[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":580},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,10,50,2341,[13,34,46,58,70,82,94,106,116,128,140,151,161,173,185,197,209,221,232,244,256,268,279,291,303,315,327,339,351,363,375,387,399,411,423,435,445,454,465,474,482,490,498,510,521,532,540,552,564,572],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1103210,1,"单选题","在国外工程咨询公司的阶段性服务内容中，各阶段工作业主都可能单独委托工程咨询公司来完成，()除外。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","工程设计",false,{"key":24,"text":25,"correct":22},"B","工程招标与设备采购",{"key":27,"text":28,"correct":29},"C","生产准备和调试验收",true,{"key":31,"text":32,"correct":22},"D","项目后评价","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1103211,"之所以说CM模式介入工程的时间较早，是因为CM单位一般在项目()阶段介入。",[38,40,42,44],{"key":20,"text":39,"correct":29},"设计",{"key":24,"text":41,"correct":22},"立项",{"key":27,"text":43,"correct":22},"招投标",{"key":31,"text":45,"correct":22},"可行性研究",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1103212,"工程咨询公司可为承包商提供全部或绝大部分设计服务工作。如果承包商仅承担施工任务时，工程咨询公司也可仅提供()服务。",[50,52,54,56],{"key":20,"text":51,"correct":22},"方案设计",{"key":24,"text":53,"correct":29},"详细设计",{"key":27,"text":55,"correct":22},"初步设计",{"key":31,"text":57,"correct":22},"技术设计",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1103213,"以下()情况能体现出CM模式的优点。",[62,64,66,68],{"key":20,"text":63,"correct":22},"设计变更可能性较小的建设工程",{"key":24,"text":65,"correct":22},"质量因素较为重要的工程",{"key":27,"text":67,"correct":22},"投资控制比较严格的工程",{"key":31,"text":69,"correct":29},"时间因素最为重要的建设工程",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1103214,"不得故意或无意地做出损害他人名誉或事务的事情属于FIDIC道德准则中()的内容。",[74,76,78,80],{"key":20,"text":75,"correct":22},"公平",{"key":24,"text":77,"correct":22},"反腐败",{"key":27,"text":79,"correct":22},"廉洁和正直",{"key":31,"text":81,"correct":29},"对他人公正",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1103215,"FIDIC对其会员提出了六个方面的基本道德行为准则，其中的廉洁和正直要求为()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"接受对社会的职业责任",{"key":24,"text":89,"correct":22},"不得故意或无意地做出损害他人名誉或事务的事情",{"key":27,"text":91,"correct":22},"不接受可能导致判断不公的报酬",{"key":31,"text":93,"correct":29},"在任何时候均为委托人的合法权益行使其职责，始终维护客户的合法利益，并廉洁、正直和忠实地进行职业服务",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1103216,"下列管理模式的特征中，属于Partnering模式特征的是()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"承包商承担大部分风险",{"key":24,"text":101,"correct":22},"业主管理工程实施",{"key":27,"text":103,"correct":29},"信息的开放性",{"key":31,"text":105,"correct":22},"采用单价合同",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1103217,"不接受任何可能影响其独立判断的报酬属于FIDIC道德准则中的( )",[110,112,114,115],{"key":20,"text":111,"correct":22},"对社会和咨询业的责任",{"key":24,"text":113,"correct":22},"廉洁和政治",{"key":27,"text":75,"correct":29},{"key":31,"text":77,"correct":22},{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":27,"analysis":33},1103218,"Partnering协议通常是由( )签署的协议。",[120,122,124,126],{"key":20,"text":121,"correct":22},"监理单位与承包商",{"key":24,"text":123,"correct":22},"业主与承包商",{"key":27,"text":125,"correct":29},"工程参与各方共同",{"key":31,"text":127,"correct":22},"业主与监理单位",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":27,"analysis":33},1103220,"下列不属于Project