[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-780-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":599},{"id":5,"name":6,"category":7,"favorite":8},780,"监理概论","建筑工程",0,1,50,2341,[13,33,45,57,69,81,93,105,117,129,141,153,165,175,184,193,205,217,229,241,253,265,277,289,300,312,324,336,348,360,372,384,396,408,420,432,441,453,465,477,489,501,512,523,535,544,556,568,580,589],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":23,"analysis":32},1102711,"单选题","根据项目法人责任制的规定，项目法人应当在（ ）批准后成立。",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","项目建议书",false,{"key":23,"text":24,"correct":25},"B","项目可行性研究报告",true,{"key":27,"text":28,"correct":21},"C","初步设计文件",{"key":30,"text":31,"correct":21},"D","施工图设计文件","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":27,"analysis":32},1102712,"对于实施项目法人责任制的项目，正式成立项目法人的时间是在（ ）后。",[37,39,41,43],{"key":19,"text":38,"correct":21},"项目建议书被批准",{"key":23,"text":40,"correct":21},"初步设计文件被批准",{"key":27,"text":42,"correct":25},"项目可行性研究报告被批准",{"key":30,"text":44,"correct":21},"施工图设计文件通过审查",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":30,"analysis":32},1102713,"建设项目法人责任制的核心内容是明确由项目法人（ ）。",[49,51,53,55],{"key":19,"text":50,"correct":21},"组织工程建设",{"key":23,"text":52,"correct":21},"策划工程项目",{"key":27,"text":54,"correct":21},"负责生产经营",{"key":30,"text":56,"correct":25},"承担投资风险",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":23,"analysis":32},1102714,"下列关于项目法人责任制的表述中，正确的是（ ）。",[61,63,65,67],{"key":19,"text":62,"correct":21},"有关单位在申报项目可行性研究报告时，可不提出项目法人的组建方案",{"key":23,"text":64,"correct":25},"项目可行性研究报告被批准后，正式成立项目法人",{"key":27,"text":66,"correct":21},"由原有企业负责建设的大中型基建项目，需新设立分公司的，要重新设立项目法人",{"key":30,"text":68,"correct":21},"项目公司只能是有限责任公司",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":27,"analysis":32},1102715,"实行建设项目法人责任制的项目中，项目董事会的职权是（ ）。",[73,75,77,79],{"key":19,"text":74,"correct":21},"编制和确定招标方案",{"key":23,"text":76,"correct":21},"编制项目年度投资计划",{"key":27,"text":78,"correct":25},"提出项目竣工验收申请报告",{"key":30,"text":80,"correct":21},"提出项目后评价报告",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":23,"analysis":32},1102716,"下列各项中，属于建设单位主要合同关系的是（ ）。",[85,87,89,91],{"key":19,"text":86,"correct":21},"劳务分包合同",{"key":23,"text":88,"correct":25},"工程承包（总承包.施工承包）合同",{"key":27,"text":90,"correct":21},"加工合同",{"key":30,"text":92,"correct":21},"租赁合同",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":95,"options":96,"answer":23,"analysis":32},1102717,"下列关于建设工程监理涵义的表述中，正确的是（ ）。",[97,99,101,103],{"key":19,"text":98,"correct":21},"工程总承包单位或施工总承包单位对分包单位的管理是工程监理",{"key":23,"text":100,"correct":25},"工程监理单位在委托监理的工程中拥有一定管理权限，是建设单位授权的结果",{"key":27,"text":102,"correct":21},"建设工程监理定位于工程施工阶段，工程监理单位受施工单位委托，按照建设工程监理合同约定，在工程施工阶段提供的服务活动均为相关服务",{"key":30,"text":104,"correct":21},"实行监理的工程，由施工单位委托具有相应资质条件的工程监理单位实施监理",{"id":106,"libraryId":5,"type":9,"typeLabel":15,"stem":107,"options":108,"answer":30,"analysis":32},1102718,"建设工程监理工作应有明确的依据，除《建设工程质量管理条例》中提及的监理依据外，还包括（ ）。",[109,111,113,115],{"key":19,"text":110,"correct":21},"有关技术标准",{"key":23,"text":112,"correct":21},"设计文件",{"key":27,"text":114,"correct":21},"工程承包合同",{"key":30,"text":116,"correct":25},"委托监理合同",{"id":118,"libraryId":5,"type":9,"typeLabel":15,"stem":119,"options":120,"answer":19,"analysis":32},1102719,"工程监理人员利用自己的知识为建设单位提供管理和技术服务，这体现了建设工程监理的（ ）。",[121,123,125,127],{"key":19,"text":122,"correct":25},"服务性",{"key":23,"text":124,"correct":21},"科学性",{"key":27,"text":126,"correct":21},"独立性",{"key":30,"text":128,"correct":21},"公平性",{"id":130,"libraryId":5,"type":9,"typeLabel":15,"stem":131,"options":132,"answer":30,"analysis":32},1102723,"根据《建设工程监理范围和规模标准规定》，下列各项目中，必须实行监理的是（ ）。",[133,135,137,139],{"key":19,"text":134,"correct":21},"总投资额为2500万元的供电工程项目",{"key":23,"text":136,"correct":21},"建筑面积为4万平方米的住宅建设工程",{"key":27,"text":138,"correct":21},"总投资额为2500万元的新能源项目",{"key":30,"text":140,"correct":25},"总投资额为2500万元的影剧院项目",{"id":142,"libraryId":5,"type":9,"typeLabel":15,"stem":143,"options":144,"answer":27,"analysis":32},1102724,"负责对施工组织设计中的安全技术措施或者专项施工方案是否符合工程建设强制性标准进行审查的是（ ）。",[145,147,149,151],{"key":19,"text":146,"correct":21},"建设单位",{"key":23,"text":148,"correct":21},"施工单位",{"key":27,"text":150,"correct":25},"监理单位",{"key":30,"text":152,"correct":21},"质量监督部门",{"id":154,"libraryId":5,"type":9,"typeLabel":15,"stem":155,"options":156,"answer":27,"analysis":32},1102725,"依照《建设工程安全生产管理条例》，注册监理工程师未执行法律、法规和工程建设强制性标准，造成重大安全事故的，（ ）。",[157,159,161,163],{"key":19,"text":158,"correct":21},"责令停止执业3个月以上1年以下",{"key":23,"text":160,"correct":21},"吊销执业资格证书，5年内不予注册",{"key":27,"text":162,"correct":25},"终身不予注册",{"key":30,"text":164,"correct":21},"对造成的损失依法承担赔偿责任",{"id":166,"libraryId":5,"type":9,"typeLabel":15,"stem":167,"options":168,"answer":30,"analysis":32},1102726,"依照《建设工程质量管理条例》，监理工程师因过错造成质量事故的，（ ）。",[169,170,172,173],{"key":19,"text":160,"correct":21},{"key":23,"text":171,"correct":21},"吊销执业资格证书，终身不予注册",{"key":27,"text":158,"correct":21},{"key":30,"text":174,"correct":25},"责令停止执业1年",{"id":176,"libraryId":5,"type":9,"typeLabel":15,"stem":177,"options":178,"answer":27,"analysis":32},1102727,"建设工程监理的实施主体是（ ）。",[179,180,181,182],{"key":19,"text":146,"correct":21},{"key":23,"text":148,"correct":21},{"key":27,"text":150,"correct":25},{"key":30,"text":183,"correct":21},"政府主管部门",{"id":185,"libraryId":5,"type":9,"typeLabel":15,"stem":186,"options":187,"answer":23,"analysis":32},1102728,"工程监理企业应当由足够数量的有丰富管理经验和应变能力的注册监理工程师组成骨干队伍，这体现了建设工程监理性质中的（ ）。",[188,189,190,191],{"key":19,"text":122,"correct":21},{"key":23,"text":124,"correct":25},{"key":27,"text":126,"correct":21},{"key":30,"text":192,"correct":21},"公正性",{"id":194,"libraryId":5,"type":9,"typeLabel":15,"stem":195,"options":196,"answer":23,"analysis":32},1102729,"关于建设工程监理性质的表述中，体现科学性的是（ ）。",[197,199,201,203],{"key":19,"text":198,"correct":21},"监理单位在建设单位授权范围内控制建设工程质量.