[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,15,50,2341,[13,34,46,58,70,82,94,106,118,130,142,154,165,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,357,369,381,389,401,412,424,436,448,460,472,484,496,508,520,532,544,556,568,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1103578,1,"单选题","（2020年真题）根据《建设工程监理规范》，可由专业监理工程师签发的监理文件是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","工程复工令",false,{"key":24,"text":25,"correct":22},"B","工程开工令",{"key":27,"text":28,"correct":29},"C","监理通知单",true,{"key":31,"text":32,"correct":22},"D","工程款支付证书","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1103579,"（2020年真题）为了有效控制建设工程项目目标，项目监理机构可采取的技术措施是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"审查施工方案",{"key":24,"text":41,"correct":22},"编制资金使用计划",{"key":27,"text":43,"correct":22},"明确人员职责分工",{"key":31,"text":45,"correct":22},"预测末完工程投资",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1103580,"(2015年真题）关于平行检验的说法，正确的是（ ）",[50,52,54,56],{"key":20,"text":51,"correct":29},"平行检验是项目监理机构控制施工质量的工作之一",{"key":24,"text":53,"correct":22},"平行检验是指对工程实体的量测检验",{"key":27,"text":55,"correct":22},"平行检验人员应根据施工单位自检情况填写检验结论",{"key":31,"text":57,"correct":22},"平行检验是指项目监理机构对施工单位自检结论的核验",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1103581,"(2015年真题）监理人员实施旁站时，发现施工活动危及工程质量的，应当采取的措施是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"责令施工单位立即整改",{"key":24,"text":65,"correct":29},"及时向总监理工程师报告",{"key":27,"text":67,"correct":22},"责令暂停施工",{"key":31,"text":69,"correct":22},"召开紧急会议",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1103582,"(2015年真题）建设工程质量、造价和进度三大目标之间的关系中，属于统一关系的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"对工程质量有较高要求，就需要投入较多资金",{"key":24,"text":77,"correct":22},"要在较短时间内完成建设工程，势必会增加建设投资",{"key":27,"text":79,"correct":22},"要减少投资和节约费用，就可能会降低建设工程功能",{"key":31,"text":81,"correct":29},"提高建设工程质量标准，会降低建设工程运行费用",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1103583,"(2015年真题）施工单位承租的机械设备和施工机具及配件使用前，应由施工总承包单位、分包单位、出租单位和（ ）共同进行验收。",[86,88,90,92],{"key":20,"text":87,"correct":22},"建设单位",{"key":24,"text":89,"correct":22},"监理单位",{"key":27,"text":91,"correct":29},"安装单位",{"key":31,"text":93,"correct":22},"检测单位",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1103584,"(2010年真题）下列协调工作中，属于项目监理机构内部人际关系协调工作的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"事先约定各个部门在工作中的相互关系",{"key":24,"text":101,"correct":22},"建立信息沟通制度",{"key":27,"text":103,"correct":22},"平衡监理人员使用计划",{"key":31,"text":105,"correct":29},"委任工作职责分明",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1103585,"(2012年真题）下列单位中，属于项目监理机构远外层协调范围的单位是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"材料供应商和设备供应商",{"key":24,"text":113,"correct":22},"设备供应商和政府部门",{"key":27,"text":115,"correct":29},"政府部门和社会团体",{"key":31,"text":117,"correct":22},"社会团体和材料供应商",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1103586,"(2012年真题）由建设工程投资、进度、质量三大目标之间存在对立统一关系可知，建设工程三大目标应（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"同时达到最优",{"key":24,"text":125,"correct":22},"分别进行分析与论证",{"key":27,"text":127,"correct":29},"作为一个系统统筹考虑",{"key":31,"text":129,"correct":22},"尽可能进行定量的分析",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1103587,"(2014年真题）见证取样通常涉及三方行为，这三方是指（ ）",[134,136,138,140],{"key":20,"text":135,"correct":22},"施工方、监理方和建设方",{"key":24,"text":137,"correct":22},"监理方、设计方和建设方",{"key":27,"text":139,"correct":22},"监理方、施工方和设计方",{"key":31,"text":141,"correct":29},"施工方、见证方和试验方",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1103588,"(2014年真题）为了有效控制建设工程质量、造价、进度三大目标，可采取的技术措施是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":29},"审查、论证建设工程施工方案",{"key":24,"text":149,"correct":22},"动态跟踪建设工程合同执行情况",{"key":27,"text":151,"correct":22},"建立建设工程目标控制工作考评机制",{"key":31,"text":153,"correct":22},"进行建设工程变更方案的技术经济分析",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1103589,"(2014年真题）根据《建设工程监理规范》（GB\u002FT 50319-2013），项目监理机构应审查施工单位报审的专项施工方案，符合要求的，应由总监理工程师签认后报（ ）。",[158,160,161,163],{"key":20,"text":159,"correct":22},"政府主管部门",{"key":24,"text":87,"correct":29},{"key":27,"text":162,"correct":22},"安全生产监督机构",{"key":31,"text":164,"correct":22},"工程监理单位",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},1103590,"(2015年真题）（ ）是指项目监理机构对施工单位进行的涉及结构安全的试块、试件及工程材料现场取样、封样、送检工作的监督活动。",[169,171,173,175],{"key":20,"text":170,"correct":22},"旁站",{"key":24,"text":172,"correct":29},"见证取样",{"key":27,"text":174,"correct":22},"巡视",{"key":31,"text":176,"correct":22},"平行检验",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":27,"analysis":33},1103591,"(2016年真题）根据工程实际进展安排工程监理人员及时进场或退场的关键是抓好监理人员的（ ）环节。",[181,183,185,187],{"key":20,"text":182,"correct":22},"招聘",{"key":24,"text":184,"correct":22},"培训",{"key":27,"text":186,"correct":29},"调度",{"key":31,"text":188,"correct":22},"委任",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":27,"analysis":33},1103592,"(2016年真题）工程暂停施工原因消失，具备复工条件时，关于复工审批或指令的说法，正确的是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"施工单位提出复工申请的，专业监理工程师应签发工程复工令",{"key":24,"text":196,"correct":22},"施工单位提出复工申请的，建设单位应及时签发工程复工令",{"key":27,"text":198,"correct":29},"施工单位未提出复工申请的，总监理工程师可指令施工单位恢复施工",{"key":31,"text":200,"correct":22},"施工单位未提出复工申请的，建设单位应及时指令施工单位恢复施工",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":20,"analysis":33},1103593,"(2016年真题）建立工程目标控制工作考评机制，加强各部门之间的沟通协作，属于目标控制措施中的（ ）措施。",[205,207,209,211],{"key":20,"text":206,"correct":29},"组织",{"key":24,"text":208,"correct":22},"技术",{"key":27,"text":210,"correct":22},"合同",{"key":31,"text":212,"correct":22},"经济",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},1103594,"(2016年真题）设计信息分发制度时，一般不考虑的因素是（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"信息分发的内容、数量、范围、数据来源",{"key":24,"text":220,"correct":22},"提供信息的介质",{"key":27,"text":222,"correct":22},"分发信息的数据结构、类型、精度和格式",{"key":31,"text":224,"correct":29},"信息使用部门的使用目的和使用要求",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":24,"analysis":33},1103595,"(2016年真题）关于建设工程质量、进度和造价三大目标的说法，正确的是（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"应形成“自上而下层层展开、自上而下层层保证”的质量、进度和造价目标体系",{"key":24,"text":232,"correct":29},"应将建设工程总目标分解，为质量、进度和造价目标动态控制奠定基础",{"key":27,"text":234,"correct":22},"在不同的建设工程中质量、进度和造价目标，应具有相同的优先等级",{"key":31,"text":236,"correct":22},"质量、进度和造价目标之间相互制约，应使每一个目标均达到最优",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},1103596,"(2016年真题）关于旁站的说法，错误的是（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"旁站记录是监理工程师依法行使有关签字权的重要依据",{"key":24,"text":244,"correct":29},"旁站是建设工程监理工作中用以监督工程目标实现的重要手段",{"key":27,"text":246,"correct":22},"旁站应在总监理工程师的指导下由现场监理人员负责具体实施",{"key":31,"text":248,"correct":22},"工程竣工验收后，工程监理单位应当将旁站记录存档备查",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},1103597,"(2017年真题）项目监理机构应签发《工程暂停令》的情形是（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":29},"施工单位未按审查通过的工程设计文件施工",{"key":24,"text":256,"correct":22},"施工单位未按审查通过的施工组织设计组织施工",{"key":27,"text":258,"correct":22},"施工过程中存在工程质量事故隐患",{"key":31,"text":260,"correct":22},"施工过程中出现不符合合同约定的行为",