[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1104749":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1104749,780,2,"多选题","下列选项中，风险的分析与评价应采用()相结合的方法来进行，这二者之间并不是相互排斥的，而是相互补充的。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","定性",true,{"key":16,"text":17,"correct":14},"B","定量",{"key":19,"text":20,"correct":21},"C","定时",false,{"key":23,"text":24,"correct":21},"D","定质",{"key":26,"text":27,"correct":21},"E","定期","AB","2020版教材P171-180 本题考查的是建设工程风险管理。风险的分析与评价往往采用定性与定量相结合的方法来进行，这二者之间并不是相互排斥的，而是相互补充的。",{"id":6,"name":31,"category":32,"favorite":33},"监理概论","建筑工程",0]