[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":571},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,14,50,2341,[13,34,46,58,70,82,94,102,114,126,138,150,162,174,186,194,206,215,227,239,247,258,269,281,293,305,313,325,337,346,355,367,379,391,399,411,423,431,443,452,460,472,484,495,507,515,523,535,547,559],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1103526,1,"单选题","项目监理机构在编制监理规划时，应制定旁站方案，明确旁站的范围、内容、程序和旁站人员职责等，现场监理人员必须按此执行并根据方案的要求，有（ ）地进行检查，将可能发生的工程质量问题和隐患加以消除。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","综合性",false,{"key":24,"text":25,"correct":26},"B","针对性",true,{"key":28,"text":29,"correct":22},"C","可操作性",{"key":31,"text":32,"correct":22},"D","指导性","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1103527,"在工程施工阶段，可以通过模拟施工，事先发现施工过程中存在的问题，这体现了BIM的()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"可视化",{"key":24,"text":41,"correct":26},"协调性",{"key":28,"text":43,"correct":22},"模拟性",{"key":31,"text":45,"correct":22},"优化性",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1103530,"对于工程项目而言，工程实际造价超出工程预算的原因之一是()。",[50,52,54,56],{"key":20,"text":51,"correct":26},"缺乏可靠的成本教据",{"key":24,"text":53,"correct":22},"项目管理要求高",{"key":28,"text":55,"correct":22},"设计图纸的标准高",{"key":31,"text":57,"correct":22},"设计选用新材料、新技术",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1103531,"下列选项中，可以体现建设工程三大目标之间对立关系的是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"适当增加投资数量，缩短工期，使工程项目尽早动用，投资尽早收回",{"key":24,"text":65,"correct":22},"适当提高建设工程功能要求和质量标准，能够节约工程项目动用后的运行费和维修费",{"key":28,"text":67,"correct":22},"制定科学合理的建设工程进度计划，不但可以缩短建设工期，而且有可能获得较好的工程质量和降低工程造价",{"key":31,"text":69,"correct":26},"如果要抢时间、争进度．以极短的时间完成建设工程，会增加投资或者使工程质量下降",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1103532,"见证取样通常涉及三方行为，下列选项中，这三方指的是()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"施工方、监理方和建设方",{"key":24,"text":77,"correct":22},"监理方、设计方和建设方",{"key":28,"text":79,"correct":22},"监理方、施工方和设计方",{"key":31,"text":81,"correct":26},"施工方、见证方和试验方",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1103533,"下列选项中，选定满意的施工单位及材料设备供应单位是属于( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"组织措施",{"key":24,"text":89,"correct":22},"技术措施",{"key":28,"text":91,"correct":22},"经济措施",{"key":31,"text":93,"correct":26},"合同措施",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1103534,"建设工程三大目标控制措施中，属于其他各类措施前提和保障的是()。",[98,99,100,101],{"key":20,"text":87,"correct":26},{"key":24,"text":89,"correct":22},{"key":28,"text":91,"correct":22},{"key":31,"text":93,"correct":22},{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":20,"analysis":33},1103535,"为了有效控制建设工程质量、造价、进度三大目标，可采取的技术措施是()。",[106,108,110,112],{"key":20,"text":107,"correct":26},"审查、论证建设工程施工方案",{"key":24,"text":109,"correct":22},"动态跟踪建设工程合同执行情况",{"key":28,"text":111,"correct":22},"建立建设工程目标控制工作考评机制",{"key":31,"text":113,"correct":22},"进行建设工程变更方案的技术经济分析",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":31,"analysis":33},1103536,"下列选项中，属于建设工程目标控制经济措施的是()。",[118,120,122,124],{"key":20,"text":119,"correct":22},"明确目标控制人员的任务和职能分工",{"key":24,"text":121,"correct":22},"提出多个不同的技术方案",{"key":28,"text":123,"correct":22},"分析不同合同之间的相互联系",{"key":31,"text":125,"correct":26},"投资偏差分析",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":20,"analysis":33},1103537,"专题会议是由总监理工程师或其授权的