[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":572},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,18,50,2341,[13,34,46,58,70,80,92,104,116,128,140,152,164,176,188,200,212,224,236,247,259,271,283,295,307,319,331,342,352,364,376,385,393,401,409,419,431,439,451,459,467,479,491,503,513,525,536,548,556,564],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1103782,1,"单选题","下列选项中，不符合建设工程监理单位受建设单位委托实施建设工程监理时，应遵循的基本原则是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","实事求是的原则",false,{"key":24,"text":25,"correct":22},"B","综合效益的原则",{"key":27,"text":28,"correct":29},"C","公平、公正、公开、科学的原则",true,{"key":31,"text":32,"correct":22},"D","总监理工程师负责制的原则","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1103783,"关于反映工程项目特征的有关资料，不属于的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"关于工程建设报建程序的有关规定",{"key":24,"text":41,"correct":22},"土地管理部门关于准予用地的批文",{"key":27,"text":43,"correct":22},"规划部门关于规划红线范围和设计条件的通知",{"key":31,"text":45,"correct":22},"工程项目的批文",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1103784,"下列选项中，不属于监理员职责的是()。",[50,52,54,56],{"key":20,"text":51,"correct":29},"进行工程计量",{"key":24,"text":53,"correct":22},"进行见证取样",{"key":27,"text":55,"correct":22},"检查工序施工结果",{"key":31,"text":57,"correct":22},"复核工程计量有关数据",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1103785,"在调换专业监理工程师时，应负责书面通知建设单位的是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"监理单位技术负责人",{"key":24,"text":65,"correct":22},"建设单位代表",{"key":27,"text":67,"correct":29},"总监理工程师",{"key":31,"text":69,"correct":22},"总监理工程师代表",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1103786,"下列选项中，处于项目监理机构操作层的是()。",[74,76,78,79],{"key":20,"text":75,"correct":29},"监理员",{"key":24,"text":77,"correct":22},"专业监理工程师",{"key":27,"text":69,"correct":22},{"key":31,"text":67,"correct":22},{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":27,"analysis":33},1103788,"下列选项中，工程建设强度涵含的是()。",[84,86,88,90],{"key":20,"text":85,"correct":22},"工程结构所能承受的强度",{"key":24,"text":87,"correct":22},"政府对工程建设管理的力度",{"key":27,"text":89,"correct":29},"单位时间内投入的工程建设资金的数量",{"key":31,"text":91,"correct":22},"单位时间内投入的工程建设人员的数量",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":24,"analysis":33},1103789,"按照《建设工程监理规范》，下列工作不属于建设工程项目总监理工程师基本职责的是()。",[96,98,100,102],{"key":20,"text":97,"correct":22},"组织审查单位工程质量检验资料",{"key":24,"text":99,"correct":29},"检查进场的工程材料、构配件、设备的质量",{"key":27,"text":101,"correct":22},"组织审核分包单位资格",{"key":31,"text":103,"correct":22},"签发工程开工令、暂停令和复工令",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":20,"analysis":33},1103790,"工程监理单位调换总监理工程师，应征得()书面同意。",[108,110,112,114],{"key":20,"text":109,"correct":29},"建设单位",{"key":24,"text":111,"correct":22},"总承包单位",{"key":27,"text":113,"correct":22},"质量监督机构",{"key":31,"text":115,"correct":22},"建设行政主管部门",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":31,"analysis":33},1103791,"下列选项中，具体负责监理活动操作实施的是()。",[120,122,124,126],{"key":20,"text":121,"correct":22},"决策层",{"key":24,"text":123,"correct":22},"协调层",{"key":27,"text":125,"correct":22},"执行层",{"key":31,"text":127,"correct":29},"操作层",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":31,"analysis":33},1103793,"直线制监理组织形式的主要特点是()。",[132,134,136,138],{"key":20,"text":133,"correct":22},"接受职能部门多头指挥，指令矛盾时，将使直线指挥部门人员无所适从",{"key":24,"text":135,"correct":22},"统一指