[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-19":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":575},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,19,50,2341,[13,34,46,58,70,82,94,106,118,130,142,153,165,177,188,200,212,224,236,246,258,266,277,285,297,305,313,325,336,344,356,367,379,387,399,411,423,435,447,458,470,482,493,501,513,523,532,542,554,563],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1103856,1,"单选题","下列选项中，纵横向协调工作量大，处理不当会造成扯皮现象，产生矛盾的是()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","直线职能制组织形式",false,{"key":24,"text":25,"correct":22},"B","职能制组织形式",{"key":27,"text":28,"correct":22},"C","直线制组织形式",{"key":30,"text":31,"correct":32},"D","矩阵制组织形式",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1103857,"在建设工程平行承发包模式下，需委托多家工程监理单位实施监理时，各工程监理单位之间的关系需要由()进行协调。",[38,40,42,44],{"key":20,"text":39,"correct":22},"设计单位",{"key":24,"text":41,"correct":32},"建设单位",{"key":27,"text":43,"correct":22},"质量监督机构",{"key":30,"text":45,"correct":22},"施工总承包单位",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1103858,"依据监理规划及监理实施细则规范，工程监理各项工作都应按一定的逻辑顺序展开，使建设工程监理工作能有效地达到目的而不致造成工作状态的无序和混乱，这体现了()。",[50,52,54,56],{"key":20,"text":51,"correct":32},"工作的时序性",{"key":24,"text":53,"correct":22},"职责分工的严密性",{"key":27,"text":55,"correct":22},"工作目标的确定性",{"key":30,"text":57,"correct":22},"权责一致性",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1103859,"下列选项中，施工单位相对承担较大风险的承发包模式是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"平行承发包模式",{"key":24,"text":65,"correct":22},"施工总承包模式",{"key":27,"text":67,"correct":32},"工程总承包模式",{"key":30,"text":69,"correct":22},"项目总承包管理模式",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1103860,"根据《建设工程监理规范》，属于总监理工程师职责的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":32},"组织审查分包单位资格",{"key":24,"text":77,"correct":22},"处置发现的质量问题和安全事故隐患",{"key":27,"text":79,"correct":22},"检查施工单位投入工程的人力、主要设备的使用及运行状况",{"key":30,"text":81,"correct":22},"检查工序施工结果",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},1103861,"关于项目监理机构组织形式的说法，正确的是()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"矩阵制监理组织形式的优点是纵横向协调工作量小",{"key":24,"text":89,"correct":22},"直线职能制监理组织形式的优点是信息传递路线短",{"key":27,"text":91,"correct":22},"直线制监理组织形式只适用于小型建设工程项目",{"key":30,"text":93,"correct":32},"职能制监理组织形式能发挥职能机构专业管理作用，提高管理效率",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1103862,"下列选项中，项目监理机构不可按( )设立直线制监理组织形式。",[98,100,102,104],{"key":20,"text":99,"correct":22},"子项目分解",{"key":24,"text":101,"correct":22},"专业内容分解",{"key":27,"text":103,"correct":32},"职能分解",{"key":30,"text":105,"correct":22},"建设阶段分解",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},1103863,"根据《建设工程监理规范》GB／T 50319—2013，工程监理单位调换专业监理工程师时，总监理工程师应()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"征得质量监督机构书面同意",{"key":24,"text":113,"correct":22},"征得建设单位书面同意",{"key":27,"text":115,"correct":22},"书面通知施工单位",{"key":30,"text":117,"correct":32},"书面通知建设单位",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1103864,"下列项目监理组织形式中，信息传递路线长，不利于互通信息的是()组织形式。",[122,124,126,128],{"key":20,"text":123,"correct":22},"矩阵制",{"key":24,"text":125,"correct":22},"直线制",{"key":27,"text":127,"correct":32},"直线职能制",{"key":30,"text":129,"correct":22},"职能制",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1103865,"下列选项中，总监理工程师不得将()工作委托给总监理工程师代表。",[134,136,138,140],{"key":20,"text":135,"correct":22},"组织召开监理例会",{