Controlling与建设项目管理的主要不同之处的是()。",[132,134,136,138],{"key":20,"text":133,"correct":22},"两者的地位不同",{"key":24,"text":135,"correct":22},"两者的权力不同",{"key":27,"text":137,"correct":29},"两者的工作属性不同",{"key":31,"text":139,"correct":22},"两者的工作内容不同",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":24,"analysis":33},1103221,"下列属于FIDIC道德准则的是（ ）。",[144,146,147,149],{"key":20,"text":145,"correct":22},"科学",{"key":24,"text":75,"correct":29},{"key":27,"text":148,"correct":22},"独立",{"key":31,"text":150,"correct":22},"正义",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":24,"analysis":33},1103222,"下列属于Project Controlling与建设项目管理的主要不同之处的是（ ）。",[155,157,158,159],{"key":20,"text":156,"correct":22},"两者的控制目标不同",{"key":24,"text":135,"correct":29},{"key":27,"text":137,"correct":22},{"key":31,"text":160,"correct":22},"两者的控制原理不同",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":24,"analysis":33},1103223,"（2020年真题）按照国际咨询工程师联合会（FIDI C）的理念，应基于（ ）选择咨询服务。",[165,167,169,171],{"key":20,"text":166,"correct":22},"业绩",{"key":24,"text":168,"correct":29},"质量",{"key":27,"text":170,"correct":22},"道德",{"key":31,"text":172,"correct":22},"职责",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":27,"analysis":33},1103224,"（2020年真题）关于Partnering协议的说法，正确的是（ ）。",[177,179,181,183],{"key":20,"text":178,"correct":22},"Partnering协议是工程总承包合同的组成部分",{"key":24,"text":180,"correct":22},"Partnering协议是工程设计合同的组成部分",{"key":27,"text":182,"correct":29},"Partnering协议不是法律意义上的合同",{"key":31,"text":184,"correct":22},"Partnering协议是工程咨询合同的组成部分",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":20,"analysis":33},1103225,"（2020年真题）与施工总承包相比，非代理型CM的特点是（ ）。",[189,191,193,195],{"key":20,"text":190,"correct":29},"CM单位介入工程时间早",{"key":24,"text":192,"correct":22},"业主与施工单位直接签订施工合同",{"key":27,"text":194,"correct":22},"CM合同采用简单的成本加酬金计价方式",{"key":31,"text":196,"correct":22},"CM单位承担工程设计任务",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":27,"analysis":33},1103248,"按风险影响范围分类，建设工程风险可划分为()。",[201,203,205,207],{"key":20,"text":202,"correct":22},"社会风险和政治风险",{"key":24,"text":204,"correct":22},"监理单位风险和施工单位风险",{"key":27,"text":206,"correct":29},"局部风险和总体风险",{"key":31,"text":208,"correct":22},"可管理风险和不可管理风险",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":27,"analysis":33},1103249,"建设工程风险识别方法中，不属于专家调查法的是()。",[213,215,217,219],{"key":20,"text":214,"correct":22},"头脑风暴法",{"key":24,"text":216,"correct":22},"德尔菲法",{"key":27,"text":218,"correct":29},"经验数据法",{"key":31,"text":220,"correct":22},"访谈法",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":27,"analysis":33},1103250,"根据保险公司公布的潜在损失一览表，对建设工程风险进行识别的方法是()。",[225,227,228,230],{"key":20,"text":226,"correct":22},"专家调查法",{"key":24,"text":218,"correct":22},{"key":27,"text":229,"correct":29},"初始清单法",{"key":31,"text":231,"correct":22},"风险调查法",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":31,"analysis":33},1103251,"某建设工程有X、Y、Z 三项风险事件，发生概率分别为：Px=10％，Py=15％，Pz=20％，潜在损失分别为：qx=18 万元，qy=10 万元，qz=8 