专业监理工程师主持或参加的，为解决工程监理过程中的工程专项问题而( )召开的会议。",[130,132,134,136],{"key":20,"text":131,"correct":26},"不定期",{"key":24,"text":133,"correct":22},"定期",{"key":28,"text":135,"correct":22},"每月",{"key":31,"text":137,"correct":22},"按建设单位要求组织",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":20,"analysis":33},1103538,"下列选项中，项目监理机构内部需求关系的协调主要是对()的平衡。",[142,144,146,148],{"key":20,"text":143,"correct":26},"监理人员需求",{"key":24,"text":145,"correct":22},"监理资金",{"key":28,"text":147,"correct":22},"监理地点",{"key":31,"text":149,"correct":22},"监理时间",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":24,"analysis":33},1103539,"根据《建设工程监理规范》，项目监理机构应审查施工单位报审的专项施工方案，符合要求的，应由总监理工程师签认后报()。",[154,156,158,160],{"key":20,"text":155,"correct":22},"政府主管部门",{"key":24,"text":157,"correct":26},"建设单位",{"key":28,"text":159,"correct":22},"安全生产监督机构",{"key":31,"text":161,"correct":22},"工程监理单位",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":24,"analysis":33},1103540,"建设工程监理组织协调方法中，最具有合同效力的是( )。",[166,168,170,172],{"key":20,"text":167,"correct":22},"访问协调法",{"key":24,"text":169,"correct":26},"书面协调法",{"key":28,"text":171,"correct":22},"情况介绍法",{"key":31,"text":173,"correct":22},"交谈协调法",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},1103541,"项目监理机构应根据工程的特点和具体情况，将材料进场报验、见证取样送检的范围、工作程序、见证人员和取样人员的职责、取样方法等内容纳入( )。",[178,180,182,184],{"key":20,"text":179,"correct":22},"监理规划",{"key":24,"text":181,"correct":26},"监理实施细则",{"key":28,"text":183,"correct":22},"见证取样送检工作制度",{"key":31,"text":185,"correct":22},"见证取样送检工作方案",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":31,"analysis":33},1103542,"下列选项中，适用于选择合理承发包模式和合同计价方式的措施是()。",[190,191,192,193],{"key":20,"text":87,"correct":22},{"key":24,"text":89,"correct":22},{"key":28,"text":91,"correct":22},{"key":31,"text":93,"correct":26},{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":31,"analysis":33},1103543,"监理人员实施旁站时，发现其施工活动已经或者可能危及工程质量的，旁站人员应当( )。",[198,200,202,204],{"key":20,"text":199,"correct":22},"采取各种应急措施",{"key":24,"text":201,"correct":22},"责令施工单位立即整改",{"key":28,"text":203,"correct":22},"下达局部暂停施工指令",{"key":31,"text":205,"correct":26},"及时向监理工程师或者总监理工程师报告",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":31,"analysis":33},1103544,"下列选项中，不属于BIM特点的是()。",[210,211,212,213],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":22},{"key":28,"text":43,"correct":22},{"key":31,"text":214,"correct":26},"互动性",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":24,"analysis":33},1103545,"建立建设工程目标控制工作考评机制，加强各单位(部门)之间的沟通协作，属于监理工作的()措施。",[219,221,223,225],{"key":20,"text":220,"correct":22},"合同",{"key":24,"text":222,"correct":26},"组织",{"key":28,"text":224,"correct":22},"技术",{"key":31,"text":226,"correct":22},"经济",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":20,"analysis":33},1103546,"为了确保施工工艺工序按施工方案进行、避免其他干扰正常施工的因素，应该采取()监理方式。",[231,233,235,237],{"key":20,"text":232,"correct":26},"旁站",{"key":24,"text":234,"correct":22},"巡视",{"key":28,"text":236,"correct":22},"见证取样",{"key":31,"text":238,"correct":22},"平行检验",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":24,"analysis":33},1103547,"在工程设计阶段，可应用BIM技术协调解决施工过程中建筑物内设施的碰撞问题，这体现了BIM的()特点。",[243,244,245,246],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":26},{"key":28,"text":43,"correct":22},{"key":31,"text":45,"correct":22},{