[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":585},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,11,50,2341,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,186,198,210,222,234,243,255,267,279,291,303,312,324,333,345,357,365,375,387,396,408,420,428,440,452,464,472,484,492,504,516,526,538,550,561,573],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1103303,1,"单选题","下列选项中，不属于导致非计划性风险自留主要原因的是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","缺乏风险清单",true,{"key":24,"text":25,"correct":26},"B","风险识别失误",false,{"key":28,"text":29,"correct":26},"C","风险分析与评价失误",{"key":31,"text":32,"correct":26},"D","风险决策实施延误","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1103304,"风险评价方法中，最常用、最简单且易于应用的方式是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"调查打分法",{"key":24,"text":41,"correct":26},"蒙特卡洛模拟法",{"key":28,"text":43,"correct":26},"计划评审技术法",{"key":31,"text":45,"correct":26},"敏感性分析法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1103305,"按照风险影响范围，建设工程风险划分为( )",[50,52,54,56],{"key":20,"text":51,"correct":22},"局部风险和总体风险",{"key":24,"text":53,"correct":26},"可管理风险和不可管理风险",{"key":28,"text":55,"correct":26},"自然风险、社会风险、经济风险、法律风险和政治风险",{"key":31,"text":57,"correct":26},"建设单位的风险、设计单位的风险、施工单位的风险、工程监理单位的风险",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1103306,"（ ）是指完成项目计划中确定的工作以实现项目目标的一组过程。",[62,64,66,68],{"key":20,"text":63,"correct":26},"启动过程组",{"key":24,"text":65,"correct":26},"计划过程组",{"key":28,"text":67,"correct":22},"执行过程组",{"key":31,"text":69,"correct":26},"监控过程组",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1103307,"在工程设计过程中，工程监理单位应依据( )要求审查各专业、各阶段设计进度计划。",[74,76,78,80],{"key":20,"text":75,"correct":26},"设计合同及建设单位要求",{"key":24,"text":77,"correct":26},"设计任务书及项目总体计划",{"key":28,"text":79,"correct":22},"设计合同及项目总体计划",{"key":31,"text":81,"correct":26},"建设单位要求及项目总体计划",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1103308,"以下各等级的风险中，属于可接受风险的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"VL",{"key":24,"text":89,"correct":22},"L",{"key":28,"text":91,"correct":26},"M",{"key":31,"text":93,"correct":26},"H",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1103309,"下列选项中，工程监理单位在工程勘察过程中的服务不包括()。",[98,100,102,104],{"key":20,"text":99,"correct":26},"工程勘察方案的审查",{"key":24,"text":101,"correct":26},"工程勘察过程控制",{"key":28,"text":103,"correct":22},"工程设计成果审查",{"key":31,"text":105,"correct":26},"工程勘察现场及室内试验人员、设备及仪器的检查",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1103310,"风险管理的首要步骤是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"风险识别",{"key":24,"text":113,"correct":26},"风险分析与评价",{"key":28,"text":115,"correct":26},"风险对策的决策",{"key":31,"text":117,"correct":26},"风险对策的实施",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1103311,"下列选项中，工程设计进度计划的审查内容不包括()。",[122,124,126,128],{"key":20,"text":123,"correct":26},"计划中各个节点是否存在漏项",{"key":24,"text":125,"correct":22},"工程监理单位应审查设计单位提交的设计成果，并提出评估报告",{"key":28,"text":127,"correct":26},"出图节点是否符合建设工程总体计划进度节点要求",{"key":31,"text":129,"correct":26},"分析各阶段、各专业工种设计工作量和工作难度，并审查相应设计人员的配置安排是否合理",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1103312,"( )仅着重于流程本身，而无法显示发生问题的损失值或损失发生的概率。",[134,136,138,140],{"key":20,"text":135,"correct":26},"初始清单法",{"key":24,"text":137,"correct":26},"经验数据法",{"key":28,"text":139,"correct":26},"风险调查法",{"key