[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1104957":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1104957,780,2,"多选题","(2018年真题）下列目标控制措施中，属于经济措施的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","建立动态控制过程中的激励机制",false,{"key":16,"text":17,"correct":18},"B","审核工程量及工程结算报告",true,{"key":20,"text":21,"correct":18},"C","对工程变更方案进行技术经济分析",{"key":23,"text":24,"correct":14},"D","选择合理的承发包模式和合同计价方式",{"key":26,"text":27,"correct":18},"E","进行投资偏差分析和未完工程投资预测","BCE","本题考查的是目标控制。",{"id":6,"name":31,"category":32,"favorite":33},"监理概论","建筑工程",0]