[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":579},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,2,50,2341,[13,34,46,58,66,78,90,102,114,124,136,148,160,172,184,196,208,219,231,243,255,267,277,288,298,310,319,330,342,353,363,371,383,395,407,415,425,437,447,456,468,477,486,498,510,522,531,543,555,567],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1102765,1,"单选题","下列计划中，属于应急计划的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","现场人员安全撤离计划",false,{"key":24,"text":25,"correct":26},"B","材料与设备采购调整计划",true,{"key":28,"text":29,"correct":22},"C","伤亡人员援救及处理计划",{"key":31,"text":32,"correct":22},"D","资产和环境损害控制计划","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1102766,"以下各等级的风险中，属于可接受风险的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"VL",{"key":24,"text":41,"correct":26},"L",{"key":28,"text":43,"correct":22},"M",{"key":31,"text":45,"correct":22},"H",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1102767,"项目管理知识体系将项目管理活动归结为五个基本过程，其中跟踪、检查和调整项目进展和绩效属于（ ）的工作内容。",[50,52,54,56],{"key":20,"text":51,"correct":22},"启动过程组",{"key":24,"text":53,"correct":22},"计划过程组",{"key":28,"text":55,"correct":22},"执行过程组",{"key":31,"text":57,"correct":26},"监控过程组",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1102768,"（ ）是指跟踪、检查和调整项目进展和绩效，识别必要的计划变更并启动相应变更的一组过程。",[62,63,64,65],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":28,"text":55,"correct":22},{"key":31,"text":57,"correct":26},{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":24,"analysis":33},1102769,"PMBOK项目管理知识领域中，不属于项目风险管理的是（ ）。",[70,72,74,76],{"key":20,"text":71,"correct":22},"编制风险管理计划",{"key":24,"text":73,"correct":26},"编制人力资源计划",{"key":28,"text":75,"correct":22},"进行风险定性分析",{"key":31,"text":77,"correct":22},"编制风险应对计划",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":31,"analysis":33},1102770,"下列关于风险识别方法的说法，描述正确的是（ ）。",[82,84,86,88],{"key":20,"text":83,"correct":22},"调查打分法是风险识别的一种方法",{"key":24,"text":85,"correct":22},"流程图分析既可以分析流程图自身，也可以显示发生问题的概率",{"key":28,"text":87,"correct":22},"经验数据法可以发现初始清单所列出的风险",{"key":31,"text":89,"correct":26},"初始清单法并不是风险识别的最终结论",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":28,"analysis":33},1102771,"关于风险识别方法的说法，正确的是（ ）。",[94,96,98,100],{"key":20,"text":95,"correct":22},"流程图法不仅分析流程本身，也可显示发生问题的损失值或损失发生的概率",{"key":24,"text":97,"correct":22},"风险初始清单是项目风险管理的经验总结，可以作为项目风险识别的最终结论",{"key":28,"text":99,"correct":26},"经验数据法根据已建各类工程与风险有关的统计资料来识别拟建工程风险",{"key":31,"text":101,"correct":22},"专家调查法是从分析具体工程特点入手，对已经识别出的风险进行鉴别和确认",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":20,"analysis":33},1102772,"某投标人在招标工程开标后发现自己由于报价失误，比正常报价少报25％，虽然被确定为中标人，但拒绝与业主签订施工合同，该风险对策为（ ）。",[106,108,110,112],{"key":20,"text":107,"correct":26},"风险回避",{"key":24,"text":109,"correct":22},"损失控制",{"key":28,"text":111,"correct":22},"风险自留",{"key":31,"text":113,"correct":22},"风险转移",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":28,"analysis":33},1102773,"在涉外工程中，由于缺乏有关外汇市场的知识和信息，为避免承担由此带来的经济风险，决策者决定选择本国货币作为结算货币，从而丧失了从汇率变化中获益的可能性，这一对策为（ ）。",[118,119,121,122],{"key":20,"text":111,"correct":22},{"key":24,"text":120,"correct":22},"损失转移",{"key":28,"text":107,"correct":26},{"key":31,"text":123,"correct":22},"风险控制",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":24,"analysis":33},1102774,"关于建设工程风险跟踪检查与报告的说法中，正确的是（ ）。",[128,130,132,134],{"key":20,"text":129,"correct":22},"在风险管理进程中，如果没有出现新的风险，就不需要对风险进行重新估计",{"key":24,"text":131,"correct":26},"通常采用风险跟踪表格记录跟踪结果，然后定期将跟踪的结果制成风险跟踪报告",{"key":28,"text":133,"correct":22},"风险跟踪的结果需要定期进行报告，报告通常供高层次的决策者使用",{"key":31,"text":135,"correct":22},"编制和提交风险跟踪报告是风险管理的一项日常工作，报告的格式和频率由决策者确定",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":31,"analysis":33},1102775,"工程监理单位在工程设计阶段为建设单位提供服务时，主要服务内容是（ ）。",[140,142,144,146],{"key":20,"text":141,"correct":22},"编制工程设计任务书",{"key":24,"text":143,"correct":22},"编制工程设计方案",{"key":28,"text":145,"correct":22},"报审有关工程设计文件",{"key":31,"text":147,"correct":26},"审查工程设计成果",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":31,"analysis":33},1102776,"勘察评估报告由（ ）组织编制，必要时可邀请相关专家参加。",[152,154,156,158],{"key":20,"text":153,"correct":22},"专业监理工程师",{"key":24,"text":155,"correct":22},"建设单位代表",{"key":28,"text":157,"correct":22},"监理工程师",{"key":31,"text":159,"correct":26},"总监理工程师",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":20,"analysis":33},1102777,"工程监理单位承担工程保修阶段服务时，应按（ ）及检査内容开展工作。",[164,166,168,170],{"key":20,"text":165,"correct":26},"保修期回访计划",{"key":24,"text":167,"correct":22},"保修期监理规划",{"key":28,"text":169,"correct":22},"保修期监理实施细则",{"key":31,"text":171,"correct":22},"保修期监理工作规程",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":28,"analysis":33},1102778,"评审工程设计成果需要进行的工作有：①邀请专家参与评审；②确定专家人选；③建立评审制度和程序；④收集专家评审意见；⑤分析专家评审意见。其正确的工作步骤是（ ）。",[176,178,180,182],{"key":20,"text":177,"correct":22},"①→②→④→③→⑤",{"key":24,"text":179,"correct":22},"①→③→②→④→⑤",{"key":28,"text":181,"correct":26},"③→②→①→④→⑤",{"key":31,"text":183,"correct":22},"②→①→④→③→⑤",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":31,"analysis":33},1102779,"工程监理单位的中心任务是（ ）。",[188,190,192,194],{"key":20,"text":189,"correct":22},"质量控制",{"key":24,"text":191,"correct":22},"进度控制",{"key":28,"text":193,"correct":22},"成本控制",{"key":31,"text":195,"correct":26},"目标控制",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":31,"analysis":33},1102780,"以下各项中，不属于建设工程监理与项目管理一体化实施条件的是（ ）。",[200,202,204,206],{"key":20,"text":201,"correct":22},"建设单位的信任和支持是前提",{"key":24,"text":203,"correct":22},"建设工程监理与项目管理队伍素质是基础",{"key":28,"text":205,"correct":22},"建立健全相关制度和标准是保证",{"key":31,"text":207,"correct":26},"总监理工程师负责制是保障",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":20,"analysis":33},1102781,"在工程项目管理服务相关职责中，协助建设单位进行工程项目策划以及设计管理工作等属于（ ）的职责。",[212,214,215,217],{"key":20,"text":213,"correct":26},"规划设计部",{"key":24,"text":159,"correct":22},{"key":28,"text":216,"correct":22},"合同信息部",{"key":31,"text":218,"correct":22},"工程管理部",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":20,"analysis":33},1102782,"全过程集成化管理服务模式有多种，下图属于（ ）。",[223,225,227,229],{"key":20,"text":224,"correct":26},"独立式服务模式",{"key":24,"text":226,"correct":22},"融合式服务模式",{"key":28,"text":228,"correct":22},"植入式服务模式",{"key":31,"text":230,"correct":22},"复合式服务模式",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":24,"analysis":33},1102783,"下列关于建设工程项目全过程集成化管理的表述中，错误的是（ ）。",[235,237,239,241],{"key":20,"text":236,"correct":22},"集成化管理是指运用集成化思想，对工程建设全过程进行综合管理",{"key":24,"text":238,"correct":26},"集成化管理体现为有关知识.各个管理部门.各个进展阶段的简单叠加和简单联系",{"key":28,"text":240,"correct":22},"集成化管理服务更加强调项目策划.范围管理.综合管理",{"key":31,"text":242,"correct":22},"集成化管理更加需要组织协调.