":31,"text":141,"correct":22},"流程图法",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1103313,"工程设计概算、施工图预算的审查中，如果建设单位有限额设计要求，则应增加审查()。",[146,148,150,152],{"key":20,"text":147,"correct":26},"各类取费项目是否符合规定",{"key":24,"text":149,"correct":26},"工程量计算是否正确，有无漏算、重算和计算错误",{"key":28,"text":151,"correct":26},"工程设计概算和工程施工图预算的编制依据是否准确",{"key":31,"text":153,"correct":22},"设计概算和施工图预算是否控制在规定的范围以内",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1103314,"采用流程图法进行风险识别的关键是按建设工程实施全过程内在逻辑关系制成流程图，针对流程图中的( )进行调查和分析。",[158,160,162,164],{"key":20,"text":159,"correct":26},"关键组织或关键目标",{"key":24,"text":161,"correct":26},"关键主体或薄弱环节",{"key":28,"text":163,"correct":26},"关键阶段或关键步骤",{"key":31,"text":165,"correct":22},"关键环节和薄弱环节",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1103315,"工程监理单位在工程设计阶段为建设单位提供服务时，主要服务内容是()。",[170,172,174,176],{"key":20,"text":171,"correct":26},"编制工程设计任务书",{"key":24,"text":173,"correct":26},"编制工程设计方案",{"key":28,"text":175,"correct":26},"报审有关工程设计文件",{"key":31,"text":177,"correct":22},"协助建设单位组织专家对工程设计成果进行评审",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1103316,"下列选项中，建设工程风险按照风险影响范围划分为()。",[182,183,184,185],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":26},{"key":28,"text":57,"correct":26},{"key":31,"text":55,"correct":26},{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},1103317,"下列计划中，属于应急计划的是()。",[190,192,194,196],{"key":20,"text":191,"correct":26},"现场人员安全撤离计划",{"key":24,"text":193,"correct":22},"材料与设备采购调整计划",{"key":28,"text":195,"correct":26},"伤亡人员援救及处理计划",{"key":31,"text":197,"correct":26},"资产和环境损害控制计划",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":20,"analysis":33},1103318,"在建设工程风险初始清单中，应用规范不恰当属于技术风险中的()因素。",[202,204,206,208],{"key":20,"text":203,"correct":22},"设计",{"key":24,"text":205,"correct":26},"施工",{"key":28,"text":207,"correct":26},"人员",{"key":31,"text":209,"correct":26},"合同",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},1103319,"在各种风险对策中，预防损失的主要作用是()。",[214,216,218,220],{"key":20,"text":215,"correct":26},"中断风险源",{"key":24,"text":217,"correct":22},"降低损失发生的概率",{"key":28,"text":219,"correct":26},"降低损失的严重性",{"key":31,"text":221,"correct":26},"遏制损失的进一步发展",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":28,"analysis":33},1103320,"下列风险因素中，属于按照风险来源进行划分的是()。",[226,228,230,232],{"key":20,"text":227,"correct":26},"施工单位的风险",{"key":24,"text":229,"correct":26},"设计单位的风险",{"key":28,"text":231,"correct":22},"自然风险",{"key":31,"text":233,"correct":26},"建设单位的风险",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":20,"analysis":33},1103321,"下列选项中，不属于风险管理主要环节的是()。",[238,240,241,242],{"key":20,"text":239,"correct":22},"投机风险",{"key":24,"text":111,"correct":26},{"key":28,"text":113,"correct":26},{"key":31,"text":117,"correct":26},{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":31,"analysis":33},1103322,"下列选项中，不属于风险识别主要内容的是()。",[247,249,251,253],{"key":20,"text":248,"correct":26},"识别引起风险的主要因素",{"key":24,"text":250,"correct":26},"识别风险的性质",{"key":28,"text":252,"correct":26},"识别风险可能引起的后果",{"key":31,"text":254,"correct":22},"风险对策实施的监控",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":31,"analysis":33},1103323,"下列选项中，不属于风险因素等级值的是()。",[259,261,263,265],{"key":20,"text":260,"correct":26},"经常",{"key":24,"text":262,"correct":26},"很可能",{"key":28,"text":264,"correct":26},"偶然",{"key":31,"text":266,"correct":22},"一定",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":20,"analysis":33},1103324,"下列选项中，法律风险属于按照()划分。",[271,273,275,277],{"key":20,"text":272,"correct":22},"风险来源",{"key":24,"text":274,"correct":26},"风险涉及的当事人",{"key":28,"text":276,"correct":26},"风险可否管理",{"key":31,"text":278,"correct":26},"风险影响范围",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":31,"analysis":33},1103325,"建设工程风险的非保险转移的情形不包括( )",[283,285,287,289],{"key":20,"text":284,"correct":26},"建设单位将风险转移给对方当事人",{"key":24,"text":286,"correct":26},"施工单位进行工程分包",{"key":28,"text":288,"correct":26},"第三方担保",{"key":31,"text":290,"correct":22},"抵押担保",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":31,"analysis":33},1103326,"以一定方式中断风险源，使其不发生或不再发展，从而避免可能产生的潜在损失的风险对策是（ ）。",[295,297,299,301],{"key":20,"text":296,"correct":26},"损失控制",{"key":24,"text":298,"correct":26},"风险自留",{"key":28,"text":300,"correct":26},"风险转移",{"key":31,"text":302,"correct":22},"风险回避",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},1103327,"建设工程风险识别方法中，属于专家调查法的是（ ）。",[307,309,310,311],{"key":20,"text":308,"correct":22},"头脑风暴法",{"key":24,"text":139,"correct":26},{"key":28,"text":137,"correct":26},{"key":31,"text":135,"correct":26},{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":28,"analysis":33},1103328,"（2020年真题）根据项目管理知识体系（PMBOK），为成功完成项目对项目所需资源进行管理的工作过程称为（ ）。",[316,318,320,322],{"key":20,"text":317,"correct":26},"项目集成管理",{"key":24,"text":319,"correct":26},"项目范围管理",{"key":28,"text":321,"correct":22},"项目资源管理",{"key":31,"text":323,"correct":26},"项目风险管理",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":28,"analysis":33},1103329,"（2020年真题）工程风险管理中，分析与评价工程风险可采用的方法是（ ）。",[328,330,331,332],{"key":20,"text":329,"correct":26},"财务报表法",{"key":24,"text":141,"correct":26},{"key":28,"text":45,"correct":22},{"key":31,"text":137,"correct":26},{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":31,"analysis":33},1103330,"（2020年真题）实施工程监理与项目管理一体化的前提是（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":26},"工程监理单位人员素质高",{"key":24,"text":340,"correct":26},"工程监理单位管理手段先进",{"key":28,"text":342,"correct":26},"施工单位的信任和支持",{"key":31,"text":344,"correct":22},"建设单位的信任和支持",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":28,"analysis":33},1103331,"(2015年真题）下列关于建设工程监理与项目管理服务的比较中，说法正确的是（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":26},"两者均是为业主服务，服务的范围相同",{"key":24,"text":352,"correct":26},"服务范围不同，但服务性质相同",{"key":28,"text":354,"correct":22},"服务范围不同，服务侧重点也不同",{"key":31,"text":356,"correct":26},"两者均是为业主服务，服务性质相同",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},1103332,"(2015年真题）下列计划中，属于应急计划的是（ ）。",[361,362,363,364],{"key":20,"text":191,"correct":26},{"key":24,"text":193,"correct":22},{"key":28,"text":195,"correct":26},{"key":31,"text":197,"correct":26},{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":28,"analysis":33},1103333,"(2015年真题）建设工程风险识别方法中，不属于专家调查法的是（ ）。",[369,370,372,373],{"key":20,"text":308,"correct":26},{"key":24,"text":371,"correct":26},"德尔菲法",{"key":28,"text":137,"correct":22},{"key":31,"text":374,"correct":26},"访谈法",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":20,"analysis":33},1103334,"(2015年真题）建设工程风险识别是由若干工作构成的过程，最主要成果是（ ）。",[379,381,383,385],{"key":20,"text":380,"correct":22},"风险清单",{"key":24,"text":382,"correct":26},"识别建设工程风险因素",{"key":28,"text":384,"correct":26},"建设工程风险分解",{"key":31,"text":386,"correct":26},"识别建设工程风险事件及其后果",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":28,"analysis":33},1103335,"(2011年真题）根据保险公司公布的潜在损失一览表，对建设工程风险进行识别的方法是（ ）。",[391,393,394,395],{"key":20,"text":392,"correct":26},"专家调查法",{"key":24,"text":137,"correct":26},{"key":28,"text":135,"correct":22},{"key":31,"text":139,"correct":26},{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":31,"analysis":33},1103336,"(2010年真题）下列确认工程建设最终风险清单的风险识别方法组合中，正确的组合是（ ）。",[400,402,404,406],{"key":20,"text":401,"correct":26},"专家调查法和初始清单法",{"key":24,"text":403,"correct":26},"专家调查法和经验数据法",{"key":28,"text":405,"correct":26},"初始清单法和经验数据法",{"key":31,"text":407,"correct":22},"初始清单法和风险调查法",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":31,"analysis":33},1103337,"(2010年真题）与其他风险对策相比，风险自留对策的特点是（ ）",[412,414,416,418],{"key":20,"text":413,"correct":26},"既改变风险的发生概率，又改变风险潜在损失的严重性",{"key":24,"text":415,"correct":26},"只改变风险的发生概率，不改变风险潜在损失的严重性",{"key":28,"text":417,"correct":26},"不改变风险的发生概率，但改变风险潜在损失的严重性",{"key":31,"text":419,"correct":22},"既不改变风险的发生概率，又不改变风险潜在损失的严重性",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":24,"analysis":33},1103338,"(2010年真题）在各种风险对策中，预防损失风险对策的主要作用是（ ）。",[424,425,426,427],{"key":20,"text":215,"correct":26},{"key":24,"text":217,"correct":22},{"key":28,"text":219,"correct":26},{"key":31,"text":221,"correct":26},{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":20,"analysis":33},1103339,"(2011年真题）在损失控制计划系统中，使因严重风险事件而中断的工程实施过程尽快全面恢复，并减少进一步的损失的计划是（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"应急计划",{"key":24,"text":435,"correct":26},"恢复计划",{"key":28,"text":437,"correct":26},"灾难计划",{"key":31,"text":439,"correct":26},"预防计划",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":28,"analysis":33},1103340,"(2012年真题）关于风险评定的说法，正确的是（ ）",[444,446,448,450],{"key":20,"text":445,"correct":26},"风险等级为小的风险因素是可忽略的风险",{"key":24,"text":447,"correct":26},"风险等级为中等的风险因素可接受的风险",{"key":28,"text":449,"correct":22},"风险等级为大的风险因素是不可接受的风险",{"key":31,"text":451,"correct":26},"风险等级为很大的风险因素是不希望有的风险",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},1103341,"(2012年真题）关于风险评价作用的说法，正确的是（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":22},"通过风险评价可以更清楚地辨识主要风险",{"key":24,"text":459,"correct":26},"通过风险评价可以找出建设工程面临的风险因素",{"key":28,"text":461,"correct":26},"风险评价只能针对单一风险",{"key":31,"text":463,"correct":26},"风险评价可以最终形成建设工程风险清单",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":28,"analysis":33},1103342,"(2014年真题）下列方法中，可用于分析与评价建设工程风险的是（ ）。",[468,469,470,471],{"key":20,"text":137,"correct":26},{"key":24,"text":141,"correct":26},{"key":28,"text":43,"correct":22},{"key":31,"text":329,"correct":26},{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},1103343,"(2015年真题）工程监理单位承担工程保修阶段服务时，应按（ ）及检査内容开展工作。",[476,478,480,482],{"key":20,"text":477,"correct":22},"保修期回访计划",{"key":24,"text":479,"correct":26},"保修期监理规划",{"key":28,"text":481,"correct":26},"保修期监理实施细则",{"key":31,"text":483,"correct":26},"保修期监理工作规程",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":31,"analysis":33},1103344,"(2015年真题）常用的风险分析与评价方法不包括（ ）。",[488,489,490,491],{"key":20,"text":43,"correct":26},{"key":24,"text":41,"correct":26},{"key":28,"text":39,"correct":26},{"key":31,"text":308,"correct":22},{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":28,"analysis":33},1103345,"(2016年真题）关于建设工程风险的损失控制对策的说法，正确的是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":26},"预防损失措施的主要作用在于遏制损失的发展",{"key":24,"text":499,"correct":26},"减少损失措施的主要作用在于降低损失发生的概率",{"key":28,"text":501,"correct":22},"制定损失控制措施必须考虑其付出的费用和时间方面的代价",{"key":31,"text":503,"correct":26},"损失控制的计划系统应由质量计划、进度计划和投资计划构成",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":31,"analysis":33},1103346,"(2016年真题）关于风险等级可接受性评定的说法，正确的是（ ）。",[508,510,512,514],{"key":20,"text":509,"correct":26},"风险等级为大的风险因素是不希望有的风险",{"key":24,"text":511,"correct":26},"风险等级为中的风险因素是不可接受的风险",{"key":28,"text":513,"correct":26},"风险等级为小的风险因素是不可接受的风险",{"key":31,"text":515,"correct":22},"风险等级为很小的风险因素是可忽略的风险",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":28,"analysis":33},1103347,"(2017年真题）按风险影响范围分类，建设工程风险可划分为（ ）。",[520,522,524,525],{"key":20,"text":521,"correct":26},"社会风险和政治风险",{"key":24,"text":523,"correct":26},"监理单位风险和施工单位风险",{"key":28,"text":51,"correct":22},{"key":31,"text":53,"correct":26},{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":28,"analysis":33},1103348,"(2018年真题）根据《建设工程监理规范》，工程监理单位审查设计单位提出的新材料、新工艺、新技术、新设备在相关部门的备案情况，必要时应协助（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":26},"设计单位组织专家复审",{"key":24,"text":533,"correct":26},"相关部门组织专项论证",{"key":28,"text":535,"correct":22},"建设单位组织专家评审",{"key":31,"text":537,"correct":26},"使用单位申报备案资料",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},1103349,"(2017年真题）风险管理计划实施后，对风险的发展必然会产生相应效果的是（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":26},"风险评估方法",{"key":24,"text":545,"correct":22},"风险控制措施",{"key":28,"text":547,"correct":26},"风险数据采集",{"key":31,"text":549,"correct":26},"风险跟踪检查",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":24,"analysis":33},1103350,"(2017年真题）风险识别的最主要成果是（ ）。",[554,556,557,559],{"key":20,"text":555,"correct":26},"风险清单损失值",{"key":24,"text":380,"correct":22},{"key":28,"text":558,"correct":26},"风险事件发生概率",{"key":31,"text":560,"correct":26},"风险度量值",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":28,"analysis":33},1103351,"(2017年真题）评审工程设计成果需要进行的工作有：①邀请专家参与评审；②确定专家人选；③建立评审制度和程序；④收集专业评审意见；⑤分析专家评审意见。其正确的工作步骤是（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":26},"①→②→④→③→⑤",{"key":24,"text":568,"correct":26},"①→③→②→④→⑤",{"key":28,"text":570,"correct":22},"③→②→①→④→⑤",{"key":31,"text":572,"correct":26},"②→①→④→③→⑤",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":28,"analysis":33},1103352,"(2018年真题）关于风险识别方法的说法，正确的是（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":26},"流程图法不仅分析流程本身，也可显示发生问题的损失值或损失发生的概率",{"key":24,"text":580,"correct":26},"风险初始清单是项目风险管理的经验总结，可以作为项目风险识别的最终结论",{"key":28,"text":582,"correct":22},"经验数据法根据已建各类工程与风险有关的统计资料来识别拟建工程风险",{"key":31,"text":584,"correct":26},"专家调查法是从分析具体工程特点入手，对已经识别出的风险进行鉴别和确认",[586,589,592,595,598,601],{"id":15,"name":587,"category":7,"favorite":588},"领导干部任职前廉政法规知识测试题",92,{"id":590,"name":591,"category":7,"favorite":15},595,"建筑结构与设备",{"id":593,"name":594,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":596,"name":597,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":599,"name":600,"category":7,"favorite":8},534,"BIM工程师",{"id":602,"name":600,"category":7,"favorite":8},535]