[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1104609":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1104609,780,2,"多选题","下列关于开工日期的表述中，正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","不需要开槽的工程，以正式开始打桩的日期作为开工日期",true,{"key":16,"text":17,"correct":18},"B","施工用临时道路和水.电等工程开始施工的日期可以算作正式开工日期",false,{"key":20,"text":21,"correct":14},"C","分期建设的工程分别按各期工程开工的日期计算",{"key":23,"text":24,"correct":14},"D","水库等需要进行大量土石方工程的，以开始进行土石方工程施工的日期作为正式开工日期",{"key":26,"text":27,"correct":18},"E","平整场地开始施工的日期可以算作正式开工日期","ACD","考点:建设实施阶段的工作内容。选项B、E错误，工程地质勘察、平整场地、旧建筑物拆除、临时建筑、施工用临时道路和水、电等工程开始施工的日期不能算作正式开工日期。",{"id":6,"name":31,"category":32,"favorite":33},"监理概论","建筑工程",0]