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},1103598,"(2017年真题）在分析论证建设工程总目标，寻求建设工程质量、造价和进度三大目标间最佳匹配关系时，应确保（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"进度目标符合建设工程合同工期",{"key":24,"text":268,"correct":29},"质量目标符合工程建设强制性标准",{"key":27,"text":270,"correct":22},"造价目标符合工程项目融资计划",{"key":31,"text":272,"correct":22},"进度、质量和造价目标均达到最优",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":27,"analysis":33},1103599,"(2016年真题）下列建设工程目标动态控制工作中，属于PDCA中检查工作的是（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"编制工程项目计划",{"key":24,"text":280,"correct":22},"实施工程项目计划",{"key":27,"text":282,"correct":29},"收集工程项目实施绩效",{"key":31,"text":284,"correct":22},"采取偏差纠正措施",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},1103600,"(2017年真题）对于工程项目而言，工程实际造价超出工程预算的原因之一是（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":29},"缺乏可靠的成本数据",{"key":24,"text":292,"correct":22},"项目管理要求高",{"key":27,"text":294,"correct":22},"设计图纸的标准高",{"key":31,"text":296,"correct":22},"设计选用新材料、新技术",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},1103601,"(2017年真题）对于施工单位提出涉及工程设计文件修改的工程变更，必要时应召开工程设计文件修改方案的专题论证会议，该会议的正确组织方式是（ ）。",[301,303,305,307],{"key":20,"text":302,"correct":22},"由设计单位组织，建设、施工和监理单位参加",{"key":24,"text":304,"correct":29},"由建设单位组织，设计、施工和监理单位参加",{"key":27,"text":306,"correct":22},"由施工单位组织，建设、设计和监理单位参加",{"key":31,"text":308,"correct":22},"由监理单位组织，建设、设计和施工单位参加",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":20,"analysis":33},1103602,"(2017年真题）关于见证取样的说法，正确的是（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":29},"项目监理机构应制定见证取样送检工作制度",{"key":24,"text":316,"correct":22},"计量认证分为国家级、省级和市级，实施的效力均完全一致",{"key":27,"text":318,"correct":22},"见证取样涉及建设方、施工方、监理方和检测方四方行为主体",{"key":31,"text":320,"correct":22},"检测单位需见证施工单位和项目管理机构的现场试样抽取",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":24,"analysis":33},1103603,"(2017年真题）关于项目监理机构和施工单位协调的说法，正确的是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"总监理工程师可以提出或接受任何变通办法以解决问题",{"key":24,"text":328,"correct":29},"总监理工程师应设计合理的奖罚机制协调进度和质量问题",{"key":27,"text":330,"correct":22},"施工单位采用不当方法施工时，监理工程师应立即签发停工令",{"key":31,"text":332,"correct":22},"分包合同履行中发生的索赔，应由分包单位根据总承包合同进行索赔",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":27,"analysis":33},1103605,"(2018年真题）根据《建设工程监理规范》，旁站是指项目监理机构对施工现场（ ）进行的监督活动。",[337,339,341,343],{"key":20,"text":338,"correct":22},"危险性较大的分部工程施工质量",{"key":24,"text":340,"correct":22},"危险性较大的分部工程施工安全",{"key":27,"text":342,"correct":29},"关键部位或关键工序施工质量",{"key":31,"text":344,"correct":22},"关键部位或关键工序施工安全",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":31,"analysis":33},1103606,"(2018年真题）关于第一次工地会议的说法，正确的是（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":22},"第一次工地会议应由总监理工程师组织召开",{"key":24,"text":352,"correct":22},"第一次工地会议应在总监理工程师下达开工令后召开",{"key":27,"text":354,"correct":22},"第一次工地会议的会议纪要由建设单位负责整理",{"key":31,"text":356,"correct":29},"第一次工地会议总监理工程师应介绍监理规划等相关内容",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},1103607,"(2018年真题）关于建设工程质量、造价、进度三大目标的说法，正确的是（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":22},"工程项目质量、造价、进度目标应以定性分析为主，定量分析为辅",{"key":24,"text":364,"correct":29},"建设工程三大目标中，应确保工程质量目标符合工程建设强制性标准",{"key":27,"text":366,"correct":22},"分析论证建设工程三大目标的匹配性时应以同等权重对待",{"key":31,"text":368,"correct":22},"建设工程三大目标的实现是指实现工程项目“质量优，投资省”的目标",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":31,"analysis":33},1103608,"(2018年真题）下列工程进度控制任务中，属于项目监理机构在施工阶段进度控制的任务是（ ）。",[373,375,377,379],{"key":20,"text":374,"correct":22},"编制工程建设总进度计划",{"key":24,"text":376,"correct":22},"依据进度控制纲要确定合同工期",{"key":27,"text":378,"correct":22},"进行工程项目建设目标论证",{"key":31,"text":380,"correct":29},"审查施工单位提交的进度计划",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":24,"analysis":33},1103609,"(2018年真题）项目监理机构处理工程索赔事宜是建设工程目标控制重要的（ ）措施。",[385,386,387,388],{"key":20,"text":208,"correct":22},{"key":24,"text":210,"correct":29},{"key":27,"text":212,"correct":22},{"key":31,"text":206,"correct":22},{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},1103615,"可以作为编制建设工程监理规划依据的是()。",[393,395,397,399],{"key":20,"text":394,"correct":22},"施工组织设计",{"key":24,"text":396,"correct":29},"施工合同",{"key":27,"text":398,"correct":22},"施工平面布置图",{"key":31,"text":400,"correct":22},"施工进度计划",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},1103616,"为使监理工作得到有关各方的理解与支持，编写监理规划时应充分听取()的意见。",[405,406,408,410],{"key":20,"text":87,"correct":29},{"key":24,"text":407,"correct":22},"设计单位",{"key":27,"text":409,"correct":22},"施工单位",{"key":31,"text":411,"correct":22},"工程质量监督机构",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":31,"analysis":33},1103617,"下列实行专业分包的工程中，专项施工方案不能由专业分包单位组织编制的有()。",[416,418,420,422],{"key":20,"text":417,"correct":22},"深基坑工程",{"key":24,"text":419,"correct":22},"附着式升降脚手架工程",{"key":27,"text":421,"correct":22},"起重机械安装拆卸工程",{"key":31,"text":423,"correct":29},"高大模板工程",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":31,"analysis":33},1103622,"根据《建设工程监理规范》GB／T 50319—2013，监理规划的编制时间为()。",[428,430,432,434],{"key":20,"text":429,"correct":22},"接到监理中标通知书及签订建设工程监理合同后",{"key":24,"text":431,"correct":22},"签订建设工程监理合同及收到施工组织设计文件后",{"key":27,"text":433,"correct":22},"接到监理投标邀请书及递交监理投标文件前",{"key":31,"text":435,"correct":29},"签订建设工程监理合同及收到设计文件后",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},1103628,"下列工作制度中，仅属于相关服务工作制度的是()。",[440,442,444,446],{"key":20,"text":441,"correct":22},"设计交底制度",{"key":24,"text":443,"correct":29},"设计方案评审制度",{"key":27,"text":445,"correct":22},"设计变更处理制度",{"key":31,"text":447,"correct":22},"施工图纸会审制度",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":27,"analysis":33},1103629,"下列工程目标控制任务中，不属于工程质量控制任务的是()。",[452,454,456,458],{"key":20,"text":453,"correct":22},"审查施工组织设计及专项施工方案",{"key":24,"text":455,"correct":22},"审查工程中使用的新技术、新工艺",{"key":27,"text":457,"correct":29},"分析比较实际完成工程量与计划工程量",{"key":31,"text":459,"correct":22},"复核施工控制测量成果及保护措施",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":27,"analysis":33},1103630,"根据《建设工程监理规范》，监理规划应()。",[464,466,468,470],{"key":20,"text":465,"correct":22},"在签订委托监理合同后开始编制，并应在召开第一次工地会议前报送建设单位",{"key":24,"text":467,"correct":22},"在签订委托监理合同后开始编制，并应在工程开工前报送建设单位",{"key":27,"text":469,"correct":29},"在签订委托监理合同及收到设计文件后开始编制，并应在召开第一次工地会议前报送建设单位",{"key":31,"text":471,"correct":22},"在签订委托监理合同及收到设计文件后开始编制，并应在工程开工前报送建设单位",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},1103644,"根据《建设工程监理规范》GB\u002FT50319-2013，监理实施细则应符合监理规划要求，并应结合工程专业特点，做到详细具体，具有（ ）。",[476,478,480,482],{"key":20,"text":477,"correct":29},"可操作性",{"key":24,"text":479,"correct":22},"指导性",{"key":27,"text":481,"correct":22},"可实施性",{"key":31,"text":483,"correct":22},"针对性",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":31,"analysis":33},1103645,"根据《建设工程监理规范》GB\u002FT50319-2013，监理规划是针对具体工程项目编写的，而工程项目的（ ）决定了监理规划的具体可变性。",[488,490,492,494],{"key":20,"text":489,"correct":22},"时效性",{"key":24,"text":491,"correct":22},"适用性",{"key":27,"text":493,"correct":22},"阶段性",{"key":31,"text":495,"correct":29},"动态性",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":31,"analysis":33},1103646,"下列不属于建设工程社会和经济条件方面资料的是（ ）。",[500,502,504,506],{"key":20,"text":501,"correct":22},"金融市场情况",{"key":24,"text":503,"correct":22},"建设工程所在地人文环境",{"key":27,"text":505,"correct":22},"基础设施",{"key":31,"text":507,"correct":29},"自然灾害发生情况",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":27,"analysis":33},1103647,"根据《建设工程监理规范》GB\u002FT50319-2013，下列不属于反映当地工程建设法规及政策方面资料的是（ ）。",[512,514,516,518],{"key":20,"text":513,"correct":22},"工程建设程序",{"key":24,"text":515,"correct":22},"有关法律法规及政策",{"key":27,"text":517,"correct":29},"当地交通、能源和市政公用设施的资料",{"key":31,"text":519,"correct":22},"工程造价管理制度",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":31,"analysis":33},1103648,"根据《建设工程监理规范》GB\u002FT 50319-2013，下列属于项目监理机构内部工作制度的是（ ）。",[524,526,528,530],{"key":20,"text":525,"correct":22},"隐蔽工程验收、分项（部）工程质量验收制度",{"key":24,"text":527,"correct":22},"单位工程验收、单项工程验收制度",{"key":27,"text":529,"correct":22},"平行检验、见证取样、巡视检查和旁站制度",{"key":31,"text":531,"correct":29},"监理周报、月报制度",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":27,"analysis":33},1103649,"关于建设工程设计阶段，监理单位需要建立的制度包括的是（ ）。",[536,538,540,542],{"key":20,"text":537,"correct":22},"设计招标管理制度",{"key":24,"text":539,"correct":22},"工程估算审核制度",{"key":27,"text":541,"correct":29},"设计要求编写及审核制度",{"key":31,"text":543,"correct":22},"可行性研究报告评审制度",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":20,"analysis":33},1103650,"下列关于为完成施工阶段质量控制任务，项目监理机构需要做好工作的说法，错误的是（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":29},"审查确认施工总包单位及设计单位资格",{"key":24,"text":551,"correct":22},"检查施工机械和机具质量",{"key":27,"text":553,"correct":22},"检查工程材料、构配件、设备质量",{"key":31,"text":555,"correct":22},"协助建设单位做好施工现场准备工作，为施工单位提交合格的施工现场",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":27,"analysis":33},1103651,"根据《建设工程监理规范》(GBT 50319-2013)，不属于监理实施细则编写依据的是()。",[560,562,564,566],{"key":20,"text":561,"correct":22},"已批准的监理规划",{"key":24,"text":563,"correct":22},"施工组织设计，专项施工方案",{"key":27,"text":565,"correct":29},"工程外部环境调查资料",{"key":31,"text":567,"correct":22},"与专业工程相关的资料文件和技术资料",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":24,"analysis":33},1103652,"根据《建设工程监理规范》(GBT 50319-2013)，下列文件资料中，可作为监理实施细则编制依据的是()。",[572,574,576,578],{"key":20,"text":573,"correct":22},"工程质量评估报告",{"key":24,"text":575,"correct":29},"专项施工方案",{"key":27,"text":577,"correct":22},"已批准的可行性研究报告",{"key":31,"text":579,"correct":22},"监理月报",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":31,"analysis":33},1103653,"关于监理大纲、监理规划或监理实施细则的说法，正确的是()。",[584,586,588,590],{"key":20,"text":585,"correct":22},"监理大纲和监理规划均应依据监理合同的要求编写",{"key":24,"text":587,"correct":22},"监理规划和监理实施细则均应由监理单位技术负责人审批",{"key":27,"text":589,"correct":22},"委托监理的工程项目均应编制监理大纲、监理规划和监理实施细则",{"key":31,"text":591,"correct":29},"工程监理目标控制措施是监理大纲、监理规划和监理实施细则的必备内容",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":24,"analysis":33},1103662,"根据《建设工程监理规范》，下列内容中，不属于监理实施细则的是()。",[596,598,600,602],{"key":20,"text":597,"correct":22},"监理工作控制要点",{"key":24,"text":599,"correct":29},"监理工作组织制度",{"key":27,"text":601,"correct":22},"监理工作流程",{"key":31,"text":603,"correct":22},"监理工作方法",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":27,"analysis":33},1103667,"监理规划编制完成后，在报送前还应经()审核批准。",[608,610,612,614],{"key":20,"text":609,"correct":22},"总监理工程师",{"key":24,"text":611,"correct":22},"监理单位经营部门负责人",{"key":27,"text":613,"correct":29},"监理单位技术负责人",{"key":31,"text":615,"correct":22},"监理单位负责人",[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]