万元，则该工程的风险度量期望值为()万元。",[236,238,240,242],{"key":20,"text":237,"correct":22},"⒈5",{"key":24,"text":239,"correct":22},"⒈6",{"key":27,"text":241,"correct":22},"⒈8",{"key":31,"text":243,"correct":29},"⒋9",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":31,"analysis":33},1103252,"关于风险等级可接受性评定的说法，正确的是()。",[248,250,252,254],{"key":20,"text":249,"correct":22},"风险等级为大的风险因素是不希望有的风险",{"key":24,"text":251,"correct":22},"风险等级为中的风险因素是不可接受的风险",{"key":27,"text":253,"correct":22},"风险等级为小的风险因素是不可接受的风险",{"key":31,"text":255,"correct":29},"风险等级为很小的风险因素是可忽略的风险",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":27,"analysis":33},1103253,"下列风险等级图中，风险量大致相等的是()。",[260,262,264,266],{"key":20,"text":261,"correct":22},"①②③",{"key":24,"text":263,"correct":22},"③⑥⑨",{"key":27,"text":265,"correct":29},"①⑤⑨",{"key":31,"text":267,"correct":22},"③⑤⑦",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":27,"analysis":33},1103254,"下列方法中，可用于分析与评价建设工程风险的是()。",[272,273,275,277],{"key":20,"text":218,"correct":22},{"key":24,"text":274,"correct":22},"流程图法",{"key":27,"text":276,"correct":29},"计划评审技术法",{"key":31,"text":278,"correct":22},"财务报表法",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":27,"analysis":33},1103255,"关于建设工程风险的损失控制对策的说法，正确的是()。",[283,285,287,289],{"key":20,"text":284,"correct":22},"预防损失措施的主要作用在于遏制损失的发展",{"key":24,"text":286,"correct":22},"减少损失措施的主要作用在于降低损失发生的概率",{"key":27,"text":288,"correct":29},"制定损失控制措施必须考虑其付出的费用和时间方面的代价",{"key":31,"text":290,"correct":22},"制定损失控制措施只需考虑其付出的费用代价",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":24,"analysis":33},1103269,"风险识别的最主要成果是()。",[295,297,299,301],{"key":20,"text":296,"correct":22},"风险清单损失值",{"key":24,"text":298,"correct":29},"风险清单",{"key":27,"text":300,"correct":22},"风险事件发生概率",{"key":31,"text":302,"correct":22},"风险度量值",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":27,"analysis":33},1103270,"关于风险识别方法的说话，正确的是()。",[307,309,311,313],{"key":20,"text":308,"correct":22},"流程图法不仅分析流程本身，也可显示发生问题的损失值或损失发生的概率",{"key":24,"text":310,"correct":22},"风险初始清单是项目风险管理的检验总结，可以作为项目风险识别的最终结论",{"key":27,"text":312,"correct":29},"经验数据法根据已建各类工程与风险有关的统计资料来识别拟建工程风险",{"key":31,"text":314,"correct":22},"专家调查法是从分析具体工程特点入手，对已经识别出的风险进行鉴别和确认",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":24,"analysis":33},1103271,"风险管理计划实施后，对风险的发展必然会产生相应效果的是()。",[319,321,323,325],{"key":20,"text":320,"correct":22},"风险评估方法",{"key":24,"text":322,"correct":29},"风险控制措施",{"key":27,"text":324,"correct":22},"风险数据采集",{"key":31,"text":326,"correct":22},"风险跟踪检查",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":27,"analysis":33},1103273,"根据《建设工程监理规范》工程监理单位应审查设计单位提出的新材料、新工艺、新技术、新设备在相关部门的备案情况，必要时应协助()。",[331,333,335,337],{"key":20,"text":332,"correct":22},"设计单位组织专家复审",{"key":24,"text":334,"correct":22},"相关部门组织专家论证",{"key":27,"text":336,"correct":29},"建设单位组织专家评审",{"key":31,"text":338,"correct":22},"使用单位取得备案材料",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":27,"analysis":33},1103279,"评审工程设计成果需要进行的工作有：①邀请专家参与评审；②确定专家人选；③建立评审制度和程序；④收集专家评审意见；⑤分析专家评审意见。其正确的工作步骤是()。",[343,345,347,349],{"key":20,"text":344,"correct":22},"①-②-④-③-⑤",{"key":24,"text":346,"correct":22},"①-③-②-④-⑤",{"key":27,"text":348,"correct":29},"③-②-①-④-⑤",{"key":31,"text":350,"correct":22},"②-①-④-③-⑤",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":20,"analysis":33},1103280,"工程监理单位承担工程保修阶段服务时，应按()及检查内容开展工作，并做好记录。",[355,357,359,361],{"key":20,"text":356,"correct":29},"保修期回访计划",{"key":24,"text":358,"correct":22},"保修期监理规划",{"key":27,"text":360,"correct":22},"保修期监理实施细则",{"key":31,"text":362,"correct":22},"保修期监理工作计划",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":24,"analysis":33},1103282,"下列有关全过程集成化管理服务内容的说法中，正确的是（ ）",[367,369,371,373],{"key":20,"text":368,"correct":22},"组织建设单位办理土地征用手续",{"key":24,"text":370,"correct":29},"组织设计单位进行工程设计方案的技术经济分析",{"key":27,"text":372,"correct":22},"签订工程总承包或施工合同、材料设备采购合同",{"key":31,"text":374,"correct":22},"编制工程竣工决算报告",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":27,"analysis":33},1103283,"在所有的项目全过程集成化管理服务模式中，项目管理团队具有项目管理和职能管理双重功能的是（ ）。",[379,381,383,385],{"key":20,"text":380,"correct":22},"独立式服务模式",{"key":24,"text":382,"correct":22},"融合式服务模式",{"key":27,"text":384,"correct":29},"植入式服务模式",{"key":31,"text":386,"correct":22},"职能式服务模式",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":20,"analysis":33},1103284,"下列选项中，不属于工程项目单位服务内容的是()。",[391,393,395,397],{"key":20,"text":392,"correct":29},"项目保修",{"key":24,"text":394,"correct":22},"项目策划",{"key":27,"text":396,"correct":22},"设计管理",{"key":31,"text":398,"correct":22},"施工过程管理",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":31,"analysis":33},1103285,"下列选项中，不属于PM-BOK总体框架的基本过程组的是()。",[403,405,407,409],{"key":20,"text":404,"correct":22},"启动过程组",{"key":24,"text":406,"correct":22},"计划过程组",{"key":27,"text":408,"correct":22},"监控过程组",{"key":31,"text":410,"correct":29},"操作过程组",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":24,"analysis":33},1103286,"对建设单位或使用单位提出的工程质量缺陷，要求予以修复的单位是()。",[415,417,419,421],{"key":20,"text":416,"correct":22},"建设单位",{"key":24,"text":418,"correct":29},"施工单位",{"key":27,"text":420,"correct":22},"使用单位",{"key":31,"text":422,"correct":22},"责任单位",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":31,"analysis":33},1103287,"下列选项中，不属于在决定进行风险控制时，应该制定的计划是()。",[427,429,431,433],{"key":20,"text":428,"correct":22},"预防计划",{"key":24,"text":430,"correct":22},"灾难计划",{"key":27,"text":432,"correct":22},"应急计划",{"key":31,"text":434,"correct":29},"报警计划",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":31,"analysis":33},1103288,"下列选项中，不属于常用风险分析与评价方法的是()。",[439,441,443,444],{"key":20,"text":440,"correct":22},"调查打分法",{"key":24,"text":442,"correct":22},"蒙特卡洛模拟法",{"key":27,"text":276,"correct":22},{"key":31,"text":214,"correct":29},{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":31,"analysis":33},1103289,"在风险识别方法中，不属于专家调查法的是()。",[449,450,451,452],{"key":20,"text":214,"correct":22},{"key":24,"text":216,"correct":22},{"key":27,"text":220,"correct":22},{"key":31,"text":453,"correct":29},"敏感性分析法",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":31,"analysis":33},1103290,"下列方法中，不属于风险因素应考虑的方面是()。",[458,459,461,463],{"key":20,"text":168,"correct":22},{"key":24,"text":460,"correct":22},"造价",{"key":27,"text":462,"correct":22},"环境",{"key":31,"text":464,"correct":29},"科技",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":20,"analysis":33},1103291,"在损失控制计划系统中，使因严重风险事件而中断的工程实施过程尽快全面恢复并减少进一步损失的计划是()。",[469,470,472,473],{"key":20,"text":432,"correct":29},{"key":24,"text":471,"correct":22},"恢复计划",{"key":27,"text":430,"correct":22},{"key":31,"text":428,"correct":22},{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":24,"analysis":33},1103292,"在风险识别方法中，可以明确地发现建设工程所面临的风险，但仅着重于流程本身的方法是()。",[478,479,480,481],{"key":20,"text":278,"correct":22},{"key":24,"text":274,"correct":29},{"key":27,"text":229,"correct":22},{"key":31,"text":226,"correct":22},{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":31,"analysis":33},1103293,"下列风险识别方法中，有可能发现其他识别方法难以识别出的工程风险的方法是()。",[486,487,488,489],{"key":20,"text":274,"correct":22