[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,13,50,2341,[13,34,46,58,70,82,94,106,116,128,140,151,163,175,187,199,209,221,233,244,253,261,273,285,297,307,319,331,343,355,367,379,391,400,409,421,433,445,457,468,480,492,503,515,527,539,551,563,575,587],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1103437,1,"单选题","项目监理机构应发出监理通知单的情形是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","施工单位违反工程建设强制性标准的",false,{"key":24,"text":25,"correct":22},"B","施工单位未经批准擅自施工或拒绝项目监理机构管理的",{"key":27,"text":28,"correct":29},"C","施工单位在施工过程中出现不符合工程建设标准性或合同约定的",true,{"key":31,"text":32,"correct":22},"D","施工单位的施工存在重大质量.安全事故隐患的","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1103438,"下列关于工程监理基本表式应用说明基本要求的说法中，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"各类表式的编号可以不连续，但是不得重号",{"key":24,"text":41,"correct":22},"由施工单位提供附件的，应在附件首页加盖公章",{"key":27,"text":43,"correct":29},"项目监理机构用章的样章应在建设单位和施工单位备案",{"key":31,"text":45,"correct":22},"应按有关规定，采用碳素墨水.纯蓝墨水书写或黑色碳素印墨打印各类表，不得使用易褪色的书写材料",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1103439,"（2020年真题）根据《建设工程监理规范》，需要由总监理工程师签字并加盖执业印章的监理文件是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"分部工程报验表",{"key":24,"text":53,"correct":22},"工程原材料报验表",{"key":27,"text":55,"correct":22},"隐蔽工程报表",{"key":31,"text":57,"correct":29},"费用索赔报审表",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1103440,"（2020年真题）根据《建设工程监理规范》》项目监理机构应签发监理通知单的情形是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"施工单位未经批准擅自施工的",{"key":24,"text":65,"correct":22},"施工单位未按审查通过的工程设计文件施工的",{"key":27,"text":67,"correct":22},"施工存在重大质量、安全事故隐患的",{"key":31,"text":69,"correct":29},"施工单位使用不合格的工程材料、构配件和设备的",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1103441,"(2009年真题）《工程临时或最终延期报审表》应由（ ）签字。",[74,76,78,80],{"key":20,"text":75,"correct":22},"监理单位技术负责人",{"key":24,"text":77,"correct":22},"监理单位法定代表人",{"key":27,"text":79,"correct":29},"总监理工程师",{"key":31,"text":81,"correct":22},"专业监理工程师",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1103442,"(2009年真题）下列单位中，不能使用工程变更单的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"建设单位",{"key":24,"text":89,"correct":22},"监理单位",{"key":27,"text":91,"correct":22},"施工单位",{"key":31,"text":93,"correct":29},"检测单位",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1103443,"(2015年真题）根据《建设工程监理规范》（GB\u002FT 50319-2013），关于项目监理机构文件资料管理职责的说法，错误的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"应建立和完善监理文件资料管理制度，宜设专人管理监理文件资料",{"key":24,"text":101,"correct":29},"应及时整理、分类汇总监理文件资料，并按分项工程组卷存放",{"key":27,"text":103,"correct":22},"应及时收集、整理、编制、传递监理文件资料",{"key":31,"text":105,"correct":22},"应根据工程特点和有关规定保存监理档案，并向有关单位、部门移交",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1103444,"(2014年真题）根据《建设工程监理规范》(GBT 50319-2013)，下列施工单位报审、报验用表中，需要由专业监理工程师审查，再由总监理工程师签署意见的是（ ）",[110,112,113,114],{"key":20,"text":111,"correct":22},"单位工程竣工报审表",{"key":24,"text":57,"correct":22},{"key":27,"text":51,"correct":29},{"key":31,"text":115,"correct":22},"工程材料、构配件、设备报审表",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":20,"analysis":33},1103445,"(2013年真题）列入城建档案管理部门档案接收范围的工程,建设单位应当在工程竣工验收后（ ）个月内,向当地城建档案管理部门移交一套符合规定的工程文件。",[120,122,124,126],{"key":20,"text":121,"correct":29},"3",{"key":24,"text":123,"correct":22},"6",{"key":27,"text":125,"correct":22},"9",{"key":31,"text":127,"correct":22},"12",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":20,"analysis":33},1103446,"(2011年真题）关于建设工程文件移交的说法，错误的是（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":29},"施工单位应将在工程建设过程中形成的文件向监理单位档案管理机构移交",{"key":24,"text":135,"correct":22},"监理单位应将在工程建设过程中形成的文件向建设单位档案管理机构移交",{"key":27,"text":137,"correct":22},"设计单位应将在工程建设过程中形成的文件向建设单位档案管理机构移交",{"key":31,"text":139,"correct":22},"建设单位应将汇总的建设工程文件档案向地方城建档案管理部门移交",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":31,"analysis":33},1103447,"(2015年真题）下列报审表中，需要由施工项目经理签字并加盖施工单位公章的是（ ）",[144,146,148,149],{"key":20,"text":145,"correct":22},"工程款支付报审表",{"key":24,"text":147,"correct":22},"工程复工报审表",{"key":27,"text":57,"correct":22},{"key":31,"text":150,"correct":29},"工程开工报审表",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":20,"analysis":33},1103449,"(2019年真题）关于建设工程监理文件资料组卷方法及要求的说法，正确的是（ ）",[155,157,159,161],{"key":20,"text":156,"correct":29},"图纸按专业排列，同专业图纸按图号顺序排列",{"key":24,"text":158,"correct":22},"监理文件资料可按建设单位、设计单位、施工单位分别组卷",{"key":27,"text":160,"correct":22},"既有文字材料又有图纸的案卷，图纸排前，文字材料排后",{"key":31,"text":162,"correct":22},"一个建设工程由多个单位工程组成时，应按施工进度节点组卷",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":24,"analysis":33},1103450,"(2018年真题）总监理工程师组织专业监理工程师审查施工单位报送的工程开工报审表及相关资料时，不属于审查内容的是（ ）。",[167,169,171,173],{"key":20,"text":168,"correct":22},"设计交底和图纸会审是否已完成",{"key":24,"text":170,"correct":29},"施工许可证是否已办理",{"key":27,"text":172,"correct":22},"施工单位质量管理体系是否已建立",{"key":31,"text":174,"correct":22},"施工组织设计是否已经过总监理工程审查签认",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},1103451,"(2018年真题）关于建设工程监理文件资料管理的说法，正确的是（ ）。",[179,181,183,185],{"key":20,"text":180,"correct":29},"监理文件资料有追溯性要求时，收文登记应注意核查所填内容是否可追溯",{"key":24,"text":182,"correct":22},"监理文件资料的收文登记人员应确定该文件资料是否要传阅及传阅范围",{"key":27,"text":184,"correct":22},"监理文件资料完成传阅程序后应按监理单位对项目检查的需要进行分类存放",{"key":31,"text":186,"correct":22},"监理文件资料应按施工总承包单位、分包单位和材料供应单位进行分类",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":31,"analysis":33},1103452,"(2018年真题）关于监理例会的说法，正确的是（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"监理例会可以由建设单位组织召开",{"key":24,"text":194,"correct":22},"监理例会的讨论内容是工程质量安全问题",{"key":27,"text":196,"correct":22},"监理例会的会议纪要由建设单位签发",{"key":31,"text":198,"correct":29},"监理例会的议定事项应有落实单位和时限要求",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":31,"analysis":33},1103453,"(2018年真题）根据《建设工程监理规范》，下列表式中，不需要总监理工程师加盖执业印章，但需要建设单位盖章的是（ ）。",[203,205,207,208],{"key":20,"text":204,"correct":22},"施工组织设计报审表",{"key":24,"text":206,"correct":22},"专项施工方案报审表",{"key":27,"text":150,"correct":22},{"key":31,"text":147,"correct":29},{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":24,"analysis":33},1103454,"(2017年真题）建设工程监理文件资料的组卷顺序是（ ）。",[213,215,217,219],{"key":20,"text":214,"correct":22},"分项工程、分部工程、单位工程",{"key":24,"text":216,"correct":29},"单位工程、分部工程、专业、阶段",{"key":27,"text":218,"correct":22},"单位工程、分部工程、检验批",{"key":31,"text":220,"correct":22},"检验批、分部工程、单位工程",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":20,"analysis":33},1103455,"(2017年真题）工程质量评估报告应在（ ）提交给建设单位。",[225,227,229,231],{"key":20,"text":226,"correct":29},"竣工验收前",{"key":24,"text":228,"correct":22},"竣工验收后",{"key":27,"text":230,"correct":22},"竣工预验收前",{"key":31,"text":232,"correct":22},"竣工验收备案后",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":20,"analysis":33},1103456,"(2017年真题）下列报审、报验表中，最终可由专业监理工程师签认的表式是（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":29},"施工控制测量成果报验表",{"key":24,"text":240,"correct":22},"施工进度计划报审表",{"key":27,"text":242,"correct":22},"分包单位资格报审表",{"key":31,"text":51,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":27,"analysis":33},1103457,"(2017年真题）下列建设工程监理基本表式中，需加盖施工单位公章的是（ ）。",[248,249,251,252],{"key":20,"text":145,"correct":22},{"key":24,"text":250,"correct":22},"工作联系单",{"key":27,"text":150,"correct":29},{"key":31,"text":147,"correct":22},{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":27,"analysis":33},1103458,"(2016年真题）下列报审、报验表中，应由总监理工程师签字并加盖执业印章的是（ ）。",[257,258,259,260],{"key":20,"text":51,"correct":22},{"key":24,"text":242,"correct":22},{"key":27,"text":57,"correct":29},{"key":31,"text":240,"correct":22},{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},1103459,"(2016年真题）关于建设工程监理文件资料卷内排列要求的说法，正确的是（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"请示在前，批复在后",{"key":24,"text":268,"correct":29},"主件在前，附件在后",{"key":27,"text":270,"correct":22},"定稿在前，印本在后",{"key":31,"text":272,"correct":22},"图纸在前，文字在后",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},1103460,"(2016年真题）关于工程质量评估报告的说法，正确的是（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":29},"工程质量评估报告应在正式竣工验收前提交建设单位",{"key":24,"text":280,"correct":22},"工程质量评估报告应由施工单位组织编制并经总监理工程师签认",{"key":27,"text":282,"correct":22},"工程质量评估报告是工程竣工验收后形成的主要验收文件之一",{"key":31,"text":284,"correct":22},"工程质量评估报告由专业监理工程师组织编制并经总监理工程师签认",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},1103461,"(2016年真题）关于监理文件资料暂时保管单位的说法，正确的是（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":29},"停建.缓建工程的监理文件资料暂由建设单位保管",{"key":24,"text":292,"correct":22},"停建.缓建工程的监理文件资料暂由监理单位保管",{"key":27,"text":294,"correct":22},"改建.扩建工程的监理文件资料由建设单位保管",{"key":31,"text":296,"correct":22},"改建.扩建工程的监理文件资料由监理单位保管",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},1103462,"(2015年真题）下列施工单位报审、报验用表中，需专业监理工程师提出审查意见后，总监理工程师审核签字的是（ ）",[301,302,304,305],{"key":20,"text":242,"correct":29},{"key":24,"text":303,"correct":22},"隐蔽工程报验表",{"key":27,"text":238,"correct":22},{"key":31,"text":306,"correct":22},"分项工程报验表",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":31,"analysis":33},1103463,"(2016年真题）根据《建设工程监理规范》，在工程报验时，不使用《____报验、报审表》的是（ ）。",[311,313,315,317],{"key":20,"text":312,"correct":22},"检验批报验",{"key":24,"text":314,"correct":22},"分项工程报验",{"key":27,"text":316,"correct":22},"隐蔽工程报验",{"key":31,"text":318,"correct":29},"分部工程报验",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":24,"analysis":33},1103472,"在建设工程实施过程中进行严格的质量控制，不仅可减少实施过程中的返工费用，而且可减少投入使用后的维修费用。