建设",{"key":24,"text":41,"correct":22},{"key":27,"text":43,"correct":22},{"key":31,"text":247,"correct":29},{"id":495,"libraryId":5,"type":496,"typeLabel":497,"stem":498,"options":499,"answer":511,"analysis":33},1104401,2,"多选题","下列关于工程监理相关制度的说法中，正确的有（ ）。",[500,502,504,506,508],{"key":20,"text":501,"correct":29},"项目法人责任制要求项目法人对项目的策划.资金筹措.建设实施.生产经营.债务偿还和资产的保值增值，实行全过程负责",{"key":24,"text":503,"correct":22},"项目法人责任制是实行工程监理制的基本保障",{"key":27,"text":505,"correct":29},"新上项目在项目建议书被批准后，应由项目的投资方派代表组成项目法人筹备组，具体负责项目法人的筹建工作",{"key":31,"text":507,"correct":22},"由原有企业负责建设的大中型基建项目，需设分公司或分厂的，要重新设立项目法人",{"key":509,"text":510,"correct":29},"E","提出项目开工报告属于项目董事会的职权","ACE",{"id":513,"libraryId":5,"type":496,"typeLabel":497,"stem":514,"options":515,"answer":526,"analysis":33},1104402,"对于实施项目法人责任制的项目，项目董事会的职权有（ ）。",[516,518,520,522,524],{"key":20,"text":517,"correct":29},"负责筹措建设资金",{"key":24,"text":519,"correct":22},"组织编制项目初步设计文件",{"key":27,"text":521,"correct":29},"审核项目概算文件",{"key":31,"text":523,"correct":22},"拟订生产经营计划",{"key":509,"text":525,"correct":22},"提出项目后评价报告","AC",{"id":528,"libraryId":5,"type":496,"typeLabel":497,"stem":529,"options":530,"answer":540,"analysis":33},1104403,"实行建设项目法人责任制的项目中，项目总经理的职权有（ ）。",[531,533,535,537,539],{"key":20,"text":532,"correct":22},"上报项目初步设计",{"key":24,"text":534,"correct":29},"编制和确定招标方案",{"key":27,"text":536,"correct":29},"编制项目年度投资计划",{"key":31,"text":538,"correct":22},"提出项目开工报告",{"key":509,"text":525,"correct":29},"BCE",{"id":542,"libraryId":5,"type":496,"typeLabel":497,"stem":543,"options":544,"answer":555,"analysis":33},1104404,"根据《工程建设项目招标范围和规模标准规定》，下列各项中，属于必须进行招标范围的有（ ）。",[545,547,549,551,553],{"key":20,"text":546,"correct":29},"施工单项合同估算价在400万元人民币以上的",{"key":24,"text":548,"correct":22},"施工单项合同估算价在200万元人民币以上的",{"key":27,"text":550,"correct":22},"重要设备.材料等货物的采购，单项合同估算价在100万元人民币以上的",{"key":31,"text":552,"correct":29},"重要设备.材料等货物的采购，单项合同估算价在200万元人民币以上的",{"key":509,"text":554,"correct":29},"勘察.设计.监理等服务的采购，单项合同估算价在100万元人民币以上的","ADE",{"id":557,"libraryId":5,"type":496,"typeLabel":497,"stem":558,"options":559,"answer":569,"analysis":33},1104405,"在实施建设项目法人责任制的情况下，属于项目董事会职权的有（ ）。",[560,561,563,565,567],{"key":20,"text":538,"correct":29},{"key":24,"text":562,"correct":29},"负责提出项目竣工验收申请报告",{"key":27,"text":564,"correct":22},"编制项目财务预算.决算",{"key":31,"text":566,"correct":29},"研究解决建设过程中出现的重大问题",{"key":509,"text":568,"correct":22},"组织项目后评价，提出项目后评价报告","ABD",{"id":571,"libraryId":5,"type":496,"typeLabel":497,"stem":572,"options":573,"answer":580,"analysis":33},1104406,"下列属于项目董事会职权的有（ ）。",[574,575,576,577,578],{"key":20,"text":517,"correct":29},{"key":24,"text":519,"correct":22},{"key":27,"text":562,"correct":29},{"key":31,"text":538,"correct":29},{"key":509,"text":579,"correct":22},"负责组织项目试生产和单项工程预验收","ACD",[582,585,588,591,594,597],{"id":15,"name":583,"category":7,"favorite":584},"领导干部任职前廉政法规知识测试题",92,{"id":586,"name":587,"category":7,"favorite":15},595,"建筑结构与设备",{"id":589,"name":590,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":592,"name":593,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":595,"name":596,"category":7,"favorite":8},534,"BIM工程师",{"id":598,"name":596,"category":7,"favorite":8},535]