},{"key":24,"text":229,"correct":22},{"key":27,"text":218,"correct":22},{"key":31,"text":231,"correct":29},{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":31,"analysis":33},1103294,"按建设工程实施全过程内在逻辑关系制成流程图，针对流程图中的关键环节和薄弱环节进行调查和分析，找出风险存在的原因，从中发现潜在的风险威胁，分析风险发生后可能造成的损失和对建设工程全过程造成的影响，这种风险识别方法是()。",[494,495,496,497],{"key":20,"text":278,"correct":22},{"key":24,"text":229,"correct":22},{"key":27,"text":226,"correct":22},{"key":31,"text":274,"correct":29},{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":27,"analysis":33},1103295,"在涉外工程中，由于缺乏有关外汇市场的知识和信息，为避免承担由此带来的经济风险，决策者决定选择本国货币作为结算货币，从而丧失了从汇率变化中获益的可能性，这一对策为()。",[502,504,506,508],{"key":20,"text":503,"correct":22},"风险自留",{"key":24,"text":505,"correct":22},"损失转移",{"key":27,"text":507,"correct":29},"风险回避",{"key":31,"text":509,"correct":22},"风险控制",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":20,"analysis":33},1103296,"对于建设工程风险来说，工程保险是建设工程风险中采用的()对策。",[514,516,518,520],{"key":20,"text":515,"correct":29},"风险转移",{"key":24,"text":517,"correct":22},"非保险转移",{"key":27,"text":519,"correct":22},"损失控制",{"key":31,"text":507,"correct":22},{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},1103297,"建设工程风险识别是由若干工作构成的过程，下列选项中，属于最主要成果的是()。",[525,526,528,530],{"key":20,"text":298,"correct":29},{"key":24,"text":527,"correct":22},"识别建设工程风险因素",{"key":27,"text":529,"correct":22},"建设工程风险分解",{"key":31,"text":531,"correct":22},"识别建设工程风险事件及其后果",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":20,"analysis":33},1103298,"某投标人在招标工程开标后发现自己由于报价失误，比正常报价少报20％，虽然被确定为中标人，但拒绝与业主签订施工合同，该风险对策为()。",[536,537,538,539],{"key":20,"text":507,"correct":29},{"key":24,"text":519,"correct":22},{"key":27,"text":503,"correct":22},{"key":31,"text":515,"correct":22},{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":31,"analysis":33},1103299,"下列选项中，属于按风险可否管理划分的是()。",[544,546,548,550],{"key":20,"text":545,"correct":22},"建设单位的风险",{"key":24,"text":547,"correct":22},"施工单位的风险",{"key":27,"text":549,"correct":22},"政治风险",{"key":31,"text":551,"correct":29},"可管理风险",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":31,"analysis":33},1103300,"下列选项中，进行风险分析与评价的重要基础是()。",[556,558,560,562],{"key":20,"text":557,"correct":22},"风险分析与评价",{"key":24,"text":559,"correct":22},"风险对策的决策",{"key":27,"text":561,"correct":22},"风险对策的实施",{"key":31,"text":563,"correct":29},"风险识别成果",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},1103301,"发生损失的概率并不大，但当风险事件发生后产生的损失是灾难性的、无法弥补的，此时应采取()。",[568,569,570,571],{"key":20,"text":507,"correct":29},{"key":24,"text":519,"correct":22},{"key":27,"text":515,"correct":22},{"key":31,"text":503,"correct":22},{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":27,"analysis":33},1103302,"被转移者往往能较好地进行损失控制，这是()的优点。",[576,577,578,579],{"key":20,"text":507,"correct":22},{"key":24,"text":519,"correct":22},{"key":27,"text":517,"correct":29},{"key":31,"text":503,"correct":22},[581,584,587,590,593,596],{"id":15,"name":582,"category":7,"favorite":583},"领导干部任职前廉政法规知识测试题",92,{"id":585,"name":586,"category":7,"favorite":15},595,"建筑结构与设备",{"id":588,"name":589,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":591,"name":592,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":594,"name":595,"category":7,"favorite":8},534,"BIM工程师",{"id":597,"name":595,"category":7,"favorite":8},535]