[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1105045":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1105045,780,2,"多选题","(2009年真题）对建设工程监理规划中项目监理机构人员配备方案审查的主要内容应当包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","组织形式是否与项目承发包模式相协调",false,{"key":16,"text":17,"correct":14},"B","监理人员的职责分工是否合理",{"key":19,"text":20,"correct":21},"C","监理人员的专业满足程度",true,{"key":23,"text":24,"correct":21},"D","监理人员的数量满足程度",{"key":26,"text":27,"correct":21},"E","派驻现场人员计划是否与工程进度计划相适应","CDE","本题考核项目监理机构的审核中，人员配备方面的内容。",{"id":6,"name":31,"category":32,"favorite":33},"监理概论","建筑工程",0]