挥、直线领导，但职能部门与指挥部门易产生矛盾",{"key":27,"text":137,"correct":22},"具有较大的机动性和适应性，但纵横向协调工作量大",{"key":31,"text":139,"correct":29},"组织机构简单、权力集中、命令统一、职责分明、隶属关系明确",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":24,"analysis":33},1103796,"下列选项中，不属于职能制监理组织形式的特点的是()。",[144,146,148,150],{"key":20,"text":145,"correct":22},"提高管理效率",{"key":24,"text":147,"correct":29},"下级人员接受的指令单一",{"key":27,"text":149,"correct":22},"减轻总监理工程师的负担",{"key":31,"text":151,"correct":22},"可以发挥职能机构的专业管理作用",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},1103801,"关于监理人员任职与调换的说法，正确的是()。",[156,158,160,162],{"key":20,"text":157,"correct":22},"监理单位调换总监理工程师应书面通知建设单位",{"key":24,"text":159,"correct":29},"总监理工程师调换专业监理工程师后书面通知建设单位",{"key":27,"text":161,"correct":22},"总监理工程师调换专业监理工程师并口头通知建设单位",{"key":31,"text":163,"correct":22},"总监理工程师调换专业监理工程师不必通知建设单位",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},1103802,"在建立项目监理机构的步骤中，处于确定项目监理机构目标与设计项目监理机构组织结构之间的工作是()。",[168,170,172,174],{"key":20,"text":169,"correct":22},"分解项目监理机构目标",{"key":24,"text":171,"correct":29},"确定监理工作内容",{"key":27,"text":173,"correct":22},"选择组织结构形式",{"key":31,"text":175,"correct":22},"设置项目监理机构部门",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":20,"analysis":33},1103803,"在建立项目监理机构的工作步骤中，最后需要完成的工作是()。",[180,182,184,186],{"key":20,"text":181,"correct":29},"制定工作流程和信息流程",{"key":24,"text":183,"correct":22},"制定岗位职责和考核标准",{"key":27,"text":185,"correct":22},"确定组织结构和组织形式",{"key":31,"text":187,"correct":22},"安排监理人员和辅助人员",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},1103804,"组织中从最高管理者到最基层实际工作人员的人数及权责的基本规律是()。",[192,194,196,198],{"key":20,"text":193,"correct":22},"人数逐层递减，权责逐层递减",{"key":24,"text":195,"correct":29},"人数逐层递增，权责逐层递减",{"key":27,"text":197,"correct":22},"人数逐层递减，权责逐层递增",{"key":31,"text":199,"correct":22},"人数逐层递增，权责逐层递增",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},1103805,"某项目监理机构的组织结构如下图所示，这种组织结构形式的优点是()。",[204,206,208,210],{"key":20,"text":205,"correct":22},"目标控制职能分工明确",{"key":24,"text":207,"correct":29},"权力集中、隶属关系明确",{"key":27,"text":209,"correct":22},"强化了各职能部门横向联系",{"key":31,"text":211,"correct":22},"可减轻总监理工程师负担",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},1103806,"下列项目监理机构组织形式中，易造成职能部门对指挥部门指令矛盾的是()。",[216,218,220,222],{"key":20,"text":217,"correct":22},"职能制监理组织形式",{"key":24,"text":219,"correct":29},"直线职能制监理组织形式",{"key":27,"text":221,"correct":22},"矩阵制监理组织形式",{"key":31,"text":223,"correct":22},"直线制监理组织形式",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":27,"analysis":33},1103807,"下列关于项目监理机构组织形式的表述中，正确的是()。",[228,230,232,234],{"key":20,"text":229,"correct":22},"职能制监理组织形式最适用于小型建设工程",{"key":24,"text":231,"correct":22},"职能制监理组织形式具有较大的机动性和适应性",{"key":27,"text":233,"correct":29},"直线职能制监理组织形式的缺点是职能部门与指挥部门易产生矛盾",{"key":31,"text":235,"correct":22},"矩阵制监理组织形式的优点之一是其中任何一个下级只接受唯一上级的指令",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":20,"analysis":33},1103808,"根据《建设工程监理规范》，不属于专业监理工程师职责的是()。",[240,241,243,245],{"key":20,"text":101,"correct":29},{"key":24,"text":242,"correct":22},"负责编制监理实施细则",{"key":27,"text":244,"correct":22},"检查进场的工程材料、构配件的质量",{"key":31,"text":246,"correct":22},"处置发现的质量问题和安全事故隐患",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":27,"analysis":33},1103811,"关于直线职能制组织形式的说法，正确的是()。",[251,253,255,257],{"key":20,"text":252,"correct