信息沟通，并能切实解决工程技术问题",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":31,"analysis":33},1102784,"下列有关全过程集成化管理服务内容的说法中，正确的是（ ）。",[247,249,251,253],{"key":20,"text":248,"correct":22},"提出工程实施用款计划",{"key":24,"text":250,"correct":22},"进行工程项目策划",{"key":28,"text":252,"correct":22},"组织工程竣工验收，办理工程竣工结算",{"key":31,"text":254,"correct":26},"组织评审工程设计方案",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":31,"analysis":33},1102785,"根据《建设工程监理规范》GB\u002FT 50319-2013，由专业监理工程师审查合格后予以签认的表是（ ）。",[259,261,263,265],{"key":20,"text":260,"correct":22},"分部工程验收报验表",{"key":24,"text":262,"correct":22},"监理通知回复单",{"key":28,"text":264,"correct":22},"施工进度计划报审表",{"key":31,"text":266,"correct":26},"施工控制测量成果报验表",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":31,"analysis":33},1102786,"施工控制测量成果报验表由（ ）审查合格后予以签认。",[271,272,274,276],{"key":20,"text":159,"correct":22},{"key":24,"text":273,"correct":22},"法定代表人",{"key":28,"text":275,"correct":22},"技术负责人",{"key":31,"text":153,"correct":26},{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":20,"analysis":33},1102787,"下列表式中，由专业监理工程师审查合格后予以签认的是（ ）。",[281,283,284,286],{"key":20,"text":282,"correct":26},"工程材料.构配件.设备报审表",{"key":24,"text":262,"correct":22},{"key":28,"text":285,"correct":22},"分包单位资格报审表",{"key":31,"text":287,"correct":22},"分部工程报验表",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":20,"analysis":33},1102788,"下列施工单位报审、报验用表中，需专业监理工程师提出审查意见后，由总监理工程师审核签认的是（ ）。",[292,293,295,296],{"key":20,"text":285,"correct":26},{"key":24,"text":294,"correct":22},"隐蔽工程报验表",{"key":28,"text":266,"correct":22},{"key":31,"text":297,"correct":22},"分项工程报验表",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1102789,"下列关于《监理通知回复单》应用的说法中，正确的是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"一般可由原发出《监理通知单》的监理员进行核查，认可整改结果后予以签认；重大问题可由专业监理工程师进行核查签认",{"key":24,"text":305,"correct":26},"一般可由原发出《监理通知单》的专业监理工程师进行核查，认可整改结果后予以签认；重大问题可由总监理工程师进行核查签认",{"key":28,"text":307,"correct":22},"对重要的《监理通知单》，施工单位必须要向项目监理机构报送《监理通知回复单》",{"key":31,"text":309,"correct":22},"由建设单位技术负责人对《监理通知单》予以答复",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},1102790,"项目监理机构对施工单位申请的费用索赔事项进行审核并签署意见，经（ ）批准后方可作为支付索赔费用的依据。",[314,315,316,318],{"key":20,"text":159,"correct":22},{"key":24,"text":273,"correct":22},{"key":28,"text":317,"correct":26},"建设单位",{"key":31,"text":275,"correct":22},{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":20,"analysis":33},1102791,"施工单位申请工程延期时，项目监理机构对施工单位的申请事项进行审核并签署意见，由（ ）批准后方可延长合同工期。",[323,324,326,328],{"key":20,"text":317,"correct":26},{"key":24,"text":325,"correct":22},"施工单位",{"key":28,"text":327,"correct":22},"监理单位",{"key":31,"text":329,"correct":22},"建设主管部门",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":20,"analysis":33},1102792,"下列用表中，建设单位、设计单位、勘察单位、施工单位、监理单位等各方共同使用的是（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":26},"工作联系单",{"key":24,"text":337,"correct":22},"监理通知单",{"key":28,"text":339,"correct":22},"索赔意向通知书",{"key":31,"text":341,"correct":22},"工程变更单",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":28,"analysis":33},1102793,"下列建设工程监理基本表式中，需加盖施工单位公章的是（ ）。",[346,348,349,351],{"key":20,"text":347,"correct":22},"工程款支付报审表",{"key":24,"text":335,"correct":22},{"key":28,"text":350,"correct":26},"工程开工报审表",{"key":31,"text":352,"correct":22},"工程复工报审表",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":28,"analysis":33},1102794,"监理例会会议纪要由（ ）根据会议记录整理。",[357,358,359,361],{"key":20,"text":325,"correct":22},{"key":24,"text":155,"correct":22},{"key":28,"text":360,"correct":26},"项目监理机构",{"key":31,"text":362,"correct":22},"项目经理部",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":28,"analysis":33},1102795,"《建设工程监理规范》规定，在施工过程中，监理例会会议纪要由（ ）根据会议记录整理，并经与会各方代表会签。",[367,368,369,370],{"key":20,"text":317,"correct":22},{"key":24,"text":325,"correct":22},{"key":28,"text":360,"correct":26},{"key":31,"text":153,"correct":22},{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":31,"analysis":33},1102796,"关于监理例会的说法，正确的是（ ）。",[375,377,379,381],{"key":20,"text":376,"correct":22},"监理例会可以由建设单位组织召开",{"key":24,"text":378,"correct":22},"监理例会的讨论内容是工程质量安全问题",{"key":28,"text":380,"correct":22},"监理例会的会议纪要由建设单位签发",{"key":31,"text":382,"correct":26},"监理例会的议定事项应有落实单位和时限要求",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":31,"analysis":33},1102797,"在工程监理主要文件资料中，监理过程中产生的监理通知单、监理报告、工作联系单及会议纪要等所提出问题的简要统计应在（ ）中加以说明。",[387,389,391,393],{"key":20,"text":388,"correct":22},"监理日志",{"key":24,"text":390,"correct":22},"监理月报",{"key":28,"text":392,"correct":22},"工程质量评估报告",{"key":31,"text":394,"correct":26},"监理工作总结",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":20,"analysis":33},1102798,"工程质量评估报告应在（ ）提交给建设单位。",[399,401,403,405],{"key":20,"text":400,"correct":26},"竣工验收前",{"key":24,"text":402,"correct":22},"竣工验收后",{"key":28,"text":404,"correct":22},"竣工预验收前",{"key":31,"text":406,"correct":22},"竣工验收备案后",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":31,"analysis":33},1102799,"关于《监理通知单》的签发，一般问题可由（ ）签发。",[411,412,413,414],{"key":20,"text":159,"correct":22},{"key":24,"text":273,"correct":22},{"key":28,"text":275,"correct":22},{"key":31,"text":153,"correct":26},{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":20,"analysis":33},1102800,"总监理工程师签发《工程开工令》之前，由（ ）在《工程开工报审表》上签字。",[419,420,422,423],{"key":20,"text":317,"correct":26},{"key":24,"text":421,"correct":22},"项目经理",{"key":28,"text":153,"correct":22},{"key":31,"text":424,"correct":22},"项目技术负责人",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},1102801,"总监理工程师组织专业监理工程师审查施工单位报送的工程开工报审表及相关资料时，不属于审查内容的是（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"设计交底和图纸会审是否已完成",{"key":24,"text":432,"correct":26},"施工许可证是否已办理",{"key":28,"text":434,"correct":22},"施工单位质量管理体系是否已建立",{"key":31,"text":436,"correct":22},"施工组织设计是否已经过总监理工程审查签认",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":24,"analysis":33},1102802,"根据《建设工程监理规范》（GB\u002FT 50319-2013），下列监理文件资料中，需要由总监理工程师签字并加盖执业印章的是（ ）。",[441,443,445,446],{"key":20,"text":442,"correct":22},"总监理工程师任命书",{"key":24,"text":444,"correct":26},"单位工程竣工验收报审表",{"key":28,"text":285,"correct":22},{"key":31,"text":282,"correct":22},{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":24,"analysis":33},1102803,"施工单位报审、报验用表中，适用于施工单位工程预付款、工程进度款、竣工结算款等支付申请的是（ ）。",[451,453,454,455],{"key":20,"text":452,"correct":22},"费用索赔报审表",{"key":24,"text":347,"correct":26},{"key":28,"text":264,"correct":22},{"key":31,"text":339,"correct":22},{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":31,"analysis":33},1102804,"根据《建设工程监理规范》，在工程报验时，不使用《____报验、报审表》的是（ ）。",[460,462,464,466],{"key":20,"text":461,"correct":22},"检验批报验",{"key":24,"text":463,"correct":22},"分项工程报验",{"key":28,"text":465,"correct":22},"隐蔽工程报验",{"key":31,"text":467,"correct":26},"分部工程报验",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":20,"analysis":33},1102805,"下列表式中，需要由工程监理单位法定代表人签字，并加盖工程监理单位公章的是（ ）。",[472,473,474,475],{"key":20,"text":442,"correct":26},{"key":24,"text":350,"correct":22},{"key":28,"text":444,"correct":22},{"key":31,"text":476,"correct":22},"工程暂停令",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":28,"analysis":33},1102806,"对于列入城建档案管理部门接收档案的工程，负责移交工程档案资料的责任单位是（ ）。",[481,482,483,484],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":22},{"key":28,"text":317,"correct":26},{"key":31,"text":485,"correct":22},"城建档案管理部门",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},1102807,"建设工程监理文件资料的组卷顺序是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":22},"分项工程.