[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1105798":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1105798,780,2,"多选题","（2020年真题）根据《建设工程质量管理条例》，关于施工单位质量责任的说法，正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","未经教育培训或考试不合格人员，不得上岗作业",true,{"key":16,"text":17,"correct":18},"B","发现设计文件有差错应及时要求设计单位修改",false,{"key":20,"text":21,"correct":14},"C","按有关要求对建筑材料、构配件进行检验",{"key":23,"text":24,"correct":18},"D","涉及结构安全的试块直接取样送检",{"key":26,"text":27,"correct":14},"E","隐蔽工程在隐蔽前，应通知建设单位和质量监督机构","ACE","教材页码P37-51 B错误，施工单位在施工过程中发现设计文件和图纸有差错的，应当及时提出意见和建议。 D错误，施工人员对涉及结构安全的试块、试件以及有关材料，应当在建设单位或者工程监理单位监督下现场取样，并送具有相应资质等级的质量检测单位进行检测。",{"id":6,"name":31,"category":32,"favorite":33},"监理概论","建筑工程",0]