[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1104748":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1104748,780,2,"多选题","下列选项中，属于损失控制计划系统中灾难计划应满足的要求有()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","安全撤离现场人员方案",true,{"key":16,"text":17,"correct":14},"B","援救及处理伤亡人员方案",{"key":19,"text":20,"correct":14},"C","控制事故发展和减少资产损害措施",{"key":22,"text":23,"correct":24},"D","调整施工进度计划方案",false,{"key":26,"text":27,"correct":24},"E","调整材料和设备采购计划方案","ABC","2020版教材P171-180 本题考查的是建设工程风险管理。灾难计划的内容应满足以下要求：安全撤离现场人员；援救及处理伤亡人员；控制事故的进一步发展，最大限度地减少资产和环境损害；保证受影响区域的安全尽快恢复正常。",{"id":6,"name":31,"category":32,"favorite":33},"监理概论","建筑工程",0]