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":20,"analysis":33},1103548,"一般情况下，总监理工程师签发工程暂停令，应事先征得()同意。",[251,252,254,256],{"key":20,"text":157,"correct":26},{"key":24,"text":253,"correct":22},"设计单位",{"key":28,"text":255,"correct":22},"施工单位",{"key":31,"text":257,"correct":22},"建设行政主管部门",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},1103549,"巡视监理人员认为发现的问题自己无法解决或无法判断是否能够解决时，应立即向()汇报。",[262,264,266,268],{"key":20,"text":263,"correct":26},"总监理工程师",{"key":24,"text":265,"correct":22},"专业监理工程师",{"key":28,"text":267,"correct":22},"监理单位技术负责人",{"key":31,"text":257,"correct":22},{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":28,"analysis":33},1103550,"根据《建设工程监理规范》GB／T 50319—2013，施工单位未经批准擅自施工的。总监理工程师应()。",[273,275,277,279],{"key":20,"text":274,"correct":22},"及时签发《监理通知单》",{"key":24,"text":276,"correct":22},"立即报告建设单位",{"key":28,"text":278,"correct":26},"及时签发《工程暂停令》",{"key":31,"text":280,"correct":22},"立即报告政府主管部门",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":20,"analysis":33},1103551,"关于平行检验的说法，下列选项中，正确的是()。",[285,287,289,291],{"key":20,"text":286,"correct":26},"平行检验是项目监理机构在施工阶段质量控制的重要工作之一",{"key":24,"text":288,"correct":22},"平行检验是指对工程实体的量测检验",{"key":28,"text":290,"correct":22},"平行检验人员应根据施工单位自检情况填写检验结论",{"key":31,"text":292,"correct":22},"平行检验是指项目经理机构对施工单位自检结论的核验",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":20,"analysis":33},1103552,"某监理公司承担了某工程项目施工阶段的监理任务，监理单位应收集的信息是()。",[297,299,301,303],{"key":20,"text":298,"correct":26},"进场设备的规格型号、保修记录",{"key":24,"text":300,"correct":22},"同类工程相关资料",{"key":28,"text":302,"correct":22},"拟建工程所在地信息",{"key":31,"text":304,"correct":22},"施工图设计审批文件",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},1103553,"为了防止偷工减料，应该采取的监理方式是()。",[309,310,311,312],{"key":20,"text":234,"correct":22},{"key":24,"text":232,"correct":26},{"key":28,"text":238,"correct":22},{"key":31,"text":236,"correct":22},{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":24,"analysis":33},1103554,"关于见证取样的说法，下列选项中，错误的是()。",[317,319,321,323],{"key":20,"text":318,"correct":22},"见证取样涉及的三方是指施工方、见证方和试验方",{"key":24,"text":320,"correct":26},"计量认证分为国家级、省级和县级三个等级",{"key":28,"text":322,"correct":22},"检测单位接受检验任务时须有送检单位的检验委托单",{"key":31,"text":324,"correct":22},"检测单位应在检验报告上加盖“有见证取样送检”印章",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":20,"analysis":33},1103555,"下列选项中，属于项目监理机构内部人际关系的协调的是()。",[329,331,333,335],{"key":20,"text":330,"correct":26},"在矛盾调解上要恰到好处",{"key":24,"text":332,"correct":22},"明确规定每个部门的目标",{"key":28,"text":334,"correct":22},"事先约定各个部门在工作中的相互关系",{"key":31,"text":336,"correct":22},"建立信息沟通制度",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":31,"analysis":33},1103556,"下列选项中，不属于项目监理机构组织协调方法的是()。",[341,343,344,345],{"key":20,"text":342,"correct":22},"会议协调法",{"key":24,"text":173,"correct":22},{"key":28,"text":169,"correct":22},{"key":31,"text":167,"correct":26},{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":28,"analysis":33},1103557,"下列选项中，属于项目监理机构对施工单位进行的涉及结构安全的试块、试件及工程材料现场取样、封样、送检工作的监督活动的是()。",[350,351,352,353],{"key":20,"text":232,"correct":22},{"key":24,"text":234,"correct":22},{"key":28,"text":236,"correct":26},{"key":31,"text":354,"correct":22},"施工监理",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":31,"analysis":33},1103558,"下列选项中，不属于监理机构索赔依据的是()。",