[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1105130":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1105130,780,2,"多选题","监理工作完成后，属于向建设单位提交的监理工作总结的主要内容有()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","建设工程监理合同履行情况",true,{"key":16,"text":17,"correct":14},"B","监理任务或监理目标完成情况评价",{"key":19,"text":20,"correct":14},"C","表明建设工程监理工作终结的说明",{"key":22,"text":23,"correct":24},"D","工程监理工作的成效和经验",false,{"key":26,"text":27,"correct":14},"E","由建设单位提供的供项目监理机构使用的办公用房、车辆、试验设施等的清单","ABCE","2020教材P91-94 向建设单位提交的监理工作总结，主要内容包括:工程概况;项目监理机构;建设工程监理合同履行情况;监理工作成效;监理工作中发现的问题及其处理情况;监理任务或监理目标完成情况评价;由建设单位提供的供项目监理机构使用的办公用房、车辆、试验设施等的清单;表明建设工程监理工作终结的说明;其他说明和建议等。",{"id":6,"name":31,"category":32,"favorite":33},"监理概论","建筑工程",0]