[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1104954":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1104954,780,2,"多选题","(2016年真题）下列工作内容中，属于建设工程目标动态控制过程的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","组织",false,{"key":16,"text":17,"correct":18},"B","计划",true,{"key":20,"text":21,"correct":18},"C","执行",{"key":23,"text":24,"correct":18},"D","检查",{"key":26,"text":27,"correct":14},"E","协调","BCD","建设工程目标体系的动态控制过程包括PDCA（Plan-计划；Do-执行；Check-检查；Action-纠偏）。",{"id":6,"name":31,"category":32,"favorite":33},"监理概论","建筑工程",0]