[359,361,363,365],{"key":20,"text":360,"correct":22},"勘察设计文件",{"key":24,"text":362,"correct":22},"施工合同文件",{"key":28,"text":364,"correct":22},"工程建设标准",{"key":31,"text":366,"correct":26},"公司规章制度",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":28,"analysis":33},1103559,"因建设单位原因导致施工合同解除时，项目监理机构应按施工合同约定与建设单位和施工单位协商确定施工单位应得款项，并签发()。",[371,373,375,377],{"key":20,"text":372,"correct":22},"费用索赔报审表",{"key":24,"text":374,"correct":22},"工程暂停令",{"key":28,"text":376,"correct":26},"工程款支付证书",{"key":31,"text":378,"correct":22},"工程临时或最终延期报审表",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":24,"analysis":33},1103560,"见证取样过程中，见证人不得少于（ ）人。",[383,385,387,389],{"key":20,"text":384,"correct":22},"1",{"key":24,"text":386,"correct":26},"2",{"key":28,"text":388,"correct":22},"3",{"key":31,"text":390,"correct":22},"5",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":24,"analysis":33},1103561,"()是指项目监理机构在施工单位自检的同时，按照有关规定、建设工程监理合同约定对同一检验项目进行的检测试验活动。",[395,396,397,398],{"key":20,"text":234,"correct":22},{"key":24,"text":238,"correct":26},{"key":28,"text":232,"correct":22},{"key":31,"text":236,"correct":22},{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":24,"analysis":33},1103562,"见证取样的实验报告中发生试样不合格情况，应在()小时内上报质监站，并建立不合格项目台账。",[403,405,407,409],{"key":20,"text":404,"correct":22},"12",{"key":24,"text":406,"correct":26},"24",{"key":28,"text":408,"correct":22},"36",{"key":31,"text":410,"correct":22},"72",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":28,"analysis":33},1103563,"如果要减少投资、节约费用，势必会考虑降低工程项目的功能要求和质量标准，这表明投资目标与进度目标存在（ ）关系。",[415,417,419,421],{"key":20,"text":416,"correct":22},"既不对立又不统一",{"key":24,"text":418,"correct":22},"既对立又统一",{"key":28,"text":420,"correct":26},"对立",{"key":31,"text":422,"correct":22},"统一",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":31,"analysis":33},1103564,"选择对目标控制有利的承发包模式，是建设工程目标控制的（ ）措施。",[427,428,429,430],{"key":20,"text":222,"correct":22},{"key":24,"text":224,"correct":22},{"key":28,"text":226,"correct":22},{"key":31,"text":220,"correct":26},{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":31,"analysis":33},1103565,"下列关于工程建设不同阶段项目监理机构信息收集的表述中，错误的是()。",[435,437,439,441],{"key":20,"text":436,"correct":22},"施工期应收集施工项目管理机构管理程序等信息",{"key":24,"text":438,"correct":22},"施工招投标阶段应收集工程设计及概算文件等信息",{"key":28,"text":440,"correct":22},"设计阶段应收集拟建工程所在地政府部门相关规定等信息",{"key":31,"text":442,"correct":26},"施工期应收集与建设工程相关的市场、资源等信息",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":31,"analysis":33},1103566,"总监理工程师签发工程暂停令，应事先征得()同意。",[447,449,450,451],{"key":20,"text":448,"correct":22},"监理单位",{"key":24,"text":265,"correct":22},{"key":28,"text":255,"correct":22},{"key":31,"text":157,"correct":26},{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":31,"analysis":33},1103567,"选择合理的承发包模式和合同计价方式是目标控制的( )",[456,457,458,459],{"key":20,"text":87,"correct":22},{"key":24,"text":89,"correct":22},{"key":28,"text":91,"correct":22},{"key":31,"text":93,"correct":26},{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":20,"analysis":33},1103568,"下列关于巡视的内容中，需要在监理规划中体现的是()。",[464,466,468,470],{"key":20,"text":465,"correct":26},"巡视方案",{"key":24,"text":467,"correct":22},"巡视要点",{"key":28,"text":469,"correct":22},"巡视频率",{"key":31,"text":471,"correct":22},"巡视措施",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