"key":24,"text":137,"correct":22},"组织审核分包单位资格",{"key":27,"text":139,"correct":32},"组织编写工程质量评估报告",{"key":30,"text":141,"correct":22},"复核工程计量有关数据",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1103866,"建设工程监理工作由不同专业、不同层次的专家群体共同来完成，()体现了监理工作的规范化，是进行监理工作的前提和实现监理目标的重要保证。",[146,148,149,151],{"key":20,"text":147,"correct":22},"目标控制的动态性",{"key":24,"text":53,"correct":32},{"key":27,"text":150,"correct":22},"监理指令的及时性",{"key":30,"text":152,"correct":22},"监理资料的完整性",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},1103867,"建设工程监理平行承包模式的缺点不包括()。",[157,159,161,163],{"key":20,"text":158,"correct":32},"合同数量少",{"key":24,"text":160,"correct":22},"工程造价控制难度大",{"key":27,"text":162,"correct":22},"工程招标任务量大",{"key":30,"text":164,"correct":22},"施工过程中设计变更和修改较多",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},1103868,"根据《建设工程监理规范》GB／T 50319—2013，属于专业监理工程师职责的是()。",[169,171,173,175],{"key":20,"text":170,"correct":22},"审查分包单位的资质，并提出审查意见",{"key":24,"text":172,"correct":32},"组织编写监理日志，参与编写监理月报",{"key":27,"text":174,"correct":22},"检查承包单位投入工程的人力、资料和设备的使用运营状态并做好检查记录",{"key":30,"text":176,"correct":22},"按设计图及有关标准，对施工工序进行检查和记录",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},1103869,"根据《建设工程监理规范》GB／T 50319—2013，下列监理职责中，属于监理员职责的是()。",[181,183,184,186],{"key":20,"text":182,"correct":22},"处置生产安全事故隐患",{"key":24,"text":141,"correct":32},{"key":27,"text":185,"correct":22},"验收分部分项工程质量",{"key":30,"text":187,"correct":22},"审查阶段性施工进度计划",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":27,"analysis":33},1103870,"下列不属于工程总承包模式下工程监理委托方式优点的是（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"建设单位的合同关系简单",{"key":24,"text":195,"correct":22},"有利于工程造价控制",{"key":27,"text":197,"correct":32},"有利于质量控制",{"key":30,"text":199,"correct":22},"缩短建设周期",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},1103871,"监理工程师在建设工程监理中必须尊重科学、尊重事实、组织各方协同配合，既要维护建设单位合法权益，也不能损害其他有关单位的合法权益，这体现了建设工程监理单位应遵循（）的监理实施原则。",[204,206,208,210],{"key":20,"text":205,"correct":32},"公平、独立、诚信、科学",{"key":24,"text":207,"correct":22},"严格监理，热情服务",{"key":27,"text":209,"correct":22},"实事求是",{"key":30,"text":211,"correct":22},"综合效益",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":30,"analysis":33},1103872,"下列建设工程监理委托模式中，要求监理单位具有较强的合同管理与组织协调能力的是（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"在采用设计或施工总分包模式时，建设单位委托一家监理单位提供实施阶段全过程的监理服务",{"key":24,"text":219,"correct":22},"在采用设计或施工总分包模式时，建设单位按照设计阶段和施工阶段分别委托监理单位提供监理服务",{"key":27,"text":221,"correct":22},"在采用平行承发包模式时，建设单位委托多家监理单位提供监理服务",{"key":30,"text":223,"correct":32},"在采用平行承发包模式时，建设单位委托一家监理单位提供监理服务",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":30,"analysis":33},1103873,"复核或从施工现场直接获取工程计量的有关数据，是（ ）的职责。",[228,230,232,234],{"key":20,"text":229,"correct":22},"总监理工程师",{"key":24,"text":231,"correct":22},"总监理工程师代表",{"key":27,"text":233,"correct":22},"专业监理工程师",{"key":30,"text":235,"correct":32},"监理员",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},1103874,"下列职责中，属于监理员职责的是（ ）。",[240,242,243,245],{"key":20,"text":241,"correct":22},"核查进场材料的质量证明文件及质量情况，并对合格者予以签认",{"key":24,"text":79,"correct":32},{"key":27,"text":244,"correct":22},"负责本专业的工程计量工作，审核工程计量的数据",{"key":30,"text":170,"correct":22},{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},1103875,"下列工作中，总监理工程师可以将其委托给总监理工程师代表的是（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":32},"组织审查和处理工程变更",{"key":24,"text":253,"correct":22},"组织编制监理规划，审批监理实施细则",{"key":27,"text":255,"correct":22},"签发工程款支付证书，组织审核竣工结算",{"key":30,"text":257,"correct":22},"签发工程开工令、暂停令和复工令",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},1103876,"在项目监理机构的组织形式中，职能部门与指挥部门易产生矛盾，信息传递路线长，不利于互通情报的组织形式是（ ）。",[262,263,264,265],{"key":20,"text":127,"correct":32},{"key":24,"text":129,"correct":22},{"key":27,"text":125,"correct":22},{"key":30,"text":123,"correct":22},{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":24,"analysis":33},1103877,"根据《建设工程监理规范》，总监理工程师不得委托给总监理工程师代表的职责是 （ ）。",[270,271,273,275],{"key":20,"text":251,"correct":22},{"key":24,"text":272,"correct":32},"参与工程质量事故的调查",{"key":27,"text":274,"correct":22},"组织整理工程项目的监理文件资料",{"key":30,"text":276,"correct":22},"检查监理人员工作",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":30,"analysis":33},1103878,"能将集权与分权实行最优结合且利于解决复杂难题，是( )监理组织形式的优点。",[281,282,283,284],{"key":20,"text":125,"correct":22},{"key":24,"text":129,"correct":22},{"key":27,"text":127,"correct":22},{"key":30,"text":123,"correct":32},{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":24,"analysis":33},1103879,"项目监理机构组织结构设计中，制定岗位职责及考核标准的前一步骤是()。",[289,291,293,295],{"key":20,"text":290,"correct":22},"选择组织结构形式",{"key":24,"text":292,"correct":32},"设置项目监理机构部门",{"key":27,"text":294,"correct":22},"选派监理人员",{"key":30,"text":296,"correct":22},"制定工作流程和信息流程",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},1103880,"常用的项目监理机构组织形式中，适用于能划分为若干个相对独立的子项目的大、中型建设工程的组织形式是()。",[301,302,303,304],{"key":20,"text":28,"correct":32},{"key":24,"text":25,"correct":22},{"key":27,"text":21,"correct":22},{"key":30,"text":31,"correct":22},{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":27,"analysis":33},1103881,"根据《建设工程监理规范》GB／T 50319—2013，检查施工单位投入工程的人力、主要设备的使用及运行状况由()负责。",[309,310,311,312],{"key":20,"text":229,"correct":22},{"key":24,"text":233,"correct":22},{"key":27,"text":235,"correct":32},{"key":30,"text":231,"correct":22},{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":20,"analysis":33},1103882,"关于总监理工程师负责制原则所体现的权责主体的说法，正确的是( )。",[317,319,321,323],{"key":20,"text":318,"correct":32},"总监理工程师既是工程监理的责任主体，又是工程监理的权力主体",{"key":24,"text":320,"correct":22},"总监理工程师只是工程监理的责任主体，不是工程监理的权力主体",{"key":27,"text":322,"correct":22},"总监理工程师既是工程监理的权利主体，又是工程监理的责任主体",{"key":30,"text":324,"correct":22},"总监理工程师只是工程监理的权利主体，不是工程监理的责任主体",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":27,"analysis":33},1103883,"与施工总承包模式下工程监理委托方式相比，平行承发包模式下工程监理委托方式的优点是()。",[329,330,332,334],{"key":20,"text":197,"correct":22},{"key":24,"text":331,"correct":22},"有利于造价控制",{"key":27,"text":333,"correct":32},"有利于缩短工期",{"key":30,"text":335,"correct":22},"有利于合同管理",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":20,"analysis":33},1103884,"下列各项中，不属于建设工程监理平行承发包模式缺点的是()。",[340,341,342,343],{"key":20,"text":158,"correct":32},{"key":24,"text":160,"correct":22},{"key":27,"text":162,"correct":22},{"key":30,"text":164,"correct":22},{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":27,"analysis":33},1103885,"总监理工程师是实现建设工程监理目标的最高责任者，这体现了()原则。",[348,350,352,354],{"key":20,"text":349,"correct":22},"公平、公正",{"key":24,"text":351,"correct":22},"权责一致",{"key":27,"text":353,"correct":32},"总监理工程师负责制",{"key":30,"text":355,"correct":22},"综合效益原则",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},1103886,"建设工程平行承包模式的缺点包括( )",[360,362,363,365],{"key":