[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1104821":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1104821,780,2,"多选题","下列选项中，必须有城建档案管理部门参加的预验收和验收的工程项目有()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","国家重点项目",true,{"key":16,"text":17,"correct":14},"B","省市重点项目",{"key":19,"text":20,"correct":21},"C","县级重点项目",false,{"key":23,"text":24,"correct":14},"D","某些特大型项目",{"key":26,"text":27,"correct":14},"E","某些大型项目","ABDE","2020教材P162-168 对国家、省市重点工程项目或一些特大型、大型工程项目的预验收和验收，必须有地方城建档案管理部门参加。 C选项(县级重点工程项目的预验收和验收)，不必有城建档案管理部门参加。",{"id":6,"name":31,"category":32,"favorite":33},"监理概论","建筑工程",0]