},1103569,"下列选项中，属于建设工程目标控制合同措施的是()。",[476,478,480,482],{"key":20,"text":477,"correct":26},"选择合理的承发包模式和合同计价方式",{"key":24,"text":479,"correct":22},"编制和实施资金使用计划",{"key":28,"text":481,"correct":22},"对各种技术数据进行审核、比较",{"key":31,"text":483,"correct":22},"加强动态控制中的激励措施",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":24,"analysis":33},1103570,"下列选项中，属于三大目标控制措施中合同措施的是()。",[488,490,491,493],{"key":20,"text":489,"correct":22},"调整控制人员的分工",{"key":24,"text":477,"correct":26},{"key":28,"text":492,"correct":22},"要求施工单位增加施工机械，并给予合理的补偿",{"key":31,"text":494,"correct":22},"修改技术方案",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":20,"analysis":33},1103571,"为完成施工阶段进度控制任务，项目监理机构需要做的工作是（ ）。",[499,501,503,505],{"key":20,"text":500,"correct":26},"组织进度协调会议，协调有关各方关系",{"key":24,"text":502,"correct":22},"审查确认施工分包单位资格",{"key":28,"text":504,"correct":22},"审查施工组织设计",{"key":31,"text":506,"correct":22},"严格进行付款控制",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":24,"analysis":33},1103572,"建立建设工程目标控制工作考评机制，加强各单位（部门）之间的沟通协作，属于三大目标控制措施中的（ ）措施。",[511,512,513,514],{"key":20,"text":220,"correct":22},{"key":24,"text":222,"correct":26},{"key":28,"text":224,"correct":22},{"key":31,"text":226,"correct":22},{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":20,"analysis":33},1103573,"下列属于项目监理机构内部人际关系协调工作的是（ ）。",[519,520,521,522],{"key":20,"text":330,"correct":26},{"key":24,"text":332,"correct":22},{"key":28,"text":334,"correct":22},{"key":31,"text":336,"correct":22},{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},1103574,"（2020年真题）下列建设工程质量、造价、进度三大目标之间相互关系中，属于对立关系的是（ ）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"通过加快建设进度，尽早发挥投资效益",{"key":24,"text":530,"correct":26},"通过增加赶工措施费，加快工程建设进度",{"key":28,"text":532,"correct":22},"通过提高功能要求，大幅度提高投资效益",{"key":31,"text":534,"correct":22},"通过控制工程质量，减少返工费用",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":28,"analysis":33},1103575,"（2020年真题）项目监理机构履行建设工程安全生产管理的监理职责时，进行的工作是（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":22},"组织施工总承包单位和分包单位验收施工起重机械",{"key":24,"text":542,"correct":22},"编制安全生产管理的专项监理规划和监理实施细则",{"key":28,"text":544,"correct":26},"核查相关施工机械和设施的安全许可验收手续",{"key":31,"text":546,"correct":22},"组织编制危险性较大的分部分项工程专项施工方案",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":31,"analysis":33},1103576,"（2020年真题）工程监理人员在施工现场巡视时，应主要关注（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"施工人员展职情况",{"key":24,"text":554,"correct":22},"施工质量和施工进度",{"key":28,"text":556,"correct":22},"施工进度和安全生产",{"key":31,"text":558,"correct":26},"施工质量和安全生产",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":24,"analysis":33},1103577,"（2020年真题）应用建筑信息建模（BIM）技术进行工程造价控制时，需要建立（ ）模型。",[563,565,567,569],{"key":20,"text":564,"correct":22},"BIM6D",{"key":24,"text":566,"correct":26},"BIM5D",{"key":28,"text":568,"correct":22},"BIM4D",{"key":31,"text":570,"correct":22},"BIM3D",[572,575,578,581,584,587],{"id":15,"name":573,"category":7,"favorite":574},"领导干部任职前廉政法规知识测试题",92,{"id":576,"name":577,"category":7,"favorite":15},595,"建筑结构与设备",{"id":579,"name":580,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":582,"name":583,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":585,"name":586,"category":7,"favorite":8},534,"BIM工程师",{"id":588,"name":586,"category":7,"favorite":8},535]