这体现了建设工程质量目标和投资目标之间的()。",[323,325,327,329],{"key":20,"text":324,"correct":22},"对立关系",{"key":24,"text":326,"correct":29},"统一关系",{"key":27,"text":328,"correct":22},"对立统一关系",{"key":31,"text":330,"correct":22},"既不对立又不统一的关系",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},1103473,"关于建设工程质量、造价、进度三大目标的说法，正确的是()。",[335,337,339,341],{"key":20,"text":336,"correct":22},"工程项目质量、造价、进度目标应以定性分析为主，定量分析为辅",{"key":24,"text":338,"correct":29},"建设工程三大目标中，应确保工程质量目标符合工程建设强制性标准",{"key":27,"text":340,"correct":22},"分析论证建设工程三大目标的匹配性时应以同等权重对待",{"key":31,"text":342,"correct":22},"建设工程三大目标的实现是指实现工程项目“质量优、投资省”的目标",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":24,"analysis":33},1103474,"在分析论证建设工程总目标，寻求建设工程质量、造价和进度三大目标之间最佳匹配关系时，应确保()。",[347,349,351,353],{"key":20,"text":348,"correct":22},"进度目标符合建设工程合同工期",{"key":24,"text":350,"correct":29},"质量目标符合工程建设强制性标准",{"key":27,"text":352,"correct":22},"造价目标符合工程项目融资计划",{"key":31,"text":354,"correct":22},"进度、质量和造价目标均达到最优",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},1103475,"下列工程造价控制工作中，属于项目监理机构在施工阶段控制工程造价的工作内容是()。",[359,361,363,365],{"key":20,"text":360,"correct":29},"定期进行工程计量",{"key":24,"text":362,"correct":22},"审查工程概算",{"key":27,"text":364,"correct":22},"进行建设方案比选",{"key":31,"text":366,"correct":22},"进行投资方案论证",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":27,"analysis":33},1103476,"工程暂停施工原因消失，具备复工条件时，关于复工审批或指令的说法，正确的是()。",[371,373,375,377],{"key":20,"text":372,"correct":22},"施工单位提出复工申请的，专业监理工程师应签发工程复工令",{"key":24,"text":374,"correct":22},"施工单位提出复工申请的，建设单位应及时签发工程复工令",{"key":27,"text":376,"correct":29},"施工单位未提出复工申请的，总监理工程师可指令施工单位恢复施工",{"key":31,"text":378,"correct":22},"施工单位未提出复工申请的，建设单位应及时指令施工单位恢复施工",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":31,"analysis":33},1103477,"下列协调工作中，属于项目监理机构内部人际关系协调工作的是()。",[383,385,387,389],{"key":20,"text":384,"correct":22},"事先约定各个部门在工作中的相互关系",{"key":24,"text":386,"correct":22},"遵守信息沟通制度",{"key":27,"text":388,"correct":22},"平衡监理人员使用计划",{"key":31,"text":390,"correct":29},"委任工作职责分明",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":27,"analysis":33},1103478,"对于超过一定规模的危险性较大的分部分项工程的专项施工方案，需要由()组织召开专家论证会。",[395,396,398,399],{"key":20,"text":87,"correct":22},{"key":24,"text":397,"correct":22},"设计单位",{"key":27,"text":91,"correct":29},{"key":31,"text":89,"correct":22},{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":27,"analysis":33},1103479,"施工单位承租的机械设备和施工机具及配件使用前，应由施工总承包单位、分包单位、出租单位和()共同进行验收。",[404,405,406,408],{"key":20,"text":87,"correct":22},{"key":24,"text":89,"correct":22},{"key":27,"text":407,"correct":29},"安装单位",{"key":31,"text":93,"correct":22},{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