分部工程.单位工程",{"key":24,"text":493,"correct":26},"单位工程.分部工程.专业.阶段",{"key":28,"text":495,"correct":22},"单位工程.分部工程.检验批",{"key":31,"text":497,"correct":22},"检验批.分部工程.单位工程",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":24,"analysis":33},1102808,"关于建设工程监理文件资料卷内排列要求的说法中，正确的是（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":22},"请示在前，批复在后",{"key":24,"text":505,"correct":26},"主件在前，附件在后",{"key":28,"text":507,"correct":22},"定稿在前，印本在后",{"key":31,"text":509,"correct":22},"图纸在前，文字在后",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":28,"analysis":33},1102809,"对改建、扩建和维修工程，建设单位应组织工程监理单位据实修改、补充和完善监理文件资料，对改变的部位，应当重新编写，并在工程竣工验收后（ ）个月内向城建档案管理部门移交。",[514,516,518,520],{"key":20,"text":515,"correct":22},"1",{"key":24,"text":517,"correct":22},"2",{"key":28,"text":519,"correct":26},"3",{"key":31,"text":521,"correct":22},"6",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":24,"analysis":33},1102810,"列入城建档案管理部门接收范围的工程，建设单位应当在工程竣工验收后（ ）个月内，向城建档案管理部门移交一套符合规定的工程档案（监理文件资料）。",[526,527,528,529],{"key":20,"text":515,"correct":22},{"key":24,"text":519,"correct":26},{"key":28,"text":521,"correct":22},{"key":31,"text":530,"correct":22},"12",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":28,"analysis":33},1102811,"建设工程目标动态控制过程中，实施工程项目计划之后需要做的工作是（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":22},"比较实施绩效和预定目标",{"key":24,"text":538,"correct":22},"分析偏差产生的原因",{"key":28,"text":540,"correct":26},"收集工程项目实施绩效",{"key":31,"text":542,"correct":22},"采取纠偏措施",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":24,"analysis":33},1102812,"加强动态控制过程中的激励措施，调动和发挥员工实现建设工程目标的积极性和创造性，属于三大目标控制措施中的（ ）措施。",[547,549,551,553],{"key":20,"text":548,"correct":22},"合同",{"key":24,"text":550,"correct":26},"组织",{"key":28,"text":552,"correct":22},"技术",{"key":31,"text":554,"correct":22},"经济",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":24,"analysis":33},1102813,"对于施工单位提出涉及工程设计文件修改的工程变更，必要时应召开工程设计文件修改方案的专题论证会议，该会议的正确组织方式是（ ）。",[559,561,563,565],{"key":20,"text":560,"correct":22},"由设计单位组织，建设.施工和监理单位参加",{"key":24,"text":562,"correct":26},"由建设单位组织，设计.施工和监理单位参加",{"key":28,"text":564,"correct":22},"由施工单位组织，建设.设计和监理单位参加",{"key":31,"text":566,"correct":22},"由监理单位组织，建设.设计和施工单位参加",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},1102814,"项目监理机构应签发《工程暂停令》的情形是（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":26},"施工单位未按审查通过的工程设计文件施工",{"key":24,"text":574,"correct":22},"施工单位未按审查通过的施工组织设计组织施工",{"key":28,"text":576,"correct":22},"施工过程中存在工程质量事故隐患",{"key":31,"text":578,"correct":22},"施工过程中出现不符合合同约定的行为",[580,583,586,589,592,595],{"id":15,"name":581,"category":7,"favorite":582},"领导干部任职前廉政法规知识测试题",92,{"id":584,"name":585,"category":7,"favorite":15},595,"建筑结构与设备",{"id":587,"name":588,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":590,"name":591,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":593,"name":594,"category":7,"favorite":8},534,"BIM工程师",{"id":596,"name":594,"category":7,"favorite":8},535]