[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1105920":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1105920,780,2,"多选题","在策划决策阶段，可行性研究应完成的内容有（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","进行市场研究，以解决工程建设的必要性问题",true,{"key":16,"text":17,"correct":18},"B","经济效益和社会效益的初步估计",false,{"key":20,"text":21,"correct":14},"C","进行工艺技术方法研究，以解决工程建设的技术可行性问题",{"key":23,"text":24,"correct":14},"D","进行财务和经济分析，以解决工程建设的经济合理性问题",{"key":26,"text":27,"correct":18},"E","资源情况、建设条件、协作关系的初步分析","ACD","2020版教材P10-11 本题考查的是工程建设程序。 可行性研究应完成以下工作内容：(1)进行市场研究，以解决工程建设的必要性问题；(2)进行工艺技术方法研究，以解决工程建设的技术可行性问题；(3)进行财务和经济分析，以解决工程建设的经济合理性问题。",{"id":6,"name":31,"category":32,"favorite":33},"监理概论","建筑工程",0]