":24,"analysis":33},1103490,"对于施工单位提出涉及工程设计文件修改的工程变更，必要时应召开工程设计文件修改方案的专题论证会议，该会议的正确组织方式是()。",[413,415,417,419],{"key":20,"text":414,"correct":22},"由设计单位组织，建设、施工和监理单位参加",{"key":24,"text":416,"correct":29},"由建设单位组织，设计、施工和监理单位参加",{"key":27,"text":418,"correct":22},"由施工单位组织，建设、设计和监理单位参加",{"key":31,"text":420,"correct":22},"由监理单位组织，建设、设计和施工单位参加",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":27,"analysis":33},1103491,"根据工程实际进展安排工程监理人员及时进场或退场的关键是抓好监理人员的()环节。",[425,427,429,431],{"key":20,"text":426,"correct":22},"招聘",{"key":24,"text":428,"correct":22},"培训",{"key":27,"text":430,"correct":29},"调度",{"key":31,"text":432,"correct":22},"委任",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":27,"analysis":33},1103499,"在建设工程监理过程中，监理人员的配备、调度和进退场计划等事宜属于监理机构内部（ ）关系的协调。",[437,439,441,443],{"key":20,"text":438,"correct":22},"人际",{"key":24,"text":440,"correct":22},"组织",{"key":27,"text":442,"correct":29},"需求",{"key":31,"text":444,"correct":22},"计划",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":31,"analysis":33},1103500,"下列工程进度控制任务中，属于项目监理机构在施工阶段控制进度的任务是()。",[449,451,453,455],{"key":20,"text":450,"correct":22},"编制工程建设总进度计划",{"key":24,"text":452,"correct":22},"依据进度控制纲要确定合同工期",{"key":27,"text":454,"correct":22},"进行工程项目建设目标论证",{"key":31,"text":456,"correct":29},"审查施工单位提交的进度计划",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":24,"analysis":33},1103501,"项目监理机构处理工程索赔事宜是建设工程目标控制重要的()措施。",[461,463,465,467],{"key":20,"text":462,"correct":22},"技术",{"key":24,"text":464,"correct":29},"合同",{"key":27,"text":466,"correct":22},"经济",{"key":31,"text":440,"correct":22},{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":20,"analysis":33},1103502,"在建设工程质量、造价、进度三大目标中，如果要抢时间、争进度，以极短的时间完成建设工程，势必会增加投资或者使工程质量下降，这主要是体现了三大目标之间的（ ）关系。",[472,474,476,478],{"key":20,"text":473,"correct":29},"对立",{"key":24,"text":475,"correct":22},"统一",{"key":27,"text":477,"correct":22},"分解",{"key":31,"text":479,"correct":22},"协调",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":24,"analysis":33},1103503,"根据《建设工程监理规范》（GB\u002FT 50319-2013），施工单位的下列行为中，总监理工程师应及时签发工程暂停令的是（ ）。",[484,486,488,490],{"key":20,"text":485,"correct":22},"未按专项施工方案施工",{"key":24,"text":487,"correct":29},"拒绝项目监理机构管理",{"key":27,"text":489,"correct":22},"未按施工组织设计施工",{"key":31,"text":491,"correct":22},"施工存在安全事故隐患",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":31,"analysis":33},1103504,"在分析论证建设工程总目标，寻求建设工程质量、造价和进度三大目标间最佳匹配关系时，应遵循的原则不包括（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":22},"确保建设工程质量目标符合工程建设强制性标准",{"key":24,"text":499,"correct":22},"定性分析与定量分析相结合",{"key":27,"text":501,"correct":22},"不同建设工程三大目标可具有不同的优先等级",{"key":31,"text":354,"correct":29},{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":31,"analysis":33},1103505,"设计信息分发制度时，一般不考虑的因素是（ ）。",[507,509,511,513],{"key":20,"text":508,"correct":22},"信息分发的内容、数量、范围、数据来源",{"key":24,"text":510,"correct":22},"提供信息的介质",{"key":27,"text":512,"correct":22},"分发信息的数据结构、类型、精度和格式",{"key":31,"text":514,"correct":29},"信息使用部门的使用目的和使用要求",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":24,"analysis":33},1103507,"关于旁站的说法，错误的是()。",[519,521,523,525],{"key":20,"text":520,"correct":22},"旁站记录是监理工程师依法行使有关签字权的重要依据",{"key":24,"text":522,"correct":29},"旁站是建设工程监理工作中用以监督工程目标实现的重要手段",{"key":27,"text":524,"correct":22},"旁站应在总监理工程师的指导下由现场监理人员负责具体实施",{"key":31,"text":526,"correct":22},"工程竣工验收后，工程监理单位应当将旁站记录存档备查",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":20,"analysis":33},1103508,"关于见证取样的说法，正确的是()。",[531,533,535,537],{"key":20,"text":532,"correct":29},"项目监理机构应制定见证取样送检工作制度",{"key":24,"text":534,"correct":22},"计量认证分为国家级、省级和市级，实施的效力均完全一致",{"key":27,"text":536,"correct":22},"见证取样涉及建设方、施工方、监理方和检测方四方行为主体",{"key":31,"text":538,"correct":22},"检测单位需见证施工单位和项目监理机构的现场试样抽取",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":31,"analysis":33},1103517,"关于项目监理机构巡视工作的说法，正确的是()。",[543,545,547,549],{"key":20,"text":544,"correct":22},"监理规划中应明确巡视要点和巡视措施",{"key":24,"text":546,"correct":22},"巡视检查内容以施工质量和进度检查为主",{"key":27,"text":548,"correct":22},"对巡视检查中发现的问题应报告总监理工程师解决",{"key":31,"text":550,"correct":29},"总监理工程师应检查监理人员巡视的工作成果",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":20,"analysis":33},1103522,"关于平行检验的说法，正确的是()。",[555,557,559,561],{"key":20,"text":556,"correct":29},"平行检验是项目监理机构控制施工质量的工作之一",{"key":24,"text":558,"correct":22},"平行检验是对工程实体的量测检验",{"key":27,"text":560,"correct":22},"平行检验人员应根据施工单位自检情况填写检验结论",{"key":31,"text":562,"correct":22},"平行检验是指项目监理机构对施工单位自检结论的核验",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":27,"analysis":33},1103523,"根据《建设工程监理规范》,旁站是指项目监理机构对施工现场()进行的监督活动。",[567,569,571,573],{"key":20,"text":568,"correct":22},"危险性较大的分部工程施工质量",{"key":24,"text":570,"correct":22},"危险性较大的分部工程施工安全",{"key":27,"text":572,"correct":29},"关键部位或关键工序施工质量",{"key":31,"text":574,"correct":22},"关键部位或关键工序施工安全",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":31,"analysis":33},1103524,"关于监理人员在巡视检查时，在安全生产方面应关注情况的说法，正确的是（ ）。",[579,581,583,585],{"key":20,"text":580,"correct":22},"天气情况是否适合施工作业",{"key":24,"text":582,"correct":22},"使用的工程材料、设备和构配件是否已检测合格",{"key":27,"text":584,"correct":22},"施工机具、设备的工作状态，周边环境是否有异常情况",{"key":31,"text":586,"correct":29},"安全生产、文明施工制度、措施落实情况",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":24,"analysis":33},1103525,"下列关于监理人员在巡视检查时，在施工质量方面应关注的情况包括的是（ ）。",[591,592,593,595],{"key":20,"text":586,"correct":22},{"key":24,"text":580,"correct":29},{"key":27,"text":594,"correct":22},"施工临时用电情况",{"key":31,"text":596,"correct":22},"危险性较大分部分项工程施工情况，重点关注是否按方案施工",[598,601,604,607,610,613],{"id":15,"name":599,"category":7,"favorite":600},"领导干部任职前廉政法规知识测试题",92,{"id":602,"name":603,"category":7,"favorite":15},595,"建筑结构与设备",{"id":605,"name":606,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":608,"name":609,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":611,"name":612,"category":7,"favorite":8},534,"BIM工程师",{"id":614,"name":612,"category":7,"favorite":8},535]