[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":578},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,12,50,2341,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,236,248,258,270,279,291,303,315,326,338,350,362,370,382,394,404,412,423,431,441,453,465,477,486,496,507,515,526,538,550,561,569],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1103353,1,"单选题","(2018年真题）下列风险等级图中，风险量大致相等的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","①②③",false,{"key":24,"text":25,"correct":22},"B","③⑥⑨",{"key":27,"text":28,"correct":29},"C","①⑤⑨",true,{"key":31,"text":32,"correct":22},"D","②⑤⑦","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1103354,"(2019年真题）关于工程勘察成果审查的说法，正确的是（ ）",[38,40,42,44],{"key":20,"text":39,"correct":29},"岩土工程勘察正确反映场地工程地质条件",{"key":24,"text":41,"correct":22},"详勘阶段的勘察成果应满足初步设计的深度要求",{"key":27,"text":43,"correct":22},"勘察报告应有完成单位的公章和法人代表签字",{"key":31,"text":45,"correct":22},"勘察评估报告由专业监理工程师组织编制",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1103355,"(2019年真题）下列损失控制的工作内容中，不属于灾难计划编制内容的是（ ）",[50,52,54,56],{"key":20,"text":51,"correct":22},"安全撤离现场人员",{"key":24,"text":53,"correct":22},"救援及处理伤亡人员",{"key":27,"text":55,"correct":29},"起草保险索赔报告",{"key":31,"text":57,"correct":22},"控制事故的进一步发展",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1103362,"《建设工程监理规范》规定，项目监理机构应审查施工单位报审的施工组织设计，符合要求的，()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"由专业监理工程师签认",{"key":24,"text":65,"correct":22},"由总监理工程师代表签认",{"key":27,"text":67,"correct":29},"由总监理工程师签认后报建设单位",{"key":31,"text":69,"correct":22},"由总监理工程师代表签认后报建设单位",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1103363,"总监理工程师组织专业监理工程师审查施工单位报送的工程开工报审表及相关资料时，不属于审查内容的是()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"设计交底和图纸会审是否已完成",{"key":24,"text":77,"correct":29},"施工许可证是否已办理",{"key":27,"text":79,"correct":22},"施工单位质量管理体系是否已建立",{"key":31,"text":81,"correct":22},"施工组织设计是否已经总监理工程师审查签认",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1103364,"下列报审、报验表中，最终可由专业监理工程师签认的表式是()。",[86,88,90,92],{"key":20,"text":87,"correct":29},"施工控制测量成果报验表",{"key":24,"text":89,"correct":22},"施工进度计划报审表",{"key":27,"text":91,"correct":22},"分包单位资格报审表",{"key":31,"text":93,"correct":22},"分部工程报验表",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1103365,"根据《建设工程监理规范》，下列表式中，不需要总监理工程师加盖执业印章，但需要建设单位盖章的是()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"施工组织设计报审表",{"key":24,"text":101,"correct":22},"专项施工方案报审表",{"key":27,"text":103,"correct":22},"工程开工报审表",{"key":31,"text":105,"correct":29},"工程复工报审表",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1103366,"工程质量评估报告应在()提交给建设单位。",[110,112,114,116],{"key":20,"text":111,"correct":29},"竣工验收前",{"key":24,"text":113,"correct":22},"竣工验收后",{"key":27,"text":115,"correct":22},"竣工预验收前",{"key":31,"text":117,"correct":22},"竣工验收备案后",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1103377,"关于监理例会的说法，正确的是()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"监理例会可以由建设单位组织召开",{"key":24,"text":125,"correct":22},"监理例会的讨论内容是工程质量安全问题",{"key":27,"text":127,"correct":22},"监理例会的会议纪要由建设单位签发",{"key":31,"text":129,"correct":29},"监理例会的议决事项应有落实单位和时限要求",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1103386,"下列工作用表中，属于监理单位用表的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"施工组织设计或（专项）施工方案报审表",{"key":24,"text":137,"correct":22},"监理通知回复单",{"key