[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1105265":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1105265,780,2,"多选题","（2020年真题）根据《标准监理招标文件》监理的工作内容有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","收到施工组织设计文件后编制监理规划",false,{"key":16,"text":17,"correct":18},"B","参加由委托人主持的第一次工地会议",true,{"key":20,"text":21,"correct":18},"C","检查施工承包人的试验室",{"key":23,"text":24,"correct":18},"D","查验施工承包人的施工测量放线成果",{"key":26,"text":27,"correct":18},"E","核查施工承包人对施工进度计划的调整","BCDE","教材页码P84-87 A错误，收到工程设计文件后编制监理规划，并在第一次工地会议7天前报委托人。",{"id":6,"name":31,"category":32,"favorite":33},"监理概论","建筑工程",0]