":22},"直线职能制组织形式兼具职能制和矩阵制组织形式的特点",{"key":24,"text":254,"correct":22},"直线职能制与职能制组织形式的职能部门具有相同的管理职责与权力",{"key":27,"text":256,"correct":29},"直线职能制组织形式的直线指挥部门人员不接受职能部门的指令",{"key":31,"text":258,"correct":22},"直线职能制组织形式的信息传递路线短，有利于互通信息",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},1103812,"下列组织形式特点中，属于矩阵制监理组织形式特点的是()。",[263,265,267,269],{"key":20,"text":264,"correct":29},"具有较大的机动性和适用性，纵横向协调工作量大",{"key":24,"text":266,"correct":22},"直线领导，但职能部门与指挥部门易产生矛盾",{"key":27,"text":268,"correct":22},"权力集中，组织机构简单，隶属关系明确",{"key":31,"text":270,"correct":22},"信息传递路线长，不利于信息相互沟通",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},1103813,"关于影响项目监理机构人员配备因素的说法，正确的是()。",[275,277,279,281],{"key":20,"text":276,"correct":22},"工程建设强度中的工期是指工程项目总工期",{"key":24,"text":278,"correct":29},"工程监理单位的业务水平不同将影响监理人员需要量定额水平",{"key":27,"text":280,"correct":22},"监理工作需要委托专业检测、检验机构时也不宜减少监理人员数量",{"key":31,"text":282,"correct":22},"因监理工作专业配套的要求，简单工程与复杂工程的监理人数配备应一致",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":24,"analysis":33},1103827,"监理组织机构中，拥有职能部门的监理组织形式有（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":22},"直线制和职能制",{"key":24,"text":290,"correct":29},"职能制和矩阵制",{"key":27,"text":292,"correct":22},"直线制和直线职能制",{"key":31,"text":294,"correct":22},"矩阵制和直线制",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":31,"analysis":33},1103828,"关于监理人员任职与调换的说法，错误的是（ ）。",[299,301,303,305],{"key":20,"text":300,"correct":22},"总监理工程师需要同时担任多项建设工程监理合同的总监理工程师时，应经建设单位书面同意",{"key":24,"text":302,"correct":22},"总监理工程师最多不得同时担任超过三项建设工程监理合同的总监理工程师",{"key":27,"text":304,"correct":22},"总监理工程师调换专业监理工程师应书面通知建设单位",{"key":31,"text":306,"correct":29},"工程监理单位调换总监理工程师，不用征得建设单位书面同意",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":24,"analysis":33},1103830,"关于直线职能制组织形式的说法，错误的是（ ）。",[311,313,315,317],{"key":20,"text":312,"correct":22},"直线职能制组织形式兼具直线制和职能制组织形式的优点",{"key":24,"text":314,"correct":29},"直线职能制与职能制组织形式的职能部门具有相同的管理职能与权力",{"key":27,"text":316,"correct":22},"直线职能制组织形式的直线指挥部门人员不接受职能部门的直接指令",{"key":31,"text":318,"correct":22},"直线职能制组织形式的信息传递路线长，不利于互通消息",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":24,"analysis":33},1103831,"根据《建设工程监理规范》GB\u002FT 50319-2013规定，下列关于项目监理机构的矩阵制组织形式特点的说法，正确的是（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"不利于解决复杂问题",{"key":24,"text":326,"correct":29},"加强了各职能部门的横向联系",{"key":27,"text":328,"correct":22},"机动性和适应性的能力弱",{"key":31,"text":330,"correct":22},"纵横向协调工作量小",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},1103832,"根据《建设工程监理规范》GB\u002FT 50319-2013，下列不属于总监理工程师职责的是（ ）。",[335,337,338,340],{"key":20,"text":336,"correct":22},"根据工程进展及监理工作情况调配监理人员，检查监理人员工作",{"key":24,"text":51,"correct":29},{"key":27,"text":339,"correct":22},"组织编制监理规划，审批监理实施细则",{"key":31,"text":341,"correct":22},"确定项目监理机构人员及其岗位职责",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":20,"analysis":33},1103833,"总监理工程师不得将下列工作委托给总监理工程师代表的是（ ）。",[346,347,349,350],{"key":20,"text":103,"correct":29},{"key":24,"text":348,"correct":22},"组织验收分部工程，组织审查单位工程质量检验资料",{"key":27,"text":341,"correct":22},{"key":31,"text":351,"correct":22},"组织编写监理月报、监理工作总结，组织质量监理文件资料",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":27,"analysis":33},1103834,"关于项目监理机构中管理层次与管理跨度的说法，错误的是（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":22},"管理层次是指组织的最高管理者到最基层实际工作人员之间等级层次的数量",{"key":24,"text":359,"correct":22},"管理跨度是指一名上级管理人员所直接管理的下级人数",{"key":27,"text":361,"correct":29},"管理跨度是指组织的最高管理层所管理下级人员数量总和",{"key":31,"text":363,"correct":22},"管理层次可分为三个层次，即决策层、中间控制层和操作层",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":27,"analysis":33},1103835,"项目监理机构中任何一个下级只接受唯一上级的命令属于项目监理机构组织形式中（ ）的特点。",[368,370,372,374],{"key":20,"text":369,"correct":22},"矩阵制组织形式",{"key":24,"text":371,"correct":22},"职能制组织形式",{"key":27,"text":373,"correct":29},"直线制组织形式",{"key":31,"text":375,"correct":22},"直线职能制组织形式",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":31,"analysis":33},1103836,"（）是一个建设工程监理工作的总负责人。",[380,381,383,384],{"key":20,"text":75,"correct":22},{"key":24,"text":382,"correct":22},"专业监理工程",{"key":27,"text":69,"correct":22},{"key":31,"text":67,"correct":29},{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":24,"analysis":33},1103837,"按照《建设工程监理规范》，建设工程项目总监理工程师的基本职责不包括（）。",[389,390,391,392],{"key":20,"text":97,"correct":22},{"key":24,"text":99,"correct":29},{"key":27,"text":101,"correct":22},{"key":31,"text":103,"correct":22},{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":24,"analysis":33},1103838,"职能制监理组织形式的特点不包括（）。",[397,398,399,400],{"key":20,"text":145,"correct":22},{"key":24,"text":147,"correct":29},{"key":27,"text":149,"correct":22},{"key":31,"text":151,"correct":22},{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},1103839,"下列（）不能处于项目监理机构的决策层。",[405,406,407,408],{"key":20,"text":75,"correct":29},{"key":24,"text":77,"correct":22},{"key":27,"text":69,"correct":22},{"key":31,"text":67,"correct":22},{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":27,"analysis":33},1103840,"总监理工程师不得将下列（）工作委托给总监理工程师代表。",[413,415,416,418],{"key":20,"text":414,"correct":22},"组织召开监理例会",{"key":24,"text":101,"correct":22},{"key":27,"text":417,"correct":29},"组织编写工程质量评估报告",{"key":31,"text":57,"correct":22},{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":31,"analysis":33},1103841,"根据我国建设工程监理程序的规定，监理单位开展监理工作的第一步是（）。",[423,425,427,429],{"key":20,"text":424,"correct":22},"编制建设工程监理规划",{"key":24,"text":426,"correct":22},"签订监理合同",{"key":27,"text":428,"correct":22},"接受监理任务",{"key":31,"text":430,"correct":29},"组建项目监理机构",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":27,"analysis":33},1103842,"所谓工程建设强度，是指（）。",[435,436,437,438],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":22},{"key":27,"text":89,"correct":29},{"key":31,"text":91,"correct":22},{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":27,"analysis":33},1103843,"施工单位相对承担较大风险的承发包模式是（）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"平行承发包模式",{"key":24,"text":446,"correct":22},"施工总承包模式",{"key":27,"text":448,"correct":29},"工程总承包模式",{"key":31,"text":450,"correct":22},"项目总承包管理模式",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":20,"analysis":33},1103844,"项目监理机构中操作层主要由组成（）。",[455,456,457,458],{"key":20,"text":75,"correct":29},{"key":24,"text":77,"correct":22},{"key":27,"text":67,"correct":22},{"key":31,"text":69,"correct":22},{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":27,"analysis":33},1103845,"调解建设单位与施工单位的合同争议，处理工程索赔是（）的职责。",[463,464,465,466],{"key":20,"text":63,"correct":22},{"key":24,"text":77,"correct":22},{"key":27,"text":67,"correct":29},{"key":31,"text":69,"correct":22},{