造价和进度",{"key":23,"text":200,"correct":25},"监理单位应有科学的工作态度和严谨的工作作风，创造性地开展工作",{"key":27,"text":202,"correct":21},"监理单位在监理工作过程中，必须建立项目监理机构，利用科学的方法和手段，独立地开展工作",{"key":30,"text":204,"correct":21},"在调解建设单位与施工单位之间争议时，应尽量客观.公正地对待建设单位和施工单位",{"id":206,"libraryId":5,"type":9,"typeLabel":15,"stem":207,"options":208,"answer":23,"analysis":32},1102730,"根据《建设工程监理范围和规模标准规定》，下列工程项目中，必须实行监理的是（ ）。",[209,211,213,215],{"key":19,"text":210,"correct":21},"总投资额为1亿元的服装厂改建项目",{"key":23,"text":212,"correct":25},"总投资额为400万美元的联合国环境署援助项目",{"key":27,"text":214,"correct":21},"总投资额为2500万元的垃圾处理项目",{"key":30,"text":216,"correct":21},"建筑面积为4万平方米的住宅建设项目",{"id":218,"libraryId":5,"type":9,"typeLabel":15,"stem":219,"options":220,"answer":30,"analysis":32},1102731,"根据《建设工程质量管理条例》，必须实行监理的工程不包括（ ）。",[221,223,225,227],{"key":19,"text":222,"correct":21},"大中型公用事业工程",{"key":23,"text":224,"correct":21},"国家重点建设工程",{"key":27,"text":226,"correct":21},"利用外国政府或者国际组织贷款.援助资金的工程",{"key":30,"text":228,"correct":25},"全部或者部分使用国有资金投资或者国家融资的项目",{"id":230,"libraryId":5,"type":9,"typeLabel":15,"stem":231,"options":232,"answer":23,"analysis":32},1102733,"《建设工程质量管理条例》规定，工程监理单位转让工程监理业务的，将被处以合同约定的监理酬金（ ）的罚款。",[233,235,237,239],{"key":19,"text":234,"correct":21},"15%以上30%以下",{"key":23,"text":236,"correct":25},"25%以上50%以下",{"key":27,"text":238,"correct":21},"30%以上50%以下",{"key":30,"text":240,"correct":21},"35%以上60%以下",{"id":242,"libraryId":5,"type":9,"typeLabel":15,"stem":243,"options":244,"answer":27,"analysis":32},1102734,"工程监理单位与被监理工程的设备供应单位有隶属关系承担该项建设工程的监理业务的，（ ）。",[245,247,249,251],{"key":19,"text":246,"correct":21},"责令停止违法行为或改正，处合同约定的监理酬金1倍以上2倍以下的罚款，可以责令停业整顿，降低资质等级",{"key":23,"text":248,"correct":21},"责令改正，处50万元以上100万元以下的罚款，降低资质等级或者吊销资质证书，有违法所得的，予以没收",{"key":27,"text":250,"correct":25},"责令改正，处5万元以上10万元以下的罚款，降低资质等级或者吊销资质证书，有违法所得的，予以没收",{"key":30,"text":252,"correct":21},"责令限期改正，逾期未改正的，责令停业整顿，并处10万元以上30万元以下的罚款，情节严重的，降低资质等级，直至吊销资质证书",{"id":254,"libraryId":5,"type":9,"typeLabel":15,"stem":255,"options":256,"answer":27,"analysis":32},1102735,"下列FIDIC道德准则中，属于咨询工程师对社会和咨询业责任的是（ ）。",[257,259,261,263],{"key":19,"text":258,"correct":21},"正直和忠诚地进行职业服务",{"key":23,"text":260,"correct":21},"不接受任何可能影响其独立判断的报酬",{"key":27,"text":262,"correct":25},"在任何情况下，始终维护咨询业的尊严.