":27,"text":139,"correct":29},"工程款支付证书",{"key":31,"text":141,"correct":22},"单位工程竣工验收报审表",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1103387,"根据《建设工程监理规范》，关于项目监理机构文件资料监理职责的说法，错误的是()。",[146,148,150,152],{"key":20,"text":147,"correct":22},"应建立和完善监理文件资料管理制度，宜设专人管理监理文件资料",{"key":24,"text":149,"correct":29},"应及时整理、分类汇总监理文件资料，并按分项工程组卷存放",{"key":27,"text":151,"correct":22},"应及时收集、整理、编制、传递监理文件资料",{"key":31,"text":153,"correct":22},"应根据工程特点和有关规定保存监理档案，并向有关单位、部门移交",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1103388,"下列关于监理文件和档案收文与登记管理的表述中，正确的是()。",[158,160,162,164],{"key":20,"text":159,"correct":22},"所有收文最后都应由项目总监理工程师签字",{"key":24,"text":161,"correct":29},"经检查，文件档案资料各项内容填写和记录真实完整，由符合相关规定的责任人员签字认可",{"key":27,"text":163,"correct":22},"符合相关规定责任人员的签字可以盖章代替",{"key":31,"text":165,"correct":22},"有关工程建设照片注明拍摄日期后，交资料员处理",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1103389,"关于建设工程监理文件资料管理的说法，正确的是()。",[170,172,174,176],{"key":20,"text":171,"correct":29},"监理文件资料有追溯性要求时，收文登记应注意核查所填内容是否可追溯",{"key":24,"text":173,"correct":22},"监理文件资料的收文登记人员应确定该文件资料是否需传阅及传阅范围",{"key":27,"text":175,"correct":22},"监理文件资料完成传阅程序后应按监理单位对项目检查的需要进行分类存放",{"key":31,"text":177,"correct":22},"监理文件资料应按施工总承包单位，分包单位和材料供应单位进行分类",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},1103390,"对于列入城建档案管理部门接收档案的工程，负责移交工程档案资料的责任单位是()。",[182,184,186,188],{"key":20,"text":183,"correct":22},"施工单位",{"key":24,"text":185,"correct":22},"监理单位",{"key":27,"text":187,"correct":29},"建设单位",{"key":31,"text":189,"correct":22},"城建档案管理部门",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1103398,"建设工程监理文件资料的组卷顺序是()。",[194,196,198,200],{"key":20,"text":195,"correct":22},"分项工程、分部工程、单位工程",{"key":24,"text":197,"correct":29},"单位工程、分部工程、专业、阶段",{"key":27,"text":199,"correct":22},"单位工程、分部工程、检验批",{"key":31,"text":201,"correct":22},"检验批、分部工程、单位工程",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1103402,"下列选项中，无权签发《工作联系单》的人员是()。",[206,208,210,212],{"key":20,"text":207,"correct":22},"建设单位现场代表",{"key":24,"text":209,"correct":29},"施工单位项目技术负责人",{"key":27,"text":211,"correct":22},"工程监理单位项目总监理工程师",{"key":31,"text":213,"correct":22},"设计单位本工程设计负责人",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1103403,"下列选项中，关于工程监理基本表式应用说明的基本要求说法错误的是()。",[218,220,222,224],{"key":20,"text":219,"correct":22},"应依照合同文件、法律法规及标准等规定的程序和时限签发、报送、回复各类表",{"key":24,"text":221,"correct":29},"由施工单位提供附件的，应在附件上加盖公章",{"key":27,"text":223,"correct":22},"项目监理机构用章的样章应在建设单位和施工单位备案",{"key":31,"text":225,"correct":22},"应按有关规定，采用碳素墨水、蓝黑墨水书写或黑色碳素印墨打印各类表，不得使用易褪色的书写材料",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},1103404,"下列选项中，主要用于隐蔽工程、检验批、分项工程报验的是()。",[230,231,232,234],{"key":20,"text":87,"correct":22},{"key":24,"text":93,"correct":22},{"key":27,"text":233,"correct":22},"工程复工令",{"key":31,"text":235,"correct":29},"报验、报审表",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":27,"analysis":33},1103405,"下列选项中，需要在《施工组织设计或(专项)施工方案报审表》中签字，并加盖执业印章的是()。",[240,242,244,246],{"key":20,"text":241,"correct":22},"专业监理工程师",{"key":24,"text":243,"correct":22},"总监理工程师代表",{"key":27,"text":245,"correct":29},"总监理工程师",{"key":31,"text":247,"correct":22},"监理单位技术负责人",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":31,"analysis":33},1103406,"下列报审表中，需要由施工项目经理签字并加盖施工单位公章的是()。",[252,254,255,257],{"key":20,"text":253,"correct":22},"工程款支付报审表",{"key":24