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":27,"analysis":33},1103846,"项目监理机构不可按（）设立直线制监理组织形式。",[471,473,475,477],{"key":20,"text":472,"correct":22},"子项目分解",{"key":24,"text":474,"correct":22},"专业内容分解",{"key":27,"text":476,"correct":29},"职能分解",{"key":31,"text":478,"correct":22},"建设阶段分解",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":20,"analysis":33},1103847,"（）是指单位时间内投入的建设工程资金的数量。",[483,485,487,489],{"key":20,"text":484,"correct":29},"工程建设强度",{"key":24,"text":486,"correct":22},"工程建设工期",{"key":27,"text":488,"correct":22},"工程建设投资",{"key":31,"text":490,"correct":22},"建设工程复杂程度",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":20,"analysis":33},1103848,"平行承发包模式条件下，业主委托一家监理单位实施监理时，监理单位的项目监理机构（）对各施工单位实施监理。",[495,497,499,501],{"key":20,"text":496,"correct":29},"可组建多个监理分支机构",{"key":24,"text":498,"correct":22},"不应组建监理分支机构",{"key":27,"text":500,"correct":22},"组建不超过两个监理分支机构",{"key":31,"text":502,"correct":22},"只能组建不超过三个监理分支机构",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":24,"analysis":33},1103849,"下列不属于工程监理单位应遵循的基本原则是（）。",[507,509,511,512],{"key":20,"text":508,"correct":22},"权责一致的原则",{"key":24,"text":510,"correct":29},"职责分工的严密性",{"key":27,"text":25,"correct":22},{"key":31,"text":32,"correct":22},{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},1103850,"（）是总监理工程师负责制的核心。",[517,519,521,523],{"key":20,"text":518,"correct":29},"责任",{"key":24,"text":520,"correct":22},"权利",{"key":27,"text":522,"correct":22},"任务",{"key":31,"text":524,"correct":22},"目标",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":20,"analysis":33},1103851,"对择优选择承建单位最有利的工程承发包模式是（）。",[529,530,532,534],{"key":20,"text":444,"correct":29},{"key":24,"text":531,"correct":22},"设计和施工总承包模式",{"key":27,"text":533,"correct":22},"项目总承包模式",{"key":31,"text":535,"correct":22},"设计和施工联合体承包模式",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":27,"analysis":33},1103852,"建设工程施工完成以后，监理单位应（）。",[540,542,544,546],{"key":20,"text":541,"correct":22},"组织工程竣工验收",{"key":24,"text":543,"correct":22},"与建设单位一起组织竣工验收",{"key":27,"text":545,"correct":29},"在正式验收前组织工程竣工预验收",{"key":31,"text":547,"correct":22},"与施工单位一起组织竣工验收",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":27,"analysis":33},1103853,"调换专业监理工程师时，（）应书面通知建设单位。",[552,553,554,555],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":22},{"key":27,"text":67,"correct":29},{"key":31,"text":69,"correct":22},{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":20,"analysis":33},1103854,"下列选项中，属于专业监理工程师职责的是()。",[560,561,562,563],{"key":20,"text":51,"correct":29},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":22},{"key":31,"text":57,"correct":22},{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":31,"analysis":33},1103855,"下列选项中，一个建设工程监理工作的总负责人是()。",[568,569,570,571],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":22},{"key":27,"text":69,"correct":22},{"key":31,"text":67,"correct":29},[573,576,579,582,585,588],{"id":15,"name":574,"category":7,"favorite":575},"领导干部任职前廉政法规知识测试题",92,{"id":577,"name":578,"category":7,"favorite":15},595,"建筑结构与设备",{"id":580,"name":581,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":583,"name":584,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":586,"name":587,"category":7,"favorite":8},534,"BIM工程师",{"id":589,"name":587,"category":7,"favorite":8},535]