20,"text":361,"correct":22},"业主选择承包单位范围小",{"key":24,"text":160,"correct":32},{"key":27,"text":364,"correct":22},"进度控制难度大",{"key":30,"text":366,"correct":22},"质量控制难度大",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":24,"analysis":33},1103887,"直线制监理组织形式的优点是（）。",[371,373,375,377],{"key":20,"text":372,"correct":22},"总监理工程师负担较轻",{"key":24,"text":374,"correct":32},"权力集中",{"key":27,"text":376,"correct":22},"集权与分权分配合理",{"key":30,"text":378,"correct":22},"专家参与管理",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":24,"analysis":33},1103888,"下列监理人员中，处于项目监理机构中间控制层的是（ ）。",[383,384,385,386],{"key":20,"text":235,"correct":22},{"key":24,"text":233,"correct":32},{"key":27,"text":231,"correct":22},{"key":30,"text":229,"correct":22},{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":27,"analysis":33},1103889,"某工程分为两个子项目，合同总价为4800万美元，其中子项目一的合同价为2100万美元，子项目二的合同价为2700万美元，合同工期为32个月，则工程建设强度为()万美元／年。",[391,393,395,397],{"key":20,"text":392,"correct":22},"1560",{"key":24,"text":394,"correct":22},"1280",{"key":27,"text":396,"correct":32},"1800",{"key":30,"text":398,"correct":22},"2400",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":24,"analysis":33},1103890,"项目监理机构组织结构设计中，管理层次可分为三个层次，其中不包括()。",[403,405,407,409],{"key":20,"text":404,"correct":22},"决策层",{"key":24,"text":406,"correct":32},"指导层",{"key":27,"text":408,"correct":22},"中间控制层",{"key":30,"text":410,"correct":22},"操作层",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":24,"analysis":33},1103891,"在设立项目监理机构的过程中，应根据()确定的监理目标建立项目监理机构。",[415,417,419,421],{"key":20,"text":416,"correct":22},"监理实施细则",{"key":24,"text":418,"correct":32},"建设工程监理合同",{"key":27,"text":420,"correct":22},"监理大纲",{"key":30,"text":422,"correct":22},"监理规划",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":20,"analysis":33},1103892,"对建设工程实施监理时，工程监理单位应遵守的基本原则之一是（ ）。",[427,429,431,433],{"key":20,"text":428,"correct":32},"权责一致原则",{"key":24,"text":430,"correct":22},"才职相称原则",{"key":27,"text":432,"correct":22},"弹性原则",{"key":30,"text":434,"correct":22},"集权与分权统一原则",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":30,"analysis":33},1103893,"建设工程监理实施程序宜按（ ）实施。",[439,441,443,445],{"key":20,"text":440,"correct":22},"编制建设工程监理大纲.监理规划.监理细则，开展监理工作",{"key":24,"text":442,"correct":22},"编制监理规划，组建项目监理机构，编制监理细则，开展监理工作",{"key":27,"text":444,"correct":22},"编制监理规划，组建项目监理机构，开展监理工作，参加工程竣工验收",{"key":30,"text":446,"correct":32},"组建项目监理机构，编制监理规划，开展监理工作，向建设单位提交工程监理文件资料",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":27,"analysis":33},1103894,"组建项目监理机构的步骤中，需最后完成的工作是（ ）。",[451,453,455,456],{"key":20,"text":452,"correct":22},"确定管理层次和管理跨度",{"key":24,"text":454,"correct":22},"确定组织结构和工作内容",{"key":27,"text":296,"correct":32},{"key":30,"text":457,"correct":22},"制定岗位职责和考核标准",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":30,"analysis":33},1103895,"矩阵制监理组织形式的优点是（ ）。",[462,464,466,468],{"key":20,"text":463,"correct":22},"权力集中，隶属关系明确",{"key":24,"text":465,"correct":22},"命令统一，决策迅速",{"key":27,"text":467,"correct":22},"发挥职能机构的专业管理作用",{"key":30,"text":469,"correct":32},"有较大的机动性和适应性",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":20,"analysis":33},1103896,"(2018年真题)建设工程采用平行承发包模式的优点是（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":32},"有利于缩短建设工期",{"key":24,"text":477,"correct":22},"有利于业主方的合同管理",{"key":27,"text":479,"correct":22},"有利于工程总价的确定",{"key":30,"text":481,"correct":22},"有利于减少工程招标任务量",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":27,"analysis":33},1103897,"(2017年真题)与其他组织方式相比，工程总承包方式具有的优点是（ ）。",[486,487,489,491],{"key":20,"text":197,"correct":22},{"key":24,"text":488,"correct":22},"合同管理难度小",{"key":27,"text":490,"correct":32},"合同关系较简单",{"key":30,"text":492,"correct":22},"合同条款可准确确定",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":24,"analysis":33},1103898,"(2014年真题)在建设工程平行承发包模式下，需委托多家工程监理单位实施监理时，各工程监理单位之间的关系需要由 （ ）进行协调。",[497,498,499,500],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":32},{"key":27,"text":43,"correct":22},{"key":30,"text":45,"correct":22},{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":24,"analysis":33},1103899,"(2012年真题)对业主合同管理而言，工程总承包模式的特点是（ ）。",[505,507,509,511],{"key":20,"text":506,"correct":22},"合同关系简单，故合同管理难度较小",{"key":24,"text":508,"correct":32},"合同关系简单，但合同管理难度较大",{"key":27,"text":510,"correct":22},"合同关系复杂，故合同管理难度较大",{"key":30,"text":512,"correct":22},"合同关系复杂，但合同管理难度较小",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":30,"analysis":33},1103900,"(2012年真题)下列建设工程监理委托模式中，要求监理单位具有较强的合同管理与组织协调能力的是（ ）。",[517,519,521,522],{"key":20,"text":518,"correct":22},"在采用设计或施工总承包模式时，建设单位委托一家监理单位提供实施阶段全过程的监理服务",{"key":24,"text":520,"correct":22},"在采用设计或施工总承包模式时，建设单位按照设计阶段和施工阶段分别委托监理单位提供监理服务",{"key":27,"text":221,"correct":22},{"key":30,"text":223,"correct":32},{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":27,"analysis":33},1103901,"(2016年真题)监理工程师“应运用合理的技能，谨慎而勤奋地工作”，属于工程监理实施的（ ）原则。",[527,528,529,531],{"key":20,"text":351,"correct":22},{"key":24,"text":209,"correct":22},{"key":27,"text":530,"correct":32},"热情服务",{"key":30,"text":211,"correct":22},{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":27,"analysis":33},1103902,"(2015年真题)工程监理单位依据建设单位的委托，履行监理职责、承担监理责任，这体现了建设工程监理的（ ）原则。",[536,538,539,540],{"key":20,"text":537,"correct":22},"严格监理",{"key":24,"text":209,"correct":22},{"key":27,"text":351,"correct":32},{"key":30,"text":541,"correct":22},"公平诚信",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":30,"analysis":33},1103903,"(2017年真题)采用工程总承包模式的优点是（ ）。",[546,548,550,552],{"key":20,"text":547,"correct":22},"建设单位选择承包单位的范围大",{"key":24,"text":549,"correct":22},"工程招标发包工作难度小",{"key":27,"text":551,"correct":22},"总承包单位承担的风险小",{"key":30,"text":553,"correct":32},"发包人组织协调工作量小",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":27,"analysis":33},1103904,"(2010年真题)下列要求中，不属于监理工作规范化要求的是（ ）。",[558,559,560,562],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":561,"correct":32},"完成目标的准确性",{"key":30,"text":55,"correct":22},{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":27,"analysis":33},1103905,"(2018年真题)总监理工程师负责制的“核心”内容是指（ ）。",[567,569,571,573],{"key":20,"text":568,"correct":22},"总监理工程师是建设工程监理的权力主体",{"key":24,"text":570,"correct":22},"总监理工程师是建设工程监理的义务主体",{"key":27,"text":572,"correct":32},"总监理工程师是建设工程监理的责任主体",{"key":30,"text":574,"correct":22},"总监理工程师是建设工程监理的利益主体",[576,579,582,585,588,591],{"id":15,"name":577,"category":7,"favorite":578},"领导干部任职前廉政法规知识测试题",92,{"id":580,"name":581,"category":7,"favorite":15},595,"建筑结构与设备",{"id":583,"name":584,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":586,"name":587,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":589,"name":590,"category":7,"favorite":8},534,"BIM工程师",{"id":592,"name":590,"category":7,"favorite":8},535]