[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1104960":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1104960,780,2,"多选题","(2019年真题）下列目标控制措施中，属于技术措施的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","确定目标控制工作流程",false,{"key":16,"text":17,"correct":18},"B","审查施工组织设计",true,{"key":20,"text":21,"correct":18},"C","采用网络计划技术进行工期优化",{"key":23,"text":24,"correct":18},"D","审核比较各种工程数据",{"key":26,"text":27,"correct":14},"E","确定合理的工程款计价方式","BCD","本题考查的是目标控制措施中的技术措施内容。",{"id":6,"name":31,"category":32,"favorite":33},"监理概论","建筑工程",0]