地位和荣誉",{"key":30,"text":264,"correct":21},"只承担能够胜任的任务",{"id":266,"libraryId":5,"type":9,"typeLabel":15,"stem":267,"options":268,"answer":19,"analysis":32},1102736,"国际上，工程咨询公司最基本、最广泛的业务是（ ）。",[269,271,273,275],{"key":19,"text":270,"correct":25},"为业主服务",{"key":23,"text":272,"correct":21},"为承包商服务",{"key":27,"text":274,"correct":21},"为贷款方服务",{"key":30,"text":276,"correct":21},"联合承包工程",{"id":278,"libraryId":5,"type":9,"typeLabel":15,"stem":279,"options":280,"answer":27,"analysis":32},1102737,"工程咨询公司为承包商提供的服务不包括（ ）。",[281,283,285,287],{"key":19,"text":282,"correct":21},"合同咨询和索赔",{"key":23,"text":284,"correct":21},"技术咨询",{"key":27,"text":286,"correct":25},"材料设备采购",{"key":30,"text":288,"correct":21},"工程设计",{"id":290,"libraryId":5,"type":9,"typeLabel":15,"stem":291,"options":292,"answer":19,"analysis":32},1102738,"下列不属于FIDIC道德准则中公平内容是（ ）。",[293,295,297,299],{"key":19,"text":294,"correct":25},"寻求符合可持续发展原则的解决方案",{"key":23,"text":296,"correct":21},"在提供职业咨询.评审或决策时公平地提供专业建议.判断或决定",{"key":27,"text":298,"correct":21},"为客户服务过程中可能产生的一切潜在的利益冲突，都应告知客户",{"key":30,"text":260,"correct":21},{"id":301,"libraryId":5,"type":9,"typeLabel":15,"stem":302,"options":303,"answer":27,"analysis":32},1102739,"不接受任何可能影响其独立判断的报酬属于FIDIC道德准则中（ ）方面的要求。",[304,306,308,310],{"key":19,"text":305,"correct":21},"对社会和咨询业的责任",{"key":23,"text":307,"correct":21},"廉洁和正直",{"key":27,"text":309,"correct":25},"公平",{"key":30,"text":311,"correct":21},"反腐败",{"id":313,"libraryId":5,"type":9,"typeLabel":15,"stem":314,"options":315,"answer":30,"analysis":32},1102740,"应用CM模式的关键和前提条件是（ ）。",[316,318,320,322],{"key":19,"text":317,"correct":21},"选择CM模式的类型",{"key":23,"text":319,"correct":21},"确定CM合同价",{"key":27,"text":321,"correct":21},"确定承发包模式",{"key":30,"text":323,"correct":25},"有具备丰富施工经验的高水平CM单位",{"id":325,"libraryId":5,"type":9,"typeLabel":15,"stem":326,"options":327,"answer":23,"analysis":32},1102741,"关于Partnering模式与其他模式比较的说法中，错误的是（ ）。",[328,330,332,334],{"key":19,"text":329,"correct":21},"Partnering模式的期限可以是一个建设工程的一次性合作，也可以是多个建设工程的长期合作，而其他模式的期限是合同规定的期限",{"key":23,"text":331,"correct":25},"Partnering模式和其他模式在相互关系方面，都强调在微观利益上相互对立",{"key":27,"text":333,"correct":21},"Partnering模式中较少出现甚至完全避免争议与索赔，而其他模式中争议与索赔次数多.数额大，常常导致仲裁或诉讼",{"key":30,"text":335,"correct":21},"Partnering模式的信任是建立在共同的目标.不隐瞒任何事实以及相互承诺的基础上，长期合作则不再招标，而其他模式则是每个建设工程均需组织招标",{"id":337,"libraryId":5,"type":9,"typeLabel":15,"stem":338,"options":339,"answer":23,"analysis":32},1102742,"Partnering模式的基础和关键是（ ）。",[340,342,344,346],{"key":19,"text":341,"correct":21},"共同的目标",{"key":23,"text":343,"correct":25},"信任",{"key":27,"text":345,"correct":21},"合作",{"key":30,"text":347,"correct":21},"共享",{"id":349,"libraryId":5,"type":9,"typeLabel":15,"stem":350,"options":351,"answer":30,"analysis":32},1102743,"下列各项中，属于Partnering模式适用情况的是（ ）。",[352,354,356,358],{"key":19,"text":353,"correct":21},"适宜采用公开招标的建设项目",{"key":23,"text":355,"correct":21},"不确定因素较少的建设工程",{"key":27,"text":357,"correct":21},"设计变更可能性较大的建设工程",{"key":30,"text":359,"correct":25},"业主长期有投资活动的建设工程",{"id":361,"libraryId":5,"type":9,"typeLabel":15,"stem":362,"options":363,"answer":27,"analysis":32},1102744,"下列关于Project Controlling模式的说法中，正确的是（ ）。",[364,366,368,370],{"key":19,"text":365,"correct":21},"可以取代建设项目管理",{"key":23,"text":367,"correct":21},"可以作为一种独立存在的项目管理模式",{"key":27,"text":369,"correct":25},"可以分为单平面和多平面两种类型",{"key":30,"text":371,"correct":21},"与建设项目管理的服务对象完全相同",{"id":373,"libraryId":5,"type":9,"typeLabel":15,"stem":374,"options":375,"answer":27,"analysis":32},1102745,"下列关于Partnering模式与Project Controlling模式的说法中，错误的是（ ）。",[376,378,380,382],{"key":19,"text":377,"correct":21},"Partnering模式与Project Controlling模式均不能作为一种独立存在的模式",{"key":23,"text":379,"correct":21},"Project Controlling模式往往是与建设工程组织模式中的多种模式同时并存，对其他模式没有任何“选择性”和“排他性”",{"key":27,"text":381,"correct":25},"Partnering模式与Project Controlling模式均需要在工程项目参建各方之间签订有关协议",{"key":30,"text":383,"correct":21},"代表政府进行基础设施建设投资的业主的建设工程适合采用Partnering模式",{"id":385,"libraryId":5,"type":9,"typeLabel":15,"stem":386,"options":387,"answer":27,"analysis":32},1102746,"下列关于CM模式和快速路径法的表述中，正确的是（ ）。",[388,390,392,394],{"key":19,"text":389,"correct":21},"快速路径法不能改变建设工程的施工顺序",{"key":23,"text":391,"correct":21},"快速路径法只能在CM模式中使用",{"key":27,"text":393,"correct":25},"CM模式是以使用CM单位为特征的建设工程实施组织模式，具有独特的合同关系和组织形式",{"key":30,"text":395,"correct":21},"与传统模式相比，快速路径法降低了施工阶段组织协调和目标控制的难度",{"id":397,"libraryId":5,"type":9,"typeLabel":15,"stem":398,"options":399,"answer":19,"analysis":32},1102747,"对于生产某些急于占领市场产品的建设工程，如果采用传统模式组织实施，建设周期较长，虽然总投资可能较低，但可能因此失去市场，导致投资效益降低乃至很差，此时就应该选择（ ）。",[400,402,404,406],{"key":19,"text":401,"correct":25},"CM模式",{"key":23,"text":403,"correct":21},"EPC模式",{"key":27,"text":405,"correct":21},"Partnering模式",{"key":30,"text":407,"correct":21},"Project Controlling模式",{"id":409,"libraryId":5,"type":9,"typeLabel":15,"stem":410,"options":411,"answer":19,"analysis":32},1102748,"在风险型CM模式下，CM合同价格为（ ）。",[412,414,416,418],{"key":19,"text":413,"correct":25},"CM费+与CM单位签订合同的各分包商.供应商合同价",{"key":23,"text":415,"correct":21},"CM费+所有施工单位合同价+所有供应单位合同价",{"key":27,"text":417,"correct":21},"CM费",{"key":30,"text":419,"correct":21},"CM费+GMP",{"id":421,"libraryId":5,"type":9,"typeLabel":15,"stem":422,"options":423,"answer":23,"analysis":32},1102749,"Project Controlling与Partnering模式的共同之处是（ ）。",[424,426,428,430],{"key":19,"text":425,"correct":21},"信息共享",{"key":23,"text":427,"correct":25},"不能独立存在",{"key":27,"text":429,"correct":21},"长期协议",{"key":30,"text":431,"correct":21},"协调机制",{"id":433,"libraryId":5,"type":9,"typeLabel":15,"stem":434,"options":435,"answer":30,"analysis":32},1102750,"下列建设工程组织管理模式中，不能独立存在的模式是（ ）。",[436,437,439,440],{"key":19,"text":401,"correct":21},{"key":23,"text":438,"correct":21},"D+B模式",{"key":27,"text":403,"correct":21},{"key":30,"text":405,"correct":25},{"id":442,"libraryId":5,"type":9,"typeLabel":15,"stem":443,"options":444,"answer":30,"analysis":32},1102751,"工程项目管理咨询单位可以为业主仅仅提供施工阶段的服务，也可以为业主提供实施阶段全过程乃至工程建设全过程的服务，其中以实施阶段全过程服务在国际上最为普遍，而Project Controlling咨询单位一般不为业主仅仅提供施工阶段的服务，而是为业主提供实施阶段全过程和工程建设全过程的服务，甚至还可能提供项目策划阶段的服务，这说明Project Controlling与工程项目管理服务的不同之处在于（ ）。",[445,447,449,451],{"key":19,"text":446,"correct":21},"两者的工作内容不同",{"key":23,"text":448,"correct":21},"两者的权力不同",{"key":27,"text":450,"correct":21},"两者的地位不同",{"key":30,"text":452,"correct":25},"两者的服务时间不尽相同",{"id":454,"libraryId":5,"type":9,"typeLabel":15,"stem":455,"options":456,"answer":19,"analysis":32},1102752,"以下各项中，不属于PMBOK中项目管理知识领域的是（ ）。",[457,459,461,463],{"key":19,"text":458,"correct":25},"项目运营管理",{"key":23,"text":460,"correct":21},"项目范围管理",{"key":27,"text":462,"correct":21},"项目费用管理",{"key":30,"text":464,"correct":21},"项目集成管理",{"id":466,"libraryId":5,"type":9,"typeLabel":15,"stem":467,"options":468,"answer":27,"analysis":32},1102753,"在风险管理过程中，风险识别和风险分析与评价是两个重要步骤，下列关于这两者的表述中，正确的是（ ）。",[469,471,473,475],{"key":19,"text":470,"correct":21},"风险识别和风险分析与评价都是定性的",{"key":23,"text":472,"correct":21},"风险识别和风险分析与评价都是定量的",{"key":27,"text":474,"correct":25},"风险识别是定性的，风险分析与评价往往采用定性与定量相结合的方法",{"key":30,"text":476,"correct":21},"风险识别是定量的，风险分析与评价是定性的",{"id":478,"libraryId":5,"type":9,"typeLabel":15,"stem":479,"options":480,"answer":27,"analysis":32},1102754,"下列属于风险识别方法的是（ ）。",[481,483,485,487],{"key":19,"text":482,"correct":21},"计划评审技术法",{"key":23,"text":484,"correct":21},"调查打分法",{"key":27,"text":486,"correct":25},"经验数据法",{"key":30,"text":488,"correct":21},"敏感性分析法",{"id":490,"libraryId":5,"type":9,"typeLabel":15,"stem":491,"options":492,"answer":23,"analysis":32},1102755,"风险识别的最主要成果是（ ）。",[493,495,497,499],{"key":19,"text":494,"correct":21},"风险清单损失值",{"key":23,"text":496,"correct":25},"风险清单",{"key":27,"text":498,"correct":21},"风险事件发生概率",{"key":30,"text":500,"correct":21},"风险度量值",{"id":502,"libraryId":5,"type":9,"typeLabel":15,"stem":503,"options":504,"answer":30,"analysis":32},1102756,"下列风险识别方法中，有可能发现其他识别方法难以识别出的工程风险的方法是（ ）。",[505,507,509,510],{"key":19,"text":506,"correct":21},"流程图法",{"key":23,"text":508,"correct":21},"初始清单法",{"key":27,"text":486,"correct":21},{"key":30,"text":511,"correct":25},"风险调查法",{"id":513,"libraryId":5,"type":9,"typeLabel":15,"stem":514,"options":515,"answer":27,"analysis":32},1102757,"风险识别最主要成果是（ ）。",[516,518,520,521],{"key":19,"text":517,"correct":21},"风险调查打分表",{"key":23,"text":519,"correct":21},"风险分析",{"key":27,"text":496,"correct":25},{"key":30,"text":522,"correct":21},"风险计划",{"id":524,"libraryId":5,"type":9,"typeLabel":15,"stem":525,"options":526,"answer":23,"analysis":32},1102758,"风险事件K、L、M、N发生的概率分别为PK=5％、PL=8％、PM=12％、PN=15％，相应的损失后果分别为QK=30万元、QL=15万元、QM=10万元、QN=5万元，则风险量相等的风险事件为（ ）。",[527,529,531,533],{"key":19,"text":528,"correct":21},"K和M",{"key":23,"text":530,"correct":25},"L和M",{"key":27,"text":532,"correct":21},"M和N",{"key":30,"text":534,"correct":21},"K和N",{"id":536,"libraryId":5,"type":9,"typeLabel":15,"stem":537,"options":538,"answer":19,"analysis":32},1102759,"风险评价方法中，最常用、最简单且易于应用的方法是（ ）。",[539,540,542,543],{"key":19,"text":484,"correct":25},{"key":23,"text":541,"correct":21},"蒙特卡洛模拟法",{"key":27,"text":482,"correct":21},{"key":30,"text":488,"correct":21},{"id":545,"libraryId":5,"type":9,"typeLabel":15,"stem":546,"options":547,"answer":30,"analysis":32},1102760,"损失控制计划系统中，内容最广泛、具体措施最多的是（ ）。",[548,550,552,554],{"key":19,"text":549,"correct":21},"灾难计划",{"key":23,"text":551,"correct":21},"应急计划",{"key":27,"text":553,"correct":21},"转移计划",{"key":30,"text":555,"correct":25},"预防计划",{"id":557,"libraryId":5,"type":9,"typeLabel":15,"stem":558,"options":559,"answer":27,"analysis":32},1102761,"关于建设工程风险的损失控制对策的说法中，正确的是（ ）。",[560,562,564,566],{"key":19,"text":561,"correct":21},"预防损失措施的主要作用在于遏制损失的发展",{"key":23,"text":563,"correct":21},"减少损失措施的主要作用在于降低损失发生的概率",{"key":27,"text":565,"correct":25},"制定损失控制措施必须考虑其付出的费用和时间方面的代价",{"key":30,"text":567,"correct":21},"损失控制的计划系统应由质量计划.进度计划和投资计划构成",{"id":569,"libraryId":5,"type":9,"typeLabel":15,"stem":570,"options":571,"answer":19,"analysis":32},1102762,"发生损失的概率并不大，但当风险事件发生后产生的损失是灾难性的、无法弥补的，此时应采取（ ）。",[572,574,576,578],{"key":19,"text":573,"correct":25},"风险回避",{"key":23,"text":575,"correct":21},"损失控制",{"key":27,"text":577,"correct":21},"风险转移",{"key":30,"text":579,"correct":21},"风险自留",{"id":581,"libraryId":5,"type":9,"typeLabel":15,"stem":582,"options":583,"answer":19,"analysis":32},1102763,"在损失控制计划系统中，使因严重风险事件而中断的工程实施过程尽快全面恢复并减少进一步损失的计划是（ ）。",[584,585,587,588],{"key":19,"text":551,"correct":25},{"key":23,"text":586,"correct":21},"恢复计划",{"key":27,"text":549,"correct":21},{"key":30,"text":555,"correct":21},{"id":590,"libraryId":5,"type":9,"typeLabel":15,"stem":591,"options":592,"answer":23,"analysis":32},1102764,"承包商要求建设单位提供付款担保，属于承包商的（ ）的风险对策。",[593,595,597,598],{"key":19,"text":594,"correct":21},"保险转移",{"key":23,"text":596,"correct":25},"非保险转移",{"key":27,"text":575,"correct":21},{"key":30,"text":573,"correct":21},[600,603,606,609,612,615],{"id":9,"name":601,"category":7,"favorite":602},"领导干部任职前廉政法规知识测试题",92,{"id":604,"name":605,"category":7,"favorite":9},595,"建筑结构与设备",{"id":607,"name":608,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":610,"name":611,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":613,"name":614,"category":7,"favorite":8},534,"BIM工程师",{"id":616,"name":614,"category":7,"favorite":8},535]