,"text":105,"correct":22},{"key":27,"text":256,"correct":22},"费用索赔报审表",{"key":31,"text":103,"correct":29},{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":27,"analysis":33},1103407,"下列选项中，编制工程质量评估报告的时间是()。",[262,264,266,268],{"key":20,"text":263,"correct":22},"分部工程验收合格后",{"key":24,"text":265,"correct":22},"工程竣工验收合格后",{"key":27,"text":267,"correct":29},"工程竣工预验收合格后",{"key":31,"text":269,"correct":22},"保修期过后",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":31,"analysis":33},1103408,"下列表式中，必须由项目经理签字并加盖施工单位公章的是( )。",[274,276,277,278],{"key":20,"text":275,"correct":22},"工程开工令",{"key":24,"text":89,"correct":22},{"key":27,"text":91,"correct":22},{"key":31,"text":141,"correct":29},{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":31,"analysis":33},1103409,"根据《建设工程文件归档规范》(GB\u002FT50328-2014)，建设单位可选择性归档保存的文件资料是( )。?",[283,285,287,289],{"key":20,"text":284,"correct":22},"分包单位资质报审表",{"key":24,"text":286,"correct":22},"竣工移交证书",{"key":27,"text":288,"correct":22},"监理规划",{"key":31,"text":290,"correct":29},"监理月报",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":20,"analysis":33},1103410,"《总监理工程师任命书》需要由工程监理单位( )签字，并加盖单位公章。",[295,297,299,301],{"key":20,"text":296,"correct":29},"法定代表人",{"key":24,"text":298,"correct":22},"技术负责人",{"key":27,"text":300,"correct":22},"主要负责人",{"key":31,"text":302,"correct":22},"项目监理机构",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":27,"analysis":33},1103411,"关于建设工程档案编制要求和组卷方法的说法，正确的是( )。",[307,309,311,313],{"key":20,"text":308,"correct":22},"文件资料应采用手写形式并使用档案规定用笔，手工签字",{"key":24,"text":310,"correct":22},"建设工程由多个单位工程组成时，应按分部工程组卷",{"key":27,"text":312,"correct":29},"案卷内不应有重份文件，印刷成册的工程文件应保持原状",{"key":31,"text":314,"correct":22},"既有文字材料又有图纸的案卷，应将图纸排前，文字材料排后",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":20,"analysis":33},1103412,"根据《建设工程监理规范》GB／T 50319-2013，下列监理文件资料中，需要由总监理工程师签字并加盖执业印章的是()。",[319,320,322,324],{"key":20,"text":139,"correct":29},{"key":24,"text":321,"correct":22},"监理通知单",{"key":27,"text":323,"correct":22},"旁站记录",{"key":31,"text":325,"correct":22},"监理报告",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":20,"analysis":33},1103413,"下列选项中，不属于建设工程监理文件资料填写依据的是()。",[330,332,334,336],{"key":20,"text":331,"correct":29},"绩效评价",{"key":24,"text":333,"correct":22},"工程合同",{"key":27,"text":335,"correct":22},"设计文件",{"key":31,"text":337,"correct":22},"工程施工质量验收标准",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":20,"analysis":33},1103414,"列入城建档案管理部门档案接收范围的工程，建设单位应当在工程竣工验收后()个月内，向当地城建档案管理部门移交一套符合规定的工程文件。",[342,344,346,348],{"key":20,"text":343,"correct":29},"3",{"key":24,"text":345,"correct":22},"1",{"key":27,"text":347,"correct":22},"6",{"key":31,"text":349,"correct":22},"5",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":27,"analysis":33},1103415,"关于工程质量评估报告的说法，正确的是()。",[354,356,358,360],{"key":20,"text":355,"correct":22},"工程质量评估报告应在正式竣工验收后报送建设单位",{"key":24,"text":357,"correct":22},"工程质量评估报告应在预验收合格后报送建设单位",{"key":27,"text":359,"correct":29},"工程质量评估报告应由总监理工程师组织专业监理工程师编写",{"key":31,"text":361,"correct":22},"工程质量评估报告由总监理工程师及监理单位法定代表人审核签认",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":27,"analysis":33},1103416,"《建设工程监理规范》GB／T 50319 2013规定，在施工过程中，监理例会会议纪要由( )根据会议记录整理，并经与会各方代表会签。",[366,367,368,369],{"key":20,"text":187,"correct":22},{"key":24,"text":183,"correct":22},{"key":27,"text":302,"correct":29},{"key":31,"text":241,"correct":22},{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},1103417,"工程监理文件资料组卷方法及要求中，文字材料按事项、专业顺序排列说法错误的是()。",[374,376,378,380],{"key":20,"text":375,"correct":29},"请示在前、批复在后",{"key":24,"text":377,"correct":22},"印本在前、定稿在后",{"key":27,"text":379,"correct":22},"主件在前、附件在后",{"key":31,"text":381,"correct":22},"同一事项的请示与批复、同一文件的印本与定稿、主件与附件不能分开",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},1103418,"下列选项中，不属于总监理工程师签发《工程开工令》应具备的条件的是()。",[386,388,390,392],{"key":20,"text":387,"correct":22},"设计交底和图纸会审已完成",{"key":24,"text":389,"correct":29},"施工组织设计已由专业监理工程师签认",{"key":27,"text":391,"correct":22},"进场道路及水、电、通信等已满足开工要求",{"key":31,"text":393,"correct":22},"施工单位现场质量、安全生产管理体系已建立，管理及施工人员已到位，施工机械具备使用条件，主要工程材料已落实",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},1103419,"短期保管是指工程档案保存()以下。",[398,400,401,403],{"key":20,"text":399,"correct":29},"10",{"key":24,"text":349,"correct":22},{"key":27,"text":402,"correct":22},"8",{"key":31,"text":343,"correct":22},{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":31,"analysis":33},1103420,"下列选项中，《施工控制测量成果报验表》由( )审查合格后予以签认。",[408,409,410,411],{"key":20,"text":245,"correct":22},{"key":24,"text":296,"correct":22},{"key":27,"text":298,"correct":22},{"key":31,"text":241,"correct":29},{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":20,"analysis":33},1103421,"下列选项中，属于建设单位必须归档保存的是()。",[416,418,420,422],{"key":20,"text":417,"correct":29},"工程延期审批表",{"key":24,"text":419,"correct":22},"旁站监理记录",{"key":27,"text":421,"correct":22},"外加剂试验报告",{"key":31,"text":290,"correct":22},{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":27,"analysis":33},1103422,"项目监理机构对施工单位申请的费用索赔事项进行审核并签署意见，下列选项中，经( )批准后方可作为支付索赔费用的依据。",[427,428,429,430],{"key":20,"text":245,"correct":22},{"key":24,"text":296,"correct":22},{"key":27,"text":187,"correct":29},{"key":31,"text":298,"correct":22},{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":20,"analysis":33},1103423,"下列施工单位报审、报验用表中，需专业监理工程师提出审查意见后，总监理工程师审核签字的是()。",[435,436,438,439],{"key":20,"text":91,"correct":29},{"key":24,"text":437,"correct":22},"隐蔽工程报验表",{"key":27,"text":87,"correct":22},{"key":31,"text":440,"correct":22},"分项工程报验表",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":31,"analysis":33},1103424,"下列选项中，不属于监理月报主要内容的是()。",[445,447,449,451],{"key":20,"text":446,"correct":22},"本月工程实施情况",{"key":24,"text":448,"correct":22},"本月监理工作情况",{"key":27,"text":450,"correct":22},"下月监理工作重点",{"key":31,"text":452,"correct":29},"监理工作总结",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":27,"analysis":33},1103425,"对建设工程档案编制质量的要求不包括（）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"工程文件的内容必须真实、准确，与工程实际相符",{"key":24,"text":460,"correct":22},"工程文件应字迹清楚、图样清晰，签字盖章手续完备",{"key":27,"text":462,"correct":29},"文件资料不能采用打印形式需使用档案规定用笔，手工签字",{"key":31,"text":464,"correct":22},"工程档案资料的缩微制品，必须按国家缩微标准制作",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},1103426,"对列入当地城建档案管理部门接收范围的工程，工程竣工验收后()，应向当地城建档案管理部门移交一套符合规定的工程档案。",[469,471,473,475],{"key":20,"text":470,"correct":22},"5个月内",{"key":24,"text":472,"correct":29},"3个月内",{"key":27,"text":474,"correct":22},"6个月内",{"key":31,"text":476,"correct":22},"1年内",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":27,"analysis":33},1103427,"列入城建档案管理部门接收范围的工程，建设单位在工程竣工验收后()个月内向城建档案管理部门移交一套符合规定的工程档案(监理文件资料)。",[481,482,484,485],{"key":20,"text":345,"correct":22},{"key":24,"text":483,"correct":22},"2",{"key":27,"text":343,"correct":29},{"key":31,"text":347,"correct":22},{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},1103428,"不需要建设单位审批同意的表式是（ ）。",[490,491,493,494],{"key":20,"text":253,"correct":22},{"key":24,"text":492,"correct":29},"专项施工方案",{"key":27,"text":256,"correct":22},{"key":31,"text":495,"correct":22},"工程临时或最终延期报审表",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":27,"analysis":33},1103429,"（）是项目监理机构在实施建设工程监理过程中，每日对建设工程监理工作及施工进展情况所做的记录。",[500,502,503,505],{"key":20,"text":501,"correct":22},"工程质量评估报告",{"key":24,"text":290,"correct":22},{"key":27,"text":504,"correct":29},"监理日志",{"key":31,"text":506,"correct":22},"监理例会",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":24,"analysis":33},1103430,"有权签发《工作联系单》的负责人不包括（ ）。",[511,512,513,514],{"key":20,"text":207,"correct":22},{"key":24,"text":209,"correct":29},{"key":27,"text":211,"correct":22},{"key":31,"text":213,"correct":22},{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":27,"analysis":33},1103431,"下列负责人中，无权签发《工作联系单》的是（ ）。",[519,520,522,524],{"key":20,"text":207,"correct":22},{"key":24,"text":521,"correct":22},"施工单位项目经理",{"key":27,"text":523,"correct":29},"工程监理单位项目总监理工程师代表",{"key":31,"text":525,"correct":22},"设计单位本工程负责人",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},1103432,"下列关于《监理通知回复单》应用的说法中，正确的是（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"一般由监理员签认，重大问题由专业监理工程师签认",{"key":24,"text":533,"correct":29},"一般由专业监理工程师签认，重大问题由总监理工程师签认",{"key":27,"text":535,"correct":22},"承包单位可对多份监理工程师通知单予以综合答复",{"key":31,"text":537,"correct":22},"由承包单位负责人对监理工程师通知单予以答复",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},1103433,"对于监理例会上意见不一致的重大问题，应()。",[542,544,546,548],{"key":20,"text":543,"correct":22},"将各方主要观点记入会议纪要中的“决议事项”",{"key":24,"text":545,"correct":22},"不形成会议纪要",{"key":27,"text":547,"correct":22},"将各方主要观点记入会议纪要中的“会议主要内容”",{"key":31,"text":549,"correct":29},"将各方的主要观点，特别是相互对立的意见记入“其他事项”中",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":27,"analysis":33},1103434,"总监理工程师签发《工程开工令》应具备的条件不包括()。",[554,555,557,559],{"key":20,"text":387,"correct":22},{"key":24,"text":556,"correct":22},"施工组织设计已由总监理工程师签认",{"key":27,"text":558,"correct":29},"进场道路及水、电、通信等已全部完成",{"key":31,"text":560,"correct":22},"施工单位现场质量、安全生产管理体系已建立",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":20,"analysis":33},1103435,"《工程开工令》需要由()签字，并加盖执业印章。",[565,566,567,568],{"key":20,"text":245,"correct":29},{"key":24,"text":296,"correct":22},{"key":27,"text":298,"correct":22},{"key":31,"text":241,"correct":22},{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":27,"analysis":33},1103436,"“工程临时或最终延期报审表”应由（ ）签字。",[573,575,576,577],{"key":20,"text":574,"correct":22},"监理单位负责人",{"key":24,"text":247,"correct":22},{"key":27,"text":245,"correct":29},{"key":31,"text":241,"correct":22},[579,582,585,588,591,594],{"id":15,"name":580,"category":7,"favorite":581},"领导干部任职前廉政法规知识测试题",92,{"id":583,"name":584,"category":7,"favorite":15},595,"建筑结构与设备",{"id":586,"name":587,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":589,"name":590,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":592,"name":593,"category":7,"favorite":8},534,"BIM工程师",{"id